The filed record
Extending the Road Alteration and Parking Amendment Pilot Project - Avenue Road
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2019-07-16 · Toronto City Council · adopted
As filed
City Council on July 16, 17 and 18, 2019, adopted the following: 1. City Council amend the previously approved lane configuration on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted by City Council on July 4, 5, 6 and 7, 2017 under Item TE25.88 headed "Road Alteration and Parking Amendment Pilot Project - Avenue Road", generally as shown in the attached Drawing 421G-3393, dated April 2019. 2. City Council
Show the rest of As filed, 400 more characters as filed
authorize the continuation of the Road Alteration and Parking Amendment Pilot Project on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted under Item TE25.88 on July 4, 5, 6 and 7, 2017 for an additional period of one year; the commencement of the new one-year trial period will begin upon the installation of the new lane configuration set out in Part 1 above under Drawing 421G-3393.
On the agenda
As the city filed it
City Council on July 4, 5, 6 and 7, 2017 adopted Item TE25.88 entitled 'Road Alteration and Parking Amendment Pilot Project -Avenue Road' and in so doing, approved the alteration of Avenue Road, between Lynwood Avenue and Balmoral Avenue, generally as shown on Drawing No. 421G-2393, dated February 2017. Upon completion of a one-year trial period, Avenue Road is to be returned to its previous conditions. Since the installation of the safety elements of the pilot project, my office has received positive feedback from the school and parents who take their children to Brown Junior Public School, along with advocates for more pedestrian safety on Avenue Road.
Show the rest of As the city filed it, 1,083 more characters as filed
We have also received constructive feedback as to how these alterations can be enhanced further, so that they can provide for more access and safety for cyclists as well as enhance traffic flow. In response to this feedback, Traffic Operations has developed a new lane configuration that we want to implement for a year and observe how these changes improve the overall effect of the pilot. The right-most lane will be a through/right turn lane, the centre lane will be a through lane and the left-most lane will be a through/left turn lane. The introduction of a through/left-turn lane beginning approximately 37 metres north of Balmoral Avenue generally as shown on Drawing No. 421G3393, date April 2019, will provide a separate storage for southbound left-turning vehicles. The width of the pilot area within the right-most lane has been decreased in order to provide a lane width increase to the centre lane. The increased lane width is intended to provide additional separation between a cyclist and a vehicle who are both travelling in the centre lane alongside the pilot area.
Staff recommended
Councillor Matlow recommends that: 1. City Council authorize an amendment to the previously approved lane configuration on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted by City Council on July 4, 5, 6 and 7, 2017 under Item TE25.88 entitled 'Road Alteration and Parking Amendment Pilot Project - Avenue Road', generally as shown in the attached Drawing 421G-3393, dated April 2019. 2. City Council, contingent upon approval of Recommendation 1 above, authorize the continuation of the Road Alteration and Parking Amendment Pilot Project on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted under Item TE25.88 on July 4, 5, 6 and 7, 2017 for an additional period of one year.
Show the rest of Staff recommended, 288 more characters as filed
The commencement of the new one-year trial period will begin upon the installation of the new lane configuration set out in Recommendation 1 under Drawing 421G-3393. 3. City Council direct that Avenue Road be returned to its previous conditions when the one-year trial period is complete.
Considered
2019-06-25 · Toronto and East York Community Council · amended
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council authorize an amendment to the previously approved lane configuration on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted by City Council on July 4, 5, 6 and 7, 2017 under Item TE25.88 entitled 'Road Alteration and Parking Amendment Pilot Project - Avenue Road', generally as shown in the attached Drawing 421G-3393, dated April 2019.
Show the rest of Decision as filed, 473 more characters as filed
2. City Council, contingent upon approval of Recommendation 1 above, authorize the continuation of the Road Alteration and Parking Amendment Pilot Project on Avenue Road, between Lynwood Avenue and Balmoral Avenue, adopted under Item TE25.88 on July 4, 5, 6 and 7, 2017 for an additional period of one year. The commencement of the new one-year trial period will begin upon the installation of the new lane configuration set out in Recommendation 1 under Drawing 421G-3393.
2019-07-16 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of an Existing Public Lane South of Richmond Street West, Extending Easterly from Tecumseth StreetFiled record
- Permanent Closure of Stratified Portion of Walton Street as Public HighwayFiled record
- 300 Bloor Street West and 478 Huron Street - Zoning Amendment Application - Final ReportFiled record
- Alterations to Heritage Properties at 300 Bloor Street West and 478 Huron Street, Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act and Authority to Enter into Heritage Easement Agreements at 300 Bloor Street West and 478 Huron StreetFiled record
- 3385 Dundas Street West - Zoning By-law Amendment Application - Final ReportFiled record
- 57-77 Wade Avenue - Zoning Amendment Application - Final ReportFiled record