Hesketh Court - Proposed New Sidewalk Construction
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2025-07-23 · Toronto City Council · adopted
As filed
City Council on July 23 and 24, 2025, adopted the following: 1. City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction project on Hesketh Court from the 26ECS-RD-02RR contract for local road resurfacing.
On the agenda
As the city filed it
This motion aims to amend the plans for project 26ECS-RD-02RR which outlines a local road resurfacing along with the construction of sidewalks on Hesketh Court and Tinder Crescent. Tinder Crescent and Hesketh Court are local roads within the Victoria Village neighborhood of Ward 16. These roads serve residents who live there as they do not provide through access; therefore traffic is highly local. Transportation plans to reconstruct Hesketh and Tinder with a sidewalk in 2026-2027.
Show the rest of As the city filed it, 636 more characters as filed
Residents were not formally notified of the project but were informed by a staff member taking measurements of the road. Numerous residents objected to the sidewalk construction project which prompted my office to conduct a survey to receive feedback from the community on both roads. For Hesketh Court, 85 percent of residents were against the sidewalk project (29/34). On Tinder Crescent, 76 percent of residents were against (10/13). The request from the community is clear, on behalf of these residents I request the project be amended to not include the proposed sidewalk component but continue with road resurfacing on both roads.
Staff recommended
Councillor Jon Burnside recommends that: 1. The Infrastructure and Environment Committee recommend that City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction projects on Hesketh Court and Tinder Crescent from the 26ECS-RD-02RR contract for local road resurfacing.
Considered
2025-07-10 · Infrastructure and Environment Committee · amended
Decision as filed
The Infrastructure and Environment Committee recommends that: 1. City Council direct the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Transportation Services, to remove the proposed new sidewalk construction project on Hesketh Court from the 26ECS-RD-02RR contract for local road resurfacing.
2025-07-23 · Toronto City Council · adopted
On the record
More from this meeting
- Review, Analysis and Service Delivery Model Recommendations for City-Wide Mechanical Litter Removal OperationsFiled record
- Joint Collection Schedule Discussions with Circular MaterialsFiled record
- Collection Options for District 2 and District Comparative AnalysisFiled record
- Establishing a Chief Congestion Officer for the City of TorontoFiled record
- Toronto Transit Commission Traction Power Upgrade Projects - Lane Closure InformationFiled record
- Cycling Network Plan - 2025 Cycling Infrastructure and Missing Sidewalk Installation - Second Quarter UpdateFiled record