The filed record
914 Bathurst Street - Official Plan and Zoning By-law Amendment Application - Decision Report - Approval
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2024-02-06 · Toronto City Council · adopted
As filed
City Council on February 6 and 7, 2024, adopted the following: 1. City Council amend the Official Plan for the lands at 914 Bathurst Street substantially in accordance with the draft Official Plan Amendment attached as Attachment 5 to the report (January 8, 2024) from the Director, Community Planning, Toronto and East York District. 2. City Council amend City of Toronto Zoning By-law 569-2013 for the lands at 914 Bathurst Street in accordance with the draft Zoning By-law Amendment attached as Attachment 6 to the report (January 8, 2024) from the Director, Community Planning, Toronto and East York District.
Show the rest of As filed, 4,297 more characters as filed
3. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and draft Zoning By-law as may be required. 4. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to enter into a Municipal Infrastructure Agreement to financially secure the construction of any improvements to the municipal infrastructure in connection with the accepted Functional Servicing Report by the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements to such infrastructure are required. 5. City Council request the Chief Planner and Executive Director, City Planning to secure the following through the site plan approval process: a. an outdoor, publicly accessible source of drinking water; b. low-carbon energy strategy as part of the site plan agreement that includes at least the following sustainability measures: i. a highly energy-efficient building envelope; ii. low carbon building heating and cooling, including heat pumps and Energy Recovery Units that provide sensible and latent heat recovery from ventilation in each suite; iii. ample bicycle parking and electrical outlets for bicycle charging in the interior bicycle parking area; iv. installation of 10 additional Electric Vehicle charging spaces; v. fixtures and appliances that are highly efficient in their use of water and energy; vi. electric-only appliances or fireplaces in the residential units; vii. motion sensor-controlled LED lighting in common areas; and viii. accommodation for future solar photovoltaic system; c. improved Stormwater Management Measures; d. installation of outdoor (dark sky) downward lighting; e. provision of indoor space to segregate household hazardous waste and organic waste; f. rainwater capture, used for site irrigation; g. diversion of at least 60 percent of total construction waste from landfill; h. installation of first 16.0 metre height of exterior glazing as bird friendly; i. replacement of all trees on Bathurst Street to the maximum compatible with Toronto Transit Commission operations; and j. to make every effort to achieve the requirements of Toronto Green Standards Version 4 Tier 2 or higher. 6. City Council request the General Manager, Transportation Services to review and report back on the feasibility of amending Schedule B of the City of Toronto Municipal Code Chapter 925, Permit Parking, to exclude the development located at 914 Bathurst Street from Permit Parking. 7. City Council direct the Chief Planner and Executive Director, City Planning, in consultation with the local Ward Councillor and the City Solicitor, to continue to work with the applicant to explore an in-kind community benefit package pursuant to 37(6) of the Planning Act and to report back to City Council for further instruction on any offer of in-kind community benefits made by the applicant. 8. City Council request that the owner make reasonable commercial efforts to convey off-site parkland to the City equal to the value of the on-site parkland dedication, in fulfilment of the parkland dedication requirements pursuant to Section 42 of the Planning Act, with the off-site parkland dedication to be acceptable to the General Manager, Parks, Forestry and Recreation and free and clear of any above or below grade encumbrances, with the exception of any encumbrances as may be otherwise approved by the General Manager, Parks, Forestry and Recreation, to be conveyed prior to the issuance of the first above grade building permit; and a. in the event that the off-site parkland dedication is less than the value of the on-site parkland dedication, then the owner will pay cash-in-lieu of parkland to make up for the shortfall in parkland dedication, prior to the issuance of the first above grade building permit; b. in the event that the owner is unable to provide an acceptable off-site parkland dedication to the City, the owner will be required to satisfy the parkland dedication requirement through the payment of cash-in-lieu; and c. the value of the cash-in-lieu of parkland dedication will be appraised through Real Estate Services and payment will be required prior to the issuance of the first above grade building permit.
On the agenda
As the city filed it
This report reviews and recommends approval of the application to amend the Official Plan and Zoning By-law to permit a 12-storey mixed-use building with 155 dwelling units and a minimum of 30 square metres of commercial space on the ground floor.
Staff recommended
The City Planning Division recommends that: 1. City Council amend the Official Plan, for the lands at 914 Bathurst Street substantially in accordance with the draft Official Plan Amendment attached as Attachment No. 5 to this report. 2. City Council amend City of Toronto Zoning By-law 569-2013 for the lands at 914 Bathurst Street in accordance with the draft Zoning By-law Amendment attached as Attachment No. 6 to this report.
Show the rest of Staff recommended, 642 more characters as filed
3. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and draft Zoning By-law as may be required. 4. Before introducing the necessary Bills to City Council for enactment, City Council requires the owner to enter into a Municipal Infrastructure Agreement to financially secure the construction of any improvements to the municipal infrastructure in connection with the accepted Functional Servicing Report by the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements to such infrastructure are required.
Considered
2024-01-24 · Toronto and East York Community Council · amended
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council amend the Official Plan, for the lands at 914 Bathurst Street substantially in accordance with the draft Official Plan Amendment attached as Attachment 5 to the report (January 8, 2024) from the Director, Community Planning, Toronto and East York District. 2. City Council amend City of Toronto Zoning By-law 569-2013 for the lands at 914 Bathurst Street in accordance with the draft Zoning By-law Amendment attached as Attachment 6 to the report (January 8, 2024) from the Director, Community Planning, Toronto and East York District.
Show the rest of Decision as filed, 4,297 more characters as filed
3. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and draft Zoning By-law as may be required. 4. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to enter into a Municipal Infrastructure Agreement to financially secure the construction of any improvements to the municipal infrastructure in connection with the accepted Functional Servicing Report by the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements to such infrastructure are required. 5. City Council request the Chief Planner and Executive Director, City Planning to secure the following through the site plan approval process: a. an outdoor, publicly accessible source of drinking water; b. low-carbon energy strategy as part of the site plan agreement that includes at least the following sustainability measures: i. a highly energy-efficient building envelope; ii. low carbon building heating and cooling, including heat pumps and Energy Recovery Units that provide sensible and latent heat recovery from ventilation in each suite; iii. ample bicycle parking and electrical outlets for bicycle charging in the interior bicycle parking area; iv. installation of 10 additional Electric Vehicle charging spaces; v. fixtures and appliances that are highly efficient in their use of water and energy; vi. electric-only appliances or fireplaces in the residential units; vii. motion sensor-controlled LED lighting in common areas; and viii. accommodation for future solar photovoltaic system; c. improved Stormwater Management Measures; d. installation of outdoor (dark sky) downward lighting; e. provision of indoor space to segregate household hazardous waste and organic waste; f. rainwater capture, used for site irrigation; g. diversion of at least 60 percent of total construction waste from landfill; h. installation of first 16.0 metre height of exterior glazing as bird friendly; i. replacement of all trees on Bathurst Street to the maximum compatible with Toronto Transit Commission operations; and j. to make every effort to achieve the requirements of Toronto Green Standards Version 4 Tier 2 or higher. 6. City Council request the General Manager, Transportation Services to review and report back on the feasibility of amending Schedule B of the City of Toronto Municipal Code Chapter 925, Permit Parking, to exclude the development located at 914 Bathurst Street from Permit Parking. 7. City Council direct the Chief Planner and Executive Director, City Planning, in consultation with the local Ward Councillor and the City Solicitor, to continue to work with the applicant to explore an in-kind community benefit package pursuant to 37(6) of the Planning Act and to report back to City Council for further instruction on any offer of in-kind community benefits made by the applicant. 8. City Council request that the owner make reasonable commercial efforts to convey off-site parkland to the City equal to the value of the on-site parkland dedication, in fulfilment of the parkland dedication requirements pursuant to Section 42 of the Planning Act, with the off-site parkland dedication to be acceptable to the General Manager, Parks, Forestry and Recreation and free and clear of any above or below grade encumbrances, with the exception of any encumbrances as may be otherwise approved by the General Manager, Parks, Forestry and Recreation, to be conveyed prior to the issuance of the first above grade building permit; and a. in the event that the off-site parkland dedication is less than the value of the on-site parkland dedication, then the owner will pay cash-in-lieu of parkland to make up for the shortfall in parkland dedication, prior to the issuance of the first above grade building permit; b. in the event that the owner is unable to provide an acceptable off-site parkland dedication to the City, the owner will be required to satisfy the parkland dedication requirement through the payment of cash-in-lieu; and c. the value of the cash-in-lieu of parkland dedication will be appraised through Real Estate Services and payment will be required prior to the issuance of the first above grade building permit.
Clerk’s note
The Toronto and East York Community Council held a statutory public meeting on January 24, 2024 and notice was given in accordance with the Planning Act.
2024-02-06 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of an existing Public Lane North of St. Clair Avenue West, extending between Raglan Avenue and Vaughan RoadFiled record
- 7 Laxton Avenue - Official Plan and Zoning By-law Amendment Applications - Decision Report - ApprovalFiled record
- 440, 444, 450 and 462 Front Street West; 425, 439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - The Well - Extension of Part Lot Control Exemption Application - ApprovalFiled record
- 33 Davisville Avenue and 60 Balliol Street - Official Plan and Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 111 and 141 Davisville Avenue - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 147-153 Vaughan Road - Rental Housing Demolition Application - Decision Report - ApprovalFiled record