Watermain Replacement and Sidewalk Construction on York Downs Drive from Bathurst Street to Sandringham Drive - Amendment to the Plans for Construction Project 25ECS-LU-02SU

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2025-05-21 · Toronto City Council · adopted

As filed

City Council on May 21 and 22, 2025, adopted the following: 1. City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction project on York Downs Drive from the 25ECS-LU-02SU contract for local road resurfacing and watermain replacement on York Downs Drive.

On the agenda

As the city filed it

This motion seeks to amend the plans for construction project 25ECS-LU-02SU - Watermain Replacement and Sidewalk Construction on York Downs Drive from Bathurst Street to Sandringham Drive. In late June 2025, the City is planning to undertake sidewalk construction and watermain replacements on York Downs Drive from Raeburn Avenue to Armour Boulevard. Notices of this project were distributed to those who are impacted. The sidewalk portion of this project is divided into two components with planned installations on the north side of York Downs Drive between Armour Boulevard and Elderberry Court, and another sidewalk being installed along the south side of the street between Elderberry Court and the cul-de-sac.

Show the rest of As the city filed it, 429 more characters as filed

After some objections, we distributed surveys to gauge feedback from residents, and most expressed that they are against the plans for the sidewalk installation component.19 out of 20 residents stated their strong opposition towards having sidewalks installed on these streets. Therefore, we request that this project be revised to discard the proposed sidewalk component but continue with the remainder of the construction plan.

Staff recommended

The Infrastructure and Environment Committee recommends that: 1. City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction project on York Downs Drive from the 25ECS-LU-02SU contract for local road resurfacing and watermain replacement on York Downs Drive.

Considered

  • 2025-05-07 · Infrastructure and Environment Committee · adopted

    Decision as filed

    The Infrastructure and Environment Committee recommends that: 1. City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction project on York Downs Drive from the 25ECS-LU-02SU contract for local road resurfacing and watermain replacement on York Downs Drive.

  • 2025-05-21 · Toronto City Council · adopted