The Public GalleryToronto

Infrastructure and Environment Committee · 2020-10-06 · 2020.IE16.6

The filed record

Emergency Road Repair on York Downs Drive, East of Bathurst Street

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2020-10-27 · Toronto City Council · adopted

As filed

City Council on October 27, 28 and 30, 2020, adopted the following: 1. City Council direct the General Manager, Transportation Services to assess the condition of, and conduct emergency road repairs and pothole patching along, York Downs Drive, east of Bathurst Street, and meet with the local Councillor to review details and scheduling of scheduled, essential resurfacing work.

On the agenda

As the city filed it

A portion of York Downs Drive, east of Bathurst Street., has been scheduled for local road resurfacing by the Capital Program group. However, the timeline for this work is being driven (and delayed) by a Toronto Water watermain replacement project scheduled to take place in 2023. As the City coordinates and bundles infrastructure projects together, Transportation Services does not favour accelerating the resurfacing of York Downs Drive before the projected watermain replacement work takes place.

Show the rest of As the city filed it, 601 more characters as filed

York Downs Drive, east of Bathurst Street, has no sidewalks and has been badly damaged as a result of years of construction, usage and weather erosion. Residents have long been forced to walk on the road to reach retail and transit services along Bathurst Street. The current pandemic has only worsened the aforementioned situation as neighbours try to adhere to social distancing guidelines while safely navigating the many potholes along York Downs Drive. The street is in desperate need of emergency patching and repair, as we wait for substantial resurfacing work to take place in the near future.

Staff recommended

Councillor James Pasternack recommends that the Infrastructure and Environment Committee recommend that: 1. City Council direct the General Manager, Transportation Services to assess the condition of, and conduct emergency road repairs and pothole patching along, York Downs Drive, east of Bathurst Street, and meet with the local Councillor to review details and scheduling of scheduled, essential resurfacing work.

Considered

  • 2020-10-06 · Infrastructure and Environment Committee · adopted

    Decision as filed

    The Infrastructure and Environment Committee recommends that: 1. City Council direct the General Manager, Transportation Services to assess the condition of, and conduct emergency road repairs and pothole patching along, York Downs Drive, east of Bathurst Street, and meet with the local Councillor to review details and scheduling of scheduled, essential resurfacing work.

  • 2020-10-27 · Toronto City Council · adopted

On the record

The item as the City filed it

More from this meeting