The decision
2023-12-13 · Toronto City Council · adopted
As filed
City Council on December 13, 14 and 15, 2023, adopted the following: 1. City Council authorize the closure of the north sidewalk and the north side westbound curb lane on Dundas Street West, between a point 128 metres east of Jane Street and a point 45.75 metres further east, and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from December 31, 2023 to October 1, 2024.
Show the rest of As filed, 3,942 more characters as filed
2. City Council rescind the existing maximum two-hour parking regulation in effect 9:00 a.m. to 4:00 p.m., Monday to Friday; 8:00 a.m. to 6:00 p.m., Saturday on north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 3. City Council rescind the existing parking prohibition in effect 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 4. City Council rescind the existing stopping prohibition in effect 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 5. City Council prohibit stopping at all times on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 6. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. City Council direct that Dundas Street West be returned to its pre-construction traffic and parking regulations when the project is complete.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West City Council approval of this report is required. Maple Reinders Constructors Ltd is constructing a 6-storey self storage building at 3524 Dundas Street West. The site is located on the north side of Dundas Street West between Priscilla Avenue and Willard Avenue. Transportation Services is requesting approval to close the north sidewalk and the north side westbound curb lane on Dundas Street West for a period of 9 months, from December 31, 2023 to October 1, 2024 to facilitate construction staging operations.
Show the rest of As the city filed it, 283 more characters as filed
Pedestrian movements on the north side of Dundas Street West abutting the site will be maintained in a minimum 2.1 metre-wide covered and protected walkway. The construction staging area will result in the loss of six on-street parking spaces on the north side of Dundas Street West.
Staff recommended
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the north sidewalk and the north side westbound curb lane on Dundas Street West, between a point 128 metres east of Jane Street and a point 45.75 metres further east, and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from December 31, 2023 to October 1, 2024.
Show the rest of Staff recommended, 3,880 more characters as filed
2. City Council rescind the existing maximum two-hour parking regulation in effect 9:00 a.m. to 4:00 p.m., Monday to Friday; 8:00 a.m. to 6:00 p.m., Saturday on north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 3. City Council rescind the existing parking prohibition in effect 7:00 a.m. to 9:00 a.m., Monday to Friday., except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 4. City Council rescind the existing stopping prohibition in effect 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 5. City Council prohibit stopping at all times on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 6. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. City Council direct that Dundas Street West be returned to its pre-construction traffic and parking regulations when the project is complete.
Considered
2023-11-15 · Toronto and East York Community Council · adopted
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council authorize the closure of the north sidewalk and the north side westbound curb lane on Dundas Street West, between a point 128 metres east of Jane Street and a point 45.75 metres further east, and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from December 31, 2023 to October 1, 2024. 2. City Council rescind the existing maximum two-hour parking regulation in effect 9:00 a.m.
Show the rest of Decision as filed, 3,851 more characters as filed
to 4:00 p.m., Monday to Friday; 8:00 a.m. to 6:00 p.m., Saturday on north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 3. City Council rescind the existing parking prohibition in effect 7:00 a.m. to 9:00 a.m., Monday to Friday., except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 4. City Council rescind the existing stopping prohibition in effect 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 5. City Council prohibit stopping at all times on the north side of Dundas Street West, between a point 103 metres east of Jane Street and a point 69 metres further east. 6. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. City Council direct that Dundas Street West be returned to its pre-construction traffic and parking regulations when the project is complete.
2023-12-13 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of Public Lane located north of Bloor Street West, extending between Margueretta Street and Brock AvenueFiled record
- Naming of a Public Lane East of Saint Paul Street, Extending southerly of North Star WayFiled record
- Naming of a Public Lane North of Danforth Avenue, extending between Donlands Avenue and Caithness AvenueFiled record
- 2760 Dundas Street West - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 403 Keele Street and 48-50 Heintzman Street - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 209 Mavety Street - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record