The filed record
St. Patrick Street (234 Simcoe Street) - Construction Staging Area Time Extension
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2023-01-26 · Toronto and East York Community Council · adopted
As filed
The Toronto and East York Community Council: 1. Authorized the continuation of the closure of the east sidewalk and a 1.5 metre wide portion of the northbound lane on St. Patrick Street, from a point 84 metres south of Dundas Street West and a point 92 metres further south, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from January 27, 2023 to March 31, 2024. 2.
Show the rest of As filed, 2,262 more characters as filed
Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 3. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 5. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Directed the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed that St. Patrick Street be returned to its pre-construction traffic and parking regulations when the project is completed.
On the agenda
As the city filed it
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Lanterra Construction Management LTD. is building three towers, 17, 36 and 39-storey condominiums. The site is located on the east side of St. Patrick Street, between Dundas Street West to the north side, Simcoe Street to the east and Michael Sweet Avenue to the south. The east sidewalk and a 1.5 metre wide portion of the northbound lane on St.
Show the rest of As the city filed it, 744 more characters as filed
Patrick Street, from a point 84 metres south of Dundas Street West to a point 92 metres further south, are currently closed for construction staging operations. Toronto and East York Community Council, at its meeting on October 10, 2019, approved the subject construction staging area on St. Patrick Street from October 14, 2019 to December 31, 2022. The developer has requested an extension of the duration of the construction staging area on St. Patrick Street, as the site has experienced COVID-19 related construction delays. Transportation Services is requesting authorization to extend the duration of the construction staging areas from January 27, 2023 to March 31, 2024 to allow for the construction of the development to be completed.
Staff recommended
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the continuation of the closure of the east sidewalk and a 1.5 metre wide portion of the northbound lane on St. Patrick Street, from a point 84 metres south of Dundas Street West and a point 92 metres further south, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from January 27, 2023 to March 31, 2024.
Show the rest of Staff recommended, 2,621 more characters as filed
2. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 3. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Toronto and East York Community Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community direct that St. Patrick Street be returned to its pre-construction traffic and parking regulations when the project is completed.
On the record
More from this meeting
- 17 St. Andrew Street - Zoning Amendment Application - Decision Report - ApprovalFiled record
- 22-32 Scollard Street and 21-25 Davenport Road - Zoning By-law Amendment Application - Decision Report - RefusalFiled record
- 69 Yorkville Avenue - Official Plan and Zoning By-law Amendment Application - Decision Report - RefusalFiled record
- 39-47 Camden Street - Zoning Amendment Application - Appeal ReportFiled record
- 45 The Esplanade - Official Plan and Zoning By-law Amendment Applications - Appeal ReportFiled record
- 1-11 Bloor Street West and 768-784 Yonge Street - Zoning By-Law Amendment Application - Appeal ReportFiled record