The filed record
801 The Queensway - Construction Staging Area
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2023-09-18 · Etobicoke York Community Council · deferred
As filed
The Etobicoke York Community Council: 1. Deferred consideration of the item until the October 16, 2023 meeting of the Etobicoke York Community Council.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on The Queensway, City Council approval of this report is required. Marlin Spring Developments is constructing a ten-storey residential condominium building together with retail use on the ground floor at 801 The Queensway. The site is located on the south-east corner of The Queensway and Taymall Avenue. Transportation Services is requesting approval to close the south sidewalk and a portion of the south side eastbound curb lane on The Queensway for a period of 14 months, from November 1, 2023 to December 31, 2024, to facilitate construction staging operations.
Show the rest of As the city filed it, 507 more characters as filed
Pedestrian movements on the south side of The Queensway, abutting the site, will be maintained in a minimum 2.1 metre-wide covered and protected walkway. Additionally, approval is being requested to close the northbound curb lane, the east sidewalk and 1.0 metre wide portion of the northbound left-turn lane on Taymall Avenue for a period of 14 months. Pedestrian movements on the east side of Taymall Avenue, abutting the site, will be maintained in a minimum 2.1 metre-wide covered and protected walkway.
Staff recommended
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the south sidewalk and the eastbound curb lane on The Queensway, between Taymall Avenue a point 67.7 metres further east, and provision of a temporary minimum 2.1 metre-wide pedestrian walkway within the closed portion of the eastbound curb lane, from November 1, 2023 to December 31, 2024. 2. City Council authorize the closure of the northbound curb lane, the east sidewalk and 1.0 metre wide portion of the northbound left-turn lane on Taymall Avenue, between The Queensway and a point 50 metres further south, and provision of a temporary minimum 2.1 metre-wide pedestrian walkway within the closed portion of the northbound lanes, from November 1, 2023 to December 31, 2024.
Show the rest of Staff recommended, 3,539 more characters as filed
3. City Council rescind the existing parking prohibition in effect at all times on the south side of The Queensway, between Taymall Avenue and a point 67.7 metres east. 4. City Council prohibit stopping at all times on the south side of The Queensway, between Taymall Avenue and a point 67.7 metres east. 5. City Council rescind the existing parking prohibition in effect at all times on the both sides of Taymall Avenue, between The Queensway and a point 78.8 metres south. 6. City Council prohibit stopping at all times on both sides of Taymall Avenue, between The Queensway and a point 78.8 metres south. 7. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 8. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 9. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 15. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 18. City Council direct that The Queensway and Taymall Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
On the record
More from this meeting
- 175-185 Eileen Avenue - Zoning By-law Amendment - Decision Report - ApprovalFiled record
- 15 Canmotor Avenue - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 5, 6 and 9 Jopling Avenue South - Zoning By-law Amendment - Decision Report - ApprovalFiled record
- 56, 58 and 60 Fieldway Road - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 111 Plunkett Road - Part Lot Control Exemption - Decision Report - ApprovalFiled record
- 159 and 161-181 Mulock Avenue and 6 Lloyd Avenue - Zoning By-law Amendment Application - Appeal ReportFiled record