Construction Staging Area - 11-25 Yorkville Avenue West

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2021-05-19 · Toronto and East York Community Council · adopted

As filed

The Toronto and East York Community Council: 1. Authorized the closure of the south sidewalk and a two-metre-wide portion of the eastbound curb lane on Yorkville Avenue, between a point 53 metres west of Yonge Street and a point 55 metres further west, from, May 20, 2021 to December 31, 2024. 2. Amended the existing standing prohibition in effect at all times on the north side of Yorkville Avenue, between and a point 119.5 metres east of Bay Street and Yonge Street to be in effect from Yonge Street and a point 50 metres further west.

Show the rest of As filed, 2,232 more characters as filed

3. Prohibited stopping at all times on the north side of Yorkville Avenue, between a point 50 metres west of Yonge Street and a point 119.5 metres east of Bay Street. 4. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Directed that Yorkville Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority to make a final. 11 Yorkville Partners Inc., is constructing a 62-storey residential condominium building with ground floor retail at 11-25 Yorkville Avenue West. The site is located on the south side of Yorkville Avenue mid-block between Yonge Street and Bay Street. Transportation Services is requesting authorization to close the south sidewalk and a two-metre-wide portion of the eastbound curb lane on Yorkville Avenue, between a point 53 metres west of Yonge Street and a point 55 metres further west, for a period of 43 months (i.e., May 20, 2021 to December 31, 2024) to accommodate a construction staging area.

Show the rest of As the city filed it, 579 more characters as filed

Pedestrian movements on the south side of Yorkville Avenue abutting the site will be restricted and pedestrians will be directed to the north side sidewalk of Yorkville Avenue. Traffic lanes on Yorkville Avenue, abutting the site, will be realigned to maintain two 3.25 metre lanes for eastbound and westbound traffic. Pedestrian operations on the north side of Yorkville Avenue will be maintained in their current configuration. In addition, covered and overhead protection will be installed on portions of the unnamed public lanes immediately to the east and south of the site.

Staff recommended

The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south sidewalk and a two-metre-wide portion of the eastbound curb lane on Yorkville Avenue, between a point 53 metres west of Yonge Street and a point 55 metres further west, from, May 20, 2021 to December 31, 2024. 2. Toronto and East York Community Council amend the existing standing prohibition in effect at all times on the north side of Yorkville Avenue, between and a point 119.5 metres east of Bay Street and Yonge Street to be in effect from Yonge Street and a point 50 metres further west.

Show the rest of Staff recommended, 2,614 more characters as filed

3. Toronto and East York Community Council prohibited stopping at all times on the north side of Yorkville Avenue, between a point 50 metres west of Yonge Street and a point 119.5 metres east of Bay Street. 4. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Toronto and East York Community Council direct that Yorkville Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.