Port Lands Flood Protection and Enabling Infrastructure - Construction Staging Time Extension
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2023-06-14 · Toronto City Council · amended
As filed
City Council on June 14 and 15, 2023, adopted the following: 1. City Council authorize the continuation of the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway to October 31, 2023. 2. City Council continue the designation of the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only to October 31, 2023.
Show the rest of As filed, 1,699 more characters as filed
3. City Council continue the designation of the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, to October 31, 2023. 4. City Council authorize the continuation of the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street to October 31, 2023. 5. City Council authorize the continuation of the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway to October 31, 2023. 6. City Council authorize the continuation of an all way stop control at the intersection of Villiers Street and Saulter Street South to October 31, 2023. 7. City Council continue the designation of the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, to October 31, 2023. 8. City Council continue the designation of the westerly southbound lane on Don Roadway, from Villiers Street to a point 30.5 metres north, for southbound left turns only, to October 31, 2023. 9. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed. 10. City Council direct that prior to the extending the closure of Lake Shore Boulevard East that the Memorandum of Understanding be updated to include a maintenance regime that ensures safe cycling every day, including that the maintenance log be provided to the office of the General Manager, Transportation Services and the local Councillor on a daily basis and to include an end-of-day inspection and any necessary cleanup.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on Commissioners Street, City Council approval is required. The TTC service has been rerouted along Villiers Street and Saulter Street South. Waterfront Toronto, City of Toronto, Toronto and Region Conservation Authority (TRCA) and the Toronto Port Lands Company (TPLC) have developed the Port Lands Flood Protection Project (PLFPP) to protect the Lower Don Lands and adjacent areas from potential loss of life and costly flood damage associated with a flood event, while triggering economic development.
Show the rest of As the city filed it, 1,106 more characters as filed
The solution involves creating two additional outlets for the Don River, which ultimately will be surrounded by new parks, green space and public realm enhancements. Several roads within the Port Lands area will be impacted. City Council, at its meeting on May 11 and 12, 2022, authorized a time extension of the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway; and traffic and parking regulation amendments on Commissioners Street, Don Roadway, Villiers Street and Saulter Street South, from May 17, 2022 to May 31, 2023. Waterfront Toronto has requested an extension of the duration of the full closure on Commissioners Street, in order to complete the road reconstruction. Based on the information provided by Waterfront Toronto, the site has experienced issues with equipment failure, high levels of groundwater infiltration coupled with poor soil conditions. Transportation Services is requesting authorization to extend the duration of the full closure of Commissioners Street until October 31, 2023.
Staff recommended
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from June 1, 2023 to October 31, 2023. 2. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from June 1, 2023 to October 31, 2023.
Show the rest of Staff recommended, 1,634 more characters as filed
3. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from June 1, 2023 to October 31, 2023. 4. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from June 1, 2023 to October 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from June 1, 2023 to October 31, 2023. 6. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from June 1, 2023 to October 31, 2023. 7. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from June 1, 2023 to October 31, 2023. 8. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from to June 1, 2023 9. City Council designate the northerly eastbound lane on Villiers Street, from Don Roadway to a point 30.5 metres west, for eastbound left turns only, from June 1, 2023 to October 31, 2023. 10. City Council designate the westerly southbound lane on Don Roadway, from Villiers Street to a point 30.5 metres north, for southbound left turns only, from June 1, 2023 to October 31, 2023. 11. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed.
Considered
2023-05-24 · Toronto and East York Community Council · amended
Decision as filed
The Toronto and East York Community Council recommend that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from June 1, 2023 to October 31, 2023. 2. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from June 1, 2023 to October 31, 2023.
Show the rest of Decision as filed, 1,987 more characters as filed
3. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from June 1, 2023 to October 31, 2023. 4. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from June 1, 2023 to October 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from June 1, 2023 to October 31, 2023. 6. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from June 1, 2023 to October 31, 2023. 7. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from June 1, 2023 to October 31, 2023. 8. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from to June 1, 2023 9. City Council designate the northerly eastbound lane on Villiers Street, from Don Roadway to a point 30.5 metres west, for eastbound left turns only, from June 1, 2023 to October 31, 2023. 10. City Council designate the westerly southbound lane on Don Roadway, from Villiers Street to a point 30.5 metres north, for southbound left turns only, from June 1, 2023 to October 31, 2023. 11. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed. 12. City Council direct that prior to the extending the closure of Lakeshore East that the Memorandum of Understanding be updated to include and maintenance regime that ensures safe cycling every day, including that the maintenance log be provided to the office of the General Manager, Transportation Services and the local Councillor on a daily basis.
2023-06-14 · Toronto City Council · amended
On the record
More from this meeting
- Naming of an existing Public Lane South of Hallam Street extending between Delaware Avenue and Concord AvenueFiled record
- 35, 41, 95 High Park Avenue, 66, 102-116 Pacific Avenue - Zoning By-law Amendment Application - Removal of Holding Symbol ("H") - Decision Report - ApprovalFiled record
- 3239-3251 Dundas Street West - Zoning By-law Amendment and Rental Housing Demolition Application - Decision Report - ApprovalFiled record
- 31-37 Gladstone Avenue - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 124 Bedford Road - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 555 Davenport Road - Official Plan and Zoning By-law Amendment Application - Decision Report - ApprovalFiled record