Construction Staging Area Time Extension - TTC Easier Access Program - Greenwood Station (Stage 4)
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2023-10-11 · Toronto City Council · adopted
As filed
City Council on October 11 and 12, 2023, adopted the following: 1. City Council authorize the continuation of the closure of the west sidewalk and all of Linnsmore Crescent, between Strathmore Boulevard and a point 29.8 metres north, from September 20, 2023 to July 31, 2024. 2. City Council authorize the continuation of the closure of the north side pedestrian crossing space and north sidewalk on Strathmore Boulevard, between the east side of Linnsmore Crescent and a point 20 metres west, from September 20, 2023 to July 31, 2024.
Show the rest of As filed, 5,605 more characters as filed
3. City Council authorize the continuation of the closure of both sidewalks and all of Strathmore Boulevard, between Linnsmore Crescent and a point 27 metres west, from September 20, 2023 to July 31, 2024. 4. City Council authorize the continuation of the closure of the west sidewalk and the southbound lane on Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north, from September 20, 2023 to July 31, 2024. 5. City Council authorize the continuation to designate Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north as one-way northbound. 6. City Council authorize the continuation to rescind the existing parking prohibition in effect at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 7. City Council authorize the continuation to prohibit stopping at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 8. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City direct the applicant to continue clearly consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to continue providing a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 15. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct that Strathmore Boulevard, Wolverleigh Boulevard, and Linnsmore Crescent be returned to pre-construction traffic and parking regulations when the project is complete. 18. City Council continue to amend the existing parking prohibition in effect from the 16th day to the last day of each month, April 1 to November 30, inclusive, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 19. City Council continue to amend the existing parking prohibition in effect at anytime, December 1 of one year to March 31 of the next following year, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 20. City Council continue to amend the existing permit parking regulation in effect 12:01 a.m. to 10:00 a.m., except no parking from the 16th day to the last day of each month, April 1 to November 30, inclusive and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 21. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue. 22. City Council continue to amend the existing parking prohibition in effect from the first day to the 15th day of each month, from April 1 to November 30, inclusive, on the south side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 23. City Council continue to amend the existing permit parking regulation in effect from 12:01 a.m. to 10:00 a.m., except no parking from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 24. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on both Strathmore Boulevard and Linnsmore Crescent, City Council approval of this report is required. As part of the Easier Access Project, Greenwood Station is being equipped with an at grade elevator attached to the existing station building, which will provide accessibility from the eastbound platform to street level, and a below grade elevator that will provide accessibility from the westbound platform to the concourse level.
Show the rest of As the city filed it, 1,316 more characters as filed
Construction will be undertaken in several phases, with varying degrees of sidewalk and lane closures taking place at the intersection of Strathmore Boulevard and Linnsmore Crescent. At the time of this report, TTC was applying for a permit extension of the construction staging for the Greenwood Easier Access project. This report deals with the matters related to Stage 4, scheduled to take place from September 20, 2023 to July 31, 2024. The remaining construction Stages will be discussed in future staff reports. Stage 4 will require the closure of Strathmore Boulevard in its entirety, including the north and south sidewalks, between the west side of Linnsmore Crescent and a point 27 metres west. As a result of the closures, there will be a temporary loss of three permit parking spaces on Strathmore Boulevard during Stage 4. The loss of parking spaces will not negatively impact the Permit Parking Area 7B. The 31 Greenwood buses will divert to Coxwell Station via Danforth Avenue and Coxwell Avenue in all service periods. TTC has requested a time extension for the construction staging areas on Strathmore Boulevard and Linnsmore Crescent, as the construction has been delayed due to labour strikes in 2022, existing site conditions and existing underground interference, and special weather conditions.
Staff recommended
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the continuation of the closure of the west sidewalk and all of Linnsmore Crescent, between Strathmore Boulevard and a point 29.8 metres north, from September 20, 2023 to July 31, 2024. 2. City Council authorize the continuation of the closure of the north side pedestrian crossing space and north sidewalk on Strathmore Boulevard, between the east side of Linnsmore Crescent and a point 20 metres west, from September 20, 2023 to July 31, 2024.
Show the rest of Staff recommended, 5,605 more characters as filed
3. City Council authorize the continuation of the closure of both sidewalks and all of Strathmore Boulevard, between Linnsmore Crescent and a point 27 metres west, from September 20, 2023 to July 31, 2024. 4. City Council authorize the continuation of the closure of the west sidewalk and the southbound lane on Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north, from September 20, 2023 to July 31, 2024. 5. City Council authorize the continuation to designate Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north as one-way northbound. 6. City Council authorize the continuation to rescind the existing parking prohibition in effect at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 7. City Council authorize the continuation to prohibit stopping at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 8. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City direct the applicant to continue clearly consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to continue providing a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 15. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct that Strathmore Boulevard, Wolverleigh Boulevard, and Linnsmore Crescent be returned to pre-construction traffic and parking regulations when the project is complete. 18. City Council continue to amend the existing parking prohibition in effect from the 16th day to the last day of each month, April 1 to November 30, inclusive, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 19. City Council continue to amend the existing parking prohibition in effect at anytime, December 1 of one year to March 31 of the next following year, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 20. City Council continue to amend the existing permit parking regulation in effect 12:01 a.m. to 10:00 a.m., except no parking from the 16th day to the last day of each month, April 1 to November 30, inclusive and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 21. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue. 22. City Council continue to amend the existing parking prohibition in effect from the first day to the 15th day of each month, from April 1 to November 30, inclusive, on the south side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 23. City Council continue to amend the existing permit parking regulation in effect from 12:01 a.m. to 10:00 a.m., except no parking from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 24. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue.
Considered
2023-09-19 · Toronto and East York Community Council · amended
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council authorize the continuation of the closure of both sidewalks and all of Strathmore Boulevard, between Linnsmore Crescent and a point 27 metres west, from September 20, 2023 to July 31, 2024. 2. City Council authorize the continuation of the closure of the west sidewalk and the southbound lane on Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north, from September 20, 2023 to July 31, 2024.
Show the rest of Decision as filed, 5,178 more characters as filed
3. City Council authorize the continuation to designate Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north as one-way northbound. 4. City Council authorize the continuation to rescind the existing parking prohibition in effect at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 5. City Council authorize the continuation to prohibit stopping at all times, on the east side of Linnsmore Crescent, between Strathmore Boulevard and a point 24 metres north. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. City direct the applicant to continue clearly consulting and communicating all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to continue providing a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. City Council direct that Strathmore Boulevard, Wolverleigh Boulevard and Linnsmore Crescent be returned to pre-construction traffic and parking regulations when the project is complete. 16. City Council continue to amend the existing parking prohibition in effect from the 16th day to the last day of each month, April 1 to November 30, inclusive, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 17. City Council continue to amend the existing parking prohibition in effect at anytime, December 1 of one year to March 31 of the next following year, on the north side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 18. City Council continue to amend the existing permit parking regulation in effect 12:01 a.m. to 10:00 a.m., except no parking from the 16th day to the last day of each month, April 1 to November 30, inclusive and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 19. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the even (north) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue. 20. City Council continue to amend the existing parking prohibition in effect from the first day to the 15th day of each month, from April 1 to November 30, inclusive, on the south side of Wolverleigh Boulevard, between Linnsmore Crescent and Woodington Avenue, to be in effect from Monarch Park Avenue to Woodington Avenue. 21. City Council continue to amend the existing permit parking regulation in effect from 12:01 a.m. to 10:00 a.m., except no parking from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Coxwell Avenue, to be in effect from Monarch Park Avenue to Coxwell Avenue. 22. City Council continue to enact permit parking in effect 12:01 a.m. to 10:00 a.m., on the odd (south) side of Wolverleigh Boulevard, between Linnsmore Crescent and Monarch Park Avenue.
2023-10-11 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of an existing Public Lane South of Queen Street East extending east of St Paul StreetFiled record
- Naming of an existing Public Lane North of Oakcrest Avenue extending East from Morton RoadFiled record
- 2-24 Temple Avenue - Rental Housing Demolition Application - Decision Report - ApprovalFiled record
- City-initiated Official Plan Amendments - Villiers Island, McCleary District, South River and Polson Quay Precincts Parks and Open Space - Decision Report - ApprovalFiled record
- 77 Roehampton Avenue - Zoning By-law Amendment and Rental Housing Demolition Applications - Decision Report - ApprovalFiled record
- 429 Walmer Road - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record