Construction Staging Area - 1408 to 1420 Bayview Avenue

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2021-10-01 · Toronto City Council · amended

As filed

City Council on October 1 and 4, 2021, adopted the following: 1. City Council authorize the closure of the west sidewalk and the southbound curb lane on Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south, from October 1, 2021 to September 30, 2022. 2. City Council rescind the existing no parking prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the west side of Bayview Avenue between a point 26 metres south of Balliol Street and a point 49 metres further south.

Show the rest of As filed, 2,971 more characters as filed

3. City Council rescind the existing no stopping regulation in effect from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays, on the west side of Bayview Avenue between a point 26 metres south of Balliol Street and a point 49 metres further south. 4. City Council rescind the existing maximum one-hour parking regulation, in effect from 9:00 a.m. to 4:00 p.m. daily, on the west side of Bayview Avenue between a point 26 metres south of Balliol Street and a point 49 metres further south. 5. City Council prohibit stopping at all times on the west side of Bayview Avenue between a point 26 metres south of Balliol Street and a point 49 metres further south. 6. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed, to be cleared of any construction debris and made safe. 7. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and residents' associations in advance of any physical road modifications. 9. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. 10. City Council direct the applicant to provide a sufficient number of traffic control persons, as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers, as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large- scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for nighttime illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. City Council direct that Bayview Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

On the agenda

As the city filed it

As the Toronto Transit Commission (TTC) operates a transit service on Bayview Avenue, City Council approval of this report is required. 1414 Bayview Dev Gp Inc. is constructing an eight-storey condominium with ground floor retail at 1408 to 1420 Bayview Avenue. The site is located on the west side of Bayview Avenue between Balliol Street and Merton Street. Transportation Services is requesting approval to close the west sidewalk and a portion of the southbound curb lane on Bayview Avenue for a period of 12 months (i.e.

Show the rest of As the city filed it, 496 more characters as filed

October 1, 2021 to September 30, 2022) to accommodate a construction staging area. Pedestrian operations on the west side of Bayview Avenue will be maintained in a 1.5 metre-wide covered and protected walkway within the closed portion of the existing lane. The construction staging area on Bayview Avenue will result in the loss of one southbound traffic lane. There will still be one 3.3 metre-wide southbound lane for traffic and there will be no impact on the two northbound lanes for traffic.

Staff recommended

The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the west sidewalk and the southbound curb lane on Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south, from October 1, 2021 to September 30, 2022. 2. City Council rescind the existing no parking prohibition in effect from 4:00 p.m. to 6:00 p.m. Monday to Friday, except public holidays, on the west side of Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south.

Show the rest of Staff recommended, 2,969 more characters as filed

3. City Council rescind the existing no stopping regulation in effect from 7:00 a.m. to 9:00 a.m. Monday to Friday, except public holidays, on the west side of Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south. 4. City Council rescind the existing maximum one-hour parking regulation, in effect from 9:00 a.m. to 4:00 p.m. daily, on the west side of Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south. 5. City Council prohibit stopping at all times on the west side of Bayview Avenue, between a point 26 metres south of Balliol Street and a point 49 metres further south. 6. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. 10. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. City Council direct that Bayview Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.