Infrastructure and Environment Committee · 2023-01-30 · 2023.IE1.3

The filed record

Construction Staging Area Time Extension - 75 Broadway Avenue

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2023-02-07 · Toronto City Council · adopted

As filed

City Council on February 7 and 8, 2023, adopted the following: 1. City Council authorize the continuation of the closure south sidewalk and a 2.7 metre-wide portion of the westbound south-side curb lane on Broadway Avenue, between a point 71.5 metres west of Redpath Avenue and a point 40.5 metres further west, from March 1, 2023 to June 30, 2025. 2. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

Show the rest of As filed, 2,327 more characters as filed

3. City Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. City Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. City Council direct the applicant to continue to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. City Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. City Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. City Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. City Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. City Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 12. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

The vote

On the agenda

As the city filed it

This report is submitted to Infrastructure and Environment Committee as Broadway Avenue forms a shared boundary between the Toronto and East York Community Council and the North York Community Council. Hazelview Investments is constructing one 38-storey residential rental tower at 73 Broadway Avenue that will be connected to the remaining portion of 75 Broadway Avenue through the common first-floor and underground parking.

Show the rest of As the city filed it, 1,331 more characters as filed

The site is located on the south side of Broadway Avenue, mid-block between Yonge Street and Redpath Avenue. The south sidewalk and a 2.7 metre-wide portion of the westbound south-side curb lane on Broadway Avenue are currently closed for construction staging operations. Pedestrian operations on the south side of Broadway Avenue are maintained in a 2.1 metre-wide covered and protected walkway within the closed portion of the existing lane. City Council, at its meeting on November 9, 10 and 12, 2021, approved the subject construction staging area, between a point 71.5 metres west of Redpath Avenue and a point 40.5 metres further west, from March 1, 2022 to February 28, 2023. At the time, the developer indicated they would require the staging area for a total of 42 months, from March 1, 2022 to August 31, 2025. As the previous permit was only approved for a 12-month period, and as the developer has had experienced delays due to labour issues, the developer has requested an extension of the duration of the construction staging area on Broadway Avenue in order to complete the construction of the development. Transportation Services is requesting authorization to extend the duration of the construction staging area from March 1, 2023 to June 30, 2025 to allow for the construction of the development to be completed.

Staff recommended

The General Manager, Transportation Services recommends that: 1. City Council authorize the continuation of the closure south sidewalk and a 2.7 metre-wide portion of the westbound south-side curb lane on Broadway Avenue, between a point 71.5 metres west of Redpath Avenue and a point 40.5 metres further west, from March 1, 2023 to June 30, 2025. 2. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

Show the rest of Staff recommended, 2,327 more characters as filed

3. City Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. City Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. City Council direct the applicant to continue to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. City Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. City Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. City Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. City Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. City Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 12. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

Considered

  • 2023-01-30 · Infrastructure and Environment Committee · adopted

    Decision as filed

    The Infrastructure and Environment Committee recommends that: 1. City Council authorize the continuation of the closure south sidewalk and a 2.7 metre-wide portion of the westbound south-side curb lane on Broadway Avenue, between a point 71.5 metres west of Redpath Avenue and a point 40.5 metres further west, from March 1, 2023 to June 30, 2025. 2. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

    Show the rest of Decision as filed, 2,327 more characters as filed

    3. City Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. City Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. City Council direct the applicant to continue to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. City Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. City Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. City Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. City Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. City Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 12. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

  • 2023-02-07 · Toronto City Council · adopted