The Public GalleryToronto

Etobicoke York Community Council · 2025-04-02 · 2025.EY21.9

The filed record

Nordin Avenue (1156 The Queensway) - Construction Staging Area

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2025-04-02 · Etobicoke York Community Council · adopted

As filed

The Etobicoke York Community Council: 1. Authorized the closure of the east sidewalk and a 2.2 metre wide portion of the northbound curb lane on Nordin Avenue, between The Queensway and a point 47 metres further north, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from April 30, 2025 to June 30, 2027, inclusive. 2. Prohibited stopping at all times on the east side of Nordin Avenue, between The Queensway and a point 47 metres north.

Show the rest of As filed, 3,107 more characters as filed

3. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 5. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 14. Directed that Nordin Avenue, The Queensway and Woolgar Avenue be returned to its pre-construction traffic and parking regulations when the project is complete. 15. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. ELM Developments is constructing an 11-storey residential building at 1156 The Queensway. The site is located on the north side The Queensway, between Nordin Avenue and Woolgar Avenue. Transportation Services is requesting authorization to close the east sidewalk and a 2.2 metre wide portion of the northbound curb lane on the east side of Nordin Avenue for a period of 26 months, from April 30, 2025 to June 30, 2027, in order to facilitate construction staging operations.

Show the rest of As the city filed it, 298 more characters as filed

Pedestrians will be redirected into a 2.1 metre wide covered and protected walkway within the closed portion of the northbound curb lane on Nordin Avenue. The proposed stopping prohibition on the east side of Nordin Avenue will result in the loss of total four (maximum three-hours) parking spaces.

Staff recommended

The Director, Traffic Management, Transportation Services, recommends that: 1. Etobicoke York Community Council authorize the closure of the east sidewalk and a 2.2 metre wide portion of the northbound curb lane on Nordin Avenue, between The Queensway and a point 47 metres further north, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from April 30, 2025 to June 30, 2027, inclusive.

Show the rest of Staff recommended, 3,663 more characters as filed

2. Etobicoke York Community Council prohibit stopping at all times on the east side of Nordin Avenue, between The Queensway and a point 47 metres north. 3. Etobicoke York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. Etobicoke York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 5. Etobicoke York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Etobicoke York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Etobicoke York Community Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Etobicoke York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Etobicoke York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Etobicoke York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. Etobicoke York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Etobicoke York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Etobicoke York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 14. Etobicoke York Community Council direct that Nordin Avenue, The Queensway and Woolgar Avenue be returned to its pre-construction traffic and parking regulations when the project is complete. 15. Etobicoke York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community.

    On the record

    The item as the City filed it

    More from this meeting

    The whole meeting