The filed record
Parkside Drive Study Final Report
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2024-11-13 · Toronto City Council · adopted
As filed
City Council on November 13 and 14, 2024, adopted the following: 1. City Council endorse, in principle, the road safety project on Parkside Drive, as described on pages 5 through 16 in the revised report (October 17, 2024) from the General Manager, Transportation Services, including a bikeway, intersection safety improvements at Lake Shore Boulevard West and Bloor Street West, new and updated Toronto Transit Commission bus stops, and designated turning lanes at intersections.
The vote
Adopt Item · Carried, 19-7
The whole record, all 26 members
- Alejandra BravoFor
- Amber MorleyFor
- Anthony PerruzzaAgainst
- Ausma MalikFor
- Brad BradfordAgainst
- Chris MoiseFor
- Dianne SaxeFor
- Frances NunziataFor
- Gord PerksFor
- Jamaal MyersFor
- James PasternakAgainst
- Jennifer McKelvieFor
- Jon BurnsideAgainst
- Josh MatlowFor
- Lily ChengAgainst
- Michael ThompsonFor
- Mike ColleFor
- Nick MantasFor
- Olivia ChowFor
- Parthi KandavelFor
- Paul AinslieFor
- Paula FletcherFor
- Rachel Chernos LinFor
- Shelley CarrollFor
- Stephen HolydayAgainst
- Vincent CrisantiAgainst
Every name opens that member’s record.
On the agenda
As the city filed it
Parkside Drive is a major arterial road that serves as the eastern boundary of High Park and provides multi-modal connections to key destinations in the city with residential frontage on the east side. As directed by Council in November 2021, the Parkside Drive Study was initiated to explore possible design changes that could improve safety and mobility along the corridor with a focus on people walking, cycling and other vulnerable road users, as a companion to the High Park Movement Strategy.
Show the rest of As the city filed it, 1,422 more characters as filed
Over the last three years several improvements have been made to the roadway to manage vehicle speeds and improve road user safety. The Parkside Drive Study builds on community advocacy for improved road safety. In the last ten years there were seven collisions that resulted in five serious injuries and three fatalities. All seven collisions involved vulnerable road users. Narrow and missing sidewalks, lack of bikeways, excessive vehicular speeds and aggressive driving, and a history of collisions resulting in fatality or serious injury are frequently heard concerns. The Parkside Drive Study recommendations support the City's Vision Zero Road Safety Plan efforts to implement changes that would prevent serious injuries and fatalities on our streets. This report summarizes the findings from the Parkside Drive Study and seeks City Council endorsement in principle of the study recommendations to implement a road safety focused redesign project. Preliminary design and consultation for the road safety project on Parkside Drive have been completed, and installation is targeted for the near-term (2025 - 2027). The Parkside Drive road safety changes would add 3.8 lane kilometres (1.9 centreline kilometres) of new bikeways, reconstruct the Lake Shore Boulevard West intersection and improve vulnerable road user connections to the Martin Goodman Trail and include design changes to decrease motor vehicle speeds.
Staff recommended
The General Manager, Transportation Services recommends that: 1. City Council endorse, in principle, the road safety project on Parkside Drive, as described on pages 5 through 16 in the report (October 8, 2024) from the General Manager, Transportation Services, including a bikeway, intersection safety improvements at Lake Shore Boulevard West and Bloor Street West, new and updated Toronto Transit Commission bus stops, and designated turning lanes at intersections.
Considered
2024-10-22 · Infrastructure and Environment Committee · adopted
Decision as filed
The Infrastructure and Environment Committee recommends that: 1. City Council endorse, in principle, the road safety project on Parkside Drive, as described on pages 5 through 16 in the revised report (October 17, 2024) from the General Manager, Transportation Services, including a bikeway, intersection safety improvements at Lake Shore Boulevard West and Bloor Street West, new and updated Toronto Transit Commission bus stops, and designated turning lanes at intersections.
2024-11-13 · Toronto City Council · adopted
On the record
More from this meeting
- OMERS Update on the Climate Action Plan to the City of TorontoFiled record
- Meter Transmission Units Emergency and Emergency Non-Competitive Contract with Aclara Technologies LLC to Obtain Supply of Replacement Water Meter Transmission UnitsFiled record
- Temporary Street Closure for Eastbound F.G. Gardiner Expressway and Northbound Don Valley Parkway - 2025 Toronto Triathlon FestivalFiled record
- Enhanced Nighttime Security at Green P Parking FacilitiesFiled record
- Community Sport and Recreation Investment Fund Application: Stream 1 - Repair and Rehabilitation for the Jack Goodlad Park Basketball Court Rehabilitation ProjectFiled record