The filed record
Construction Staging Area - St. Patrick Street (234 Simcoe Street)
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2019-10-10 · Toronto and East York Community Council · adopted
As filed
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 1.5 metre wide portion of the northbound bound lane on St Patrick Street, from a point 84 metres south of Dundas Street West and a point 92 metres further south and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from October 14, 2019 to December 31, 2022. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m.
Show the rest of As filed, 1,572 more characters as filed
to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of St. Patrick Street, between a point 79 metres south of Dundas Street West and a point 30 metres further south (109 metres) and between a point 121 metres south of Dundas Street West and a point 44 metres further south. 3. Authorized parking machines to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of St. Patrick Street, between a point 115 metres south of Dundas Street West and a point 11 metres further south. 4. Rescinded the existing commercial loading zone in effect at all times, on the west side of St. Patrick Street, between a point 109 metres south of Dundas Street West and a point 12 metres further south. 5. Enacted a commercial loading zone in effect at all times, on the west side of St. Patrick Street, between a point 146 metres south of Dundas Street West and a point 17.5 metres further south. 6. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Directed that St. Patrick Street be returned to its pre-construction traffic and parking regulations when the project is completed.
On the agenda
As the city filed it
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on St. Patrick Street for a period of 38 months. Lanterra Construction Management LTD. is building three towers, 17, 36 and 39-storey condominium.
Show the rest of As the city filed it, 358 more characters as filed
The project includes three and a half levels below grade with the P1 level for Toronto Parking Authority (TPA). The site is located on the east side of St. Patrick Street, between Dundas Street West to the north side, Simcoe Street to the east and Michael Sweet Avenue to the south. To enable construction, the applicant requires the aforementioned closures.
Staff recommended
The Acting Director, Traffic Management, Transportation Services, Toronto and East York District recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 1.5 metre wide portion of the northbound bound lane on St Patrick Street, from a point 84 metres south of Dundas Street West and a point 92 metres further south and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from October 14, 2019 to December 31, 2022.
Show the rest of Staff recommended, 1,966 more characters as filed
2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of St. Patrick Street, between a point 79 metres south of Dundas Street West and a point 30 metres further south (109 metres) and between a point 121 metres south of Dundas Street West and a point 44 metres further south. 3. Toronto and East York Community Council authorize parking machines to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $4.00 per hour and for a maximum period of 3 hours, on the west side of St. Patrick Street, between a point 115 metres south of Dundas Street West and a point 11 metres further south. 4. Toronto and East York Community Council rescind the existing commercial loading zone in effect at all times, on the west side of St. Patrick Street, between a point 109 metres south of Dundas Street West and a point 12 metres further south. 5. Toronto and East York Community Council enact a commercial loading zone in effect at all times, on the west side of St. Patrick Street, between a point 146 metres south of Dundas Street West and a point 17.5 metres further south. 6. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Toronto and East York Community direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Toronto and East York Community direct that St. Patrick Street be returned to its pre-construction traffic and parking regulations when the project is completed.
On the record
More from this meeting
- Naming of an existing Public Lane south of Barton Avenue, extending easterly from Clinton StreetFiled record
- Naming of existing Public Lane Bounded by Harbord Street, Manning Avenue, Bloor Street West and Clinton StreetFiled record
- Naming of two existing Public Lanes intersecting Wellesley Street East and Church Street in the Church Wellesley NeighbourhoodFiled record
- 2010-2016 Bathurst Street - Official Plan Amendment and Zoning Amendment - Final ReportFiled record
- 26-40 Birch Avenue - Zoning By-law Amendment Application - Final ReportFiled record
- 3258-3260 Dundas Street West - Draft Plan of Common Elements Condominium and Part Lot Control Exemption Applications - Final ReportFiled record