Construction Staging Area - 1-25 Defries Street

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2021-04-21 · Toronto and East York Community Council · amended

As filed

The Toronto and East York Community Council: 1. Authorized the closure of a 3.2 metre-wide portion of the northbound curb lane on Defries Street, between Labatt Avenue and Mark Street, from April 22, 2021 to April 30, 2022. 2. Rescinded the existing parking prohibition in effect at all times on the east side of Defries Street, between a point 52 metres south of Mark Street and Labatt Avenue. 3. Rescinded the existing parking prohibition in effect at all times on the east side of Defries Street, between Mark Street and a point 20 metres south.

Show the rest of As filed, 3,108 more characters as filed

4. Rescinded the existing permit parking in effect from 12:01 a.m. to 7:00 a.m., on the odd side of Defries Street, between Labatt Avenue and Mark Street. 5. Prohibited stopping at all times on the east side of Defries Street, between Labatt Avenue and Mark Street. 6. Rescinded the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., on the south side of Mark Street, between River Street and Defries Street. 7. Authorized maximum a one-hour parking regulation to be in effect from 8:00 a.m. to 6:00 p.m., on the south side of Mark Street, between River Street and a point 15 metres west of Defries Street 8. Rescinded the existing parking prohibition in effect at all times on the south side of Mark Street, between Defries Street the east end of Mark Street. 9. Prohibited stopping at all times on the south side of Mark Street, between a point 15 metres west of Defries Street and the east end of Mark Street. 10. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Directed that Defries Street and Mark Street be returned to its pre-construction traffic and parking regulations when the project is complete. 18. Directed the applicant to establish a construction management working group that meets monthly and to invite local stakeholders including Transportation Services, Municipal Licensing and Standards, and Toronto Buildings staff, adjacent neighbours, and local resident groups.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Broccolini is constructing a 37-storey condominium with 580 residential units, at 1-25 Defries Street. Transportation Services is requesting authorization to close a 3.2 metre-wide portion of the northbound curb lane on Defries Street, between Labatt Avenue and Mark Street, for a period of 24 months (i.e., April 22, 2021 to April 30, 2023) to accommodate a construction staging area.

Show the rest of As the city filed it, 224 more characters as filed

The construction staging area on the east side of Defries Street will result in the loss of one northbound traffic lane that is currently designated for on-street parking resulting in the loss of eight permit parking spaces.

Staff recommended

The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of a 3.2 metre-wide portion of the northbound curb lane on Defries Street, between Labatt Avenue and Mark Street, from April 22, 2021 to April 30, 2023. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Defries Street, between a point 52 metres south of Mark Street and Labatt Avenue.

Show the rest of Staff recommended, 3,554 more characters as filed

3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Defries Street, between Mark Street and a point 20 metres south. 4. Toronto and East York Community Council rescind the existing permit parking in effect from 12:01 a.m. to 7:00 a.m., on the odd side of Defries Street, between Labatt Avenue and Mark Street. 5. Toronto and East York Community Council prohibit stopping at all times on the east side of Defries Street, between Labatt Avenue and Mark Street. 6. Toronto and East York Community Council rescind the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., on the south side of Mark Street, between River Street and Defries Street. 7. Toronto and East York Community Council authorize maximum a one-hour parking regulation to be in effect from 8:00 a.m. to 6:00 p.m., on the south side of Mark Street, between River Street and a point 15 metres west of Defries Street 8. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the south side of Mark Street, between Defries Street the east end of Mark Street. 9. Toronto and East York Community Council prohibit stopping at all times on the south side of Mark Street, between a point 15 metres west of Defries Street and the east end of Mark Street. 10. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Toronto and East York Community Council direct that Defries Street and Mark Street be returned to its pre-construction traffic and parking regulations when the project is complete.