The Public GalleryToronto

North York Community Council · 2021-09-13 · 2021.NY26.16

The filed record

Construction Staging Area - 146 to 150 Laird Drive

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2021-09-13 · North York Community Council · referred

As filed

North York Community Council: 1. Referred the Item back to staff and directed the Acting Director, Traffic Management, Transportation Services to: a. report back once the developer establishes a Construction Liaison Committee with neighbourhood representatives; b. explore options to shorten the timeline for the proposed sidewalk and lane closures, with a view to prioritizing pedestrian safety and eliminating the sidewalk closure if possible; and c.

Show the rest of As filed, 236 more characters as filed

work with the community and developer to establish an immediate strategy to mitigate potential traffic infiltration on nearby residential streets and improve traffic flow on Laird Drive for the duration of the lane and sidewalk closure.

On the agenda

As the city filed it

As the Toronto Transit Commission (TTC) operates a transit service on Laird Drive, City Council approval of this report is required. Maystar General Contractors Inc. is constructing an eight-storey retirement home at 146 to 150 Laird Drive. The site is located on the west side of Laird Drive between McRae Drive/ Wicksteed Avenue and Commercial Road. Transportation Services is requesting approval to close the west sidewalk on Laird Drive for a period of 39 months (i.e.

Show the rest of As the city filed it, 767 more characters as filed

October 1, 2021 to December 31, 2024) to facilitate construction staging operations. Pedestrian movements on the west side of Laird Drive abutting the site will be restricted and pedestrians will be directed to the east side sidewalk of Laird Drive. In addition, Transportation Services is requesting approval to close a portion of the southbound curb lane on Laird Drive for a period of 24 months (i.e. October 1, 2021 to October 1, 2023) to accommodate a construction staging area. The contractor may be required to occupy the curb lane on a daily basis beyond October 1 2023, for which daily street occupation permits would be issued. Southbound traffic will be maintained in one 3.7-metre-wide lane and there will be no impact on the two northbound traffic lanes.

Staff recommended

The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the west sidewalk on Laird Drive, between a point 38 metres south of McRae Drive/ Wicksteed Avenue and a point 135 metres further south, from October 1, 2021 to December 31, 2024. 2. City Council authorize the closure of the southbound curb lane on Laird Drive, between a point 38 metres south of McRae Drive/ Wicksteed Avenue and a point 135 metres further south, from October 1, 2021 to October 1, 2023.

Show the rest of Staff recommended, 2,666 more characters as filed

3. City Council rescind the existing no parking prohibition in effect on Saturdays and Sundays on the west side of Laird Drive between McRae Drive/ Wicksteed Avenue and a point 173 metres south. 4. City Council rescind the existing no stopping regulation in effect from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. Monday to Friday on the west side of Laird Drive between McRae Drive/ Wicksteed Avenue and a point 173 metres south. 5. City Council prohibit stopping at all times on the west side of Laird Drive between McRae Drive/ Wicksteed Avenue and a point 173 metres south. 6. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. 9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. City Council direct that Laird Drive be returned to its pre-construction traffic and parking regulations when the project is complete.

    On the record

    The item as the City filed it

    More from this meeting

    The whole meeting