North York Community Council · 2022-06-28 · 2022.NY33.44

The filed record

Thomas Clark Way Extension Progress Update

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2022-06-28 · North York Community Council · adopted

As filed

North York Community Council: 1. Received the report (June 10, 2022) from the Director, Project Design and Management, Transportation Services for information.

On the agenda

As the city filed it

Thomas Clark Way is a planned street that will serve the community located to the southeast of the Bayview Avenue and Sheppard Avenue East intersection. The street will extend approximately 200 metres (m) between Kenaston Gardens in the west and Rean Drive in the east, with a two-way stop-controlled intersection at Barberry Place. The street will have a right-of-way width varying between 16.5m and 20.0m with a paved surface of 8.5 m, including wide sidewalks on both sides of the street and grassed boulevard space.

Show the rest of As the city filed it, 444 more characters as filed

Portions of Thomas Clark Way have been constructed between Rean Drive and Barberry Place and between Barberry Place and Kenaston Gardens. These sections are dedicated as a future public road but are not yet assumed by the City. The remaining segment of Thomas Clark Way will be delivered by the City. Detailed design for the remaining segment is underway and anticipated to be completed by Q1 2023. Construction is anticipated to begin in 2023.

Staff recommended

The Director, Project Design and Management, Transportation Services recommends that: 1. North York Community Council receive this report for information.