Construction Staging Area Time Extension - Phase 2 - Yonge Street and Bloor Street West - 1 Bloor Street West
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2019-11-26 · Toronto City Council · adopted
As filed
City Council on November 26 and 27, 2019, adopted the following: 1. City Council authorize the continuation of the closure of the west sidewalk and a 3 metre wide portion of the southbound curb lane on Yonge Street, and the provision of a temporary sidewalk in the curb lane, between Bloor Street West and a point 66 metres south, from November 1, 2019 to August 31, 2020. 2. City Council authorize the continuation of the closure of the south sidewalk and a 1.2 metre wide portion of the eastbound curb lane on Bloor Street West, and the provision of a temporary sidewalk in the curb lane, between Yonge Street and a point 49 metres west, from November 1, 2019 to August 31, 2020.
Show the rest of As filed, 1,727 more characters as filed
3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Bloor Street West and Yonge Street be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on Yonge Street and Bloor Street West, City Council approval of this report is required. Mizrahi Developments is constructing a mixed-use development at 1 Bloor Street West. The site is located on the southwest corner of Yonge Street and Bloor Street West. The development will consist of an 8-storey high retail podium and an 86-storey high residential tower.
Show the rest of As the city filed it, 745 more characters as filed
Construction staging operations for the development currently take place within the road right-of-way on the south side of Bloor Street West and on the west side of Yonge Street. Phase 1 of construction involved excavation, piling and shoring operations and building to the ground level, which is nearing completion. City Council, at its meeting on October 2, 2017, authorized the subject construction staging areas from October 9, 2017 to October 31, 2019. Transportation Services is requesting authorization to extend the construction staging areas on Yonge Street and Bloor Street West for an additional ten months (i.e. from November 1, 2019 to August 31, 2020), in order to facilitate the construction of the 8-storey high podium (Phase 2).
Staff recommended
The Acting Director, Traffic Management, recommends that: 1. City Council authorize the continuation of the closure of the west sidewalk and a 3 metre wide portion of the southbound curb lane on Yonge Street, between Bloor Street West and a point 66 metres south, from November 1, 2019 to August 31, 2020. 2. City Council authorize the continuation of the closure of the south sidewalk and a 1.2 metre wide portion of the eastbound curb lane on Bloor Street West, between Yonge Street and a point 49 metres west, from November 1, 2019 to August 31, 2020.
Show the rest of Staff recommended, 1,727 more characters as filed
3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Bloor Street West and Yonge Street be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Considered
2019-11-05 · Toronto and East York Community Council · amended
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council authorize the continuation of the closure of the west sidewalk and a 3 metre wide portion of the southbound curb lane on Yonge Street, and the provision of a temporary sidewalk in the curb lane, between Bloor Street West and a point 66 metres south, from November 1, 2019 to August 31, 2020. 2. City Council authorize the continuation of the closure of the south sidewalk and a 1.2 metre wide portion of the eastbound curb lane on Bloor Street West, and the provision of a temporary sidewalk in the curb lane, between Yonge Street and a point 49 metres west, from November 1, 2019 to August 31, 2020.
Show the rest of Decision as filed, 1,727 more characters as filed
3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Bloor Street West and Yonge Street be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
2019-11-26 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of an Existing Public Lane East of Tecumseth Street, Extending Southerly from Richmond Street WestFiled record
- Naming of an Existing Public Lane North of Queen Street East, Extending between Parliament Street and Trefan StreetFiled record
- Naming of an Existing Public Lane East of Dawes Road, Extending Southerly from Donora DriveFiled record
- Naming of an Existing Public Lane North of Kingston Road, Extending Easterly from Lawlor AvenueFiled record
- Renaming of a Portion of Coxwell Avenue between Queen Street East and Lake Shore Boulevard EastFiled record
- 540-544 King Street West and 1-7 Morrison Street - Zoning By-law Amendment Application - Final ReportFiled record