The Public GalleryToronto

Toronto and East York Community Council · 2022-06-29 · 2022.TE34.27

The filed record

215 Wellesley Street East - Zoning Amendment Application - Final Report

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2022-07-19 · Toronto City Council · adopted

As filed

City Council on July 19, 20, 21 and 22, 2022, adopted the following: 1. City Council amend Zoning By-law 438-86 for the lands at 215 Wellesley Street East, substantially in accordance with the draft Zoning By-law Amendment in Attachment 1 to the supplementary report (June 28, 2022) from the Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

Show the rest of As filed, 1,265 more characters as filed

3. Before introducing the necessary Bills to City Council for enactment, require the owner: a. submit a revised Functional Servicing and Stormwater Management Report, Hydrogeological Report and supporting documents (the "Engineering Reports"), including confirmation of water and fire flow, sanitary and storm capacity, to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, in consultation with the General Manager, Toronto Water; b. address all outstanding engineering issues and any other comments that may arise further to the review of materials submitted as part of the process to address the issues set out in the memoranda from Engineering and Construction Services, and the General Manager, Transportation Services; and c. secure the design and the provision of financial securities for any upgrades or required improvements to the existing municipal infrastructure and/or new municipal infrastructure identified in the accepted Engineering Reports to support the development, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements or upgrades and/or new infrastructure are required to support the development.

On the agenda

As the city filed it

This report reviews and recommends approval of the application to amend the Zoning By-law to permit an 8-storey mixed-use building at 215 Wellesley Street East. The building is proposed to contain 32 dwelling units, replacement of 16 bed-sitting rooms associated with supportive housing and 222 square metres of community support services. One parking space for the residential care home and six short-term bike parking spaces are proposed in the rear yard.

Staff recommended

The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 215 Wellesley Street East, substantially in accordance with the draft Zoning By-law Amendment attached as Attachment 5 to the report (June 13, 2022) from the Director, Community Planning, Toronto and East York District. 2. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

Show the rest of Staff recommended, 1,261 more characters as filed

3. Before introducing the necessary Bills to City Council for enactment, require the owner: a) Submit a revised Functional Servicing and Stormwater Management Report, Hydrogeological Report and supporting documents (the "Engineering Reports"), including confirmation of water and fire flow, sanitary and storm capacity, to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services in consultation with the General Manager, Toronto Water; b) Address all outstanding engineering issues, and any other comments that may arise further to the review of materials submitted as part of the process to address the issues set out in the memoranda from Engineering and Construction Services, and the General Manager, Transportation Services; c) Secure the design and the provision of financial securities for any upgrades or required improvements to the existing municipal infrastructure and/or new municipal infrastructure identified in the accepted Engineering Reports to support the development, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements or upgrades and/or new infrastructure are required to support the development;

Considered

  • 2022-06-29 · Toronto and East York Community Council · amended

    Decision as filed

    The Toronto and East York Community Council recommends that: 1. City Council amend Zoning By-law 438-86 for the lands at 215 Wellesley Street East, substantially in accordance with the draft Zoning By-law Amendment in Attachment 1 to the supplementary report (June 28, 2022) from the Director, Community Planning, Toronto and East York District. 2. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

    Show the rest of Decision as filed, 1,265 more characters as filed

    3. Before introducing the necessary Bills to City Council for enactment, require the owner: a. Submit a revised Functional Servicing and Stormwater Management Report, Hydrogeological Report and supporting documents (the "Engineering Reports"), including confirmation of water and fire flow, sanitary and storm capacity, to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services in consultation with the General Manager, Toronto Water; b. Address all outstanding engineering issues, and any other comments that may arise further to the review of materials submitted as part of the process to address the issues set out in the memoranda from Engineering and Construction Services, and the General Manager, Transportation Services; and c. Secure the design and the provision of financial securities for any upgrades or required improvements to the existing municipal infrastructure and/or new municipal infrastructure identified in the accepted Engineering Reports to support the development, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements or upgrades and/or new infrastructure are required to support the development.

    Clerk’s note

    The Toronto and East York Community Council held a statutory public meeting on June 29, 2022 and notice was given in accordance with the Planning Act.

  • 2022-07-19 · Toronto City Council · adopted

On the record

The item as the City filed it

More from this meeting

The whole meeting