The decision
2023-05-10 · Toronto City Council · adopted
As filed
City Council on May 10, 11 and 12, 2023, adopted the following: 1. City Council adopt the confidential instructions to staff in Confidential Attachment 1 to the report (January 30, 2023) from the City Solicitor. 2. City Council direct that the confidential instructions in Confidential Attachment 1 to the report (January 30, 2023) from the City Solicitor remain confidential at the discretion of the City Solicitor, and that the balance of Confidential Attachment 1 to the report (January 30, 2023) from the City Solicitor remain confidential in its entirety as it pertains to litigation and contains advice that is subject to litigation and solicitor-client privilege.
Show the rest of As filed, 481 more characters as filed
Confidential Attachment 1 to the report (January 30, 2023) from the City Solicitor remains confidential at this time in accordance with the provisions of the City of Toronto Act, 2006, as it pertains to litigation and contains advice that is subject to litigation and solicitor-client privilege. The confidential instructions to staff in Confidential Attachment 1 to the report (January 30, 2023) from the City Solicitor will be made public at the discretion of the City Solicitor.
On the agenda
As the city filed it
Background The Toronto Police Service operates a data centre ("the "Data Centre") that is located in a building owned by the City. Responsibilities for the Data Centre are shared; the Toronto Police Service is responsible for the data room and related systems and the City (through its Corporate Real Estate Division) is responsible for building operations including the mechanical and electrical systems, life safety equipment, overall building envelope, and general management of the building.
Show the rest of As the city filed it, 4,362 more characters as filed
The Data Centre houses computer hardware, software, and related equipment and technology to support network and information technology services for the Toronto Police Service. The location of the Data Centre and its functionality is confidential. Construction of the Data Centre commenced in August 2017. It was substantially complete by November, 2018 and turned over to the City to operate and maintain. Fit up of the Data Centre by Toronto Police Service with computer and network equipment was completed in September 2019. In early 2021, Toronto Police Service staff observed significant unexpected corrosion on computer hardware components and certain metal surfaces in the Data Centre. In order to mitigate against potentially catastrophic system failures, Toronto Police Service locked down the building while it explored options to relocate the data systems. By mid-2021, Toronto Police Service had moved all operations from the Data Centre to other locations and taken all of the computer equipment offline. Toronto Police Service determined that corrosion observed on some of the computer systems compromised the equipment's integrity and, therefore, created operational risks. Accordingly, Toronto Police Service determined that it was necessary to relocate staff and operations to another facility, pending the completion of its investigation into the causes of the corrosion, the implementation of appropriate measures to prevent future damage to its computer systems, and the replacement of the computer systems in the Data Centre. The Construction of the Data Centre In 2014, the Toronto Police Services Board recognized that its current disaster recovery data centre was at its maximum capacity and located too close to the main site to meet industry standards for business continuity purposes. For these reasons Toronto Police Service received approval as part of its 2015-2024 capital program to replace the existing data centre with a new facility that would meet its operational requirements. Following the approval of this construction project, the Toronto Police Services Board awarded MMM Group Limited ("MMM Group") with the architectural design and consulting services contract for the Data Centre. As part of its contractual work, MMM Group developed site selection criteria and reviewed suitable sites with the City of Toronto Real Estate Division. In 2016, the City acquired the property on which the Data Centre would ultimately be constructed. In July of 2016 the Toronto Police Services Board entered into a contract with Eastern Construction Company Limited for construction management and construction services for the Data Centre project based on the designs and specifications prepared by MMM Group. The Data Centre was designed to include, among other things, heating, ventilation, and air conditioning systems that were capable of maintaining a consistent level of temperature and humidity within the Data Centre. These key heating, ventilation, and air conditioning systems were manufactured by KyotoCooling North America LLC and Stulz Air Technology Systems Inc. and commissioned by Jones Lang LaSalle Real Estate Services, Inc. The Data Centre was substantially completed in November 2018 and the City contracted with Bouygues Energies and Services Canada Limited and Plan Group Inc. for the general maintenance of the Data Centre and ongoing maintenance of the mechanical and heating, ventilation, and air conditioning systems. The Toronto Police Services Board entered into contracts with DP Environmental Service Inc. for specialized cleaning of the Data Centre computer equipment, preparing environmental assessments, and concrete sealing of the Data Centre subfloor. Confidential Attachment 1 contains legal advice from the City Solicitor with respect to ongoing investigation of the issues and legal action against the parties contracted to design and construct the building, to install heating and cooling and building management systems, and to clean and maintain the Data Centre. A statement of claim was issued on December 21, 2022 in order to recover the losses incurred as a result of the property damage, the anticipated costs to address the existing deficiencies that led to the damage, and associated costs to relocate staff and equipment while the investigation, design and construction work is undertaken.
Staff recommended
The City Solicitor recommends that: 1. City Council adopt the confidential instructions to staff in Confidential Attachment 1. 2. City Council direct that the confidential instructions in Confidential Attachment 1 remain confidential at the discretion of the City Solicitor and that the balance of Confidential Attachment 1 remain confidential in its entirety as it pertains to litigation and contains advice that is subject to litigation and solicitor-client privilege.
On the record
More from this meeting
- Introduction of General Bills and Confirming BillsFiled record
- Ombudsman Toronto 2022 Annual ReportFiled record
- Letter of Intent between the City and Maple Leaf Sports and Entertainment regarding the 2026 World CupFiled record
- Supporting Small Businesses: Calling on the Federal Government to Forgive a Portion of the Canada Emergency Business Account Loans - by Councillor Paula Fletcher, seconded by Councillor Alejandra BravoFiled record
- Call to OrderFiled record
- Appointment of Public Members to the Dangerous Dog Review TribunalFiled record