Energy Retrofit Project Change of Scope

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2023-09-22 · Toronto Zoo · adopted

As filed

The Board of Management of the Toronto Zoo received the report (August 16, 2023) from the Chief Executive Officer, Toronto Zoo, for information.

On the agenda

As the city filed it

This report is to provide an update on the Change of Scope for the Peak Shaving Component of the Energy Retrofit Project. Further work on this project has shown that the existing Generac generators used for site-wide emergency back up are in need of replacement, and therefore not the best equipment to be used for the Peak Shaving Conservation Measure of the original Energy Retrofit Project. At this time, the Zoo will be replacing the Peak Shaving Conservation Measure as approved by the Board with a heating and cooling system replacement conservation measure in Africa Pavilion and Indo Malaya Pavilion which will include heat pumps and new boilers similar to the Americas Pavilion Energy Retrofit Project.

Show the rest of As the city filed it, 158 more characters as filed

This alternative measure will realize an additional 409 tonnes of annual greenhouse gas emission savings of the original scope of the Energy Retrofit Project.

Staff recommended

The Director, Facilities and Infrastructure, Toronto Zoo recommends that: 1. The Board of Management of the Toronto Zoo receives this report for information.