1212-1220 Yonge Street - Zoning By-law Amendment Application - Decision Report - Approval

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2025-02-20 · Toronto and East York Community Council · deferred

As filed

The Toronto and East York Community Council adjourned the public meeting for 1212-1220 Yonge Street - Zoning By-law Amendment Application - Decision Report - Approval, until April 3, 2025 at 10:00 a.m.

On the agenda

As the city filed it

This report recommends approval of the application to amend the Zoning By-law to permit a 126.85-metre (35-storeys, excluding mechanical penthouse) mixed-use building. The proposed building contains 273 residential units, with a total gross floor area of 20,873 square metres, including 320 square metres of gross floor area for non-residential uses.

Staff recommended

The Director, Community Planning Toronto and East York District recommends that: 1. City Council amend City of Toronto Zoning By-law 569-2013 for the lands municipally known as 1212-1220 Yonge Street substantially in accordance with the draft Zoning By-law Amendment included as Attachment 6 to this Report. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

Show the rest of Staff recommended, 2,121 more characters as filed

3. Before introducing the necessary Bills for enactment, City Council require: a. the owner submit revised Functional Servicing and Stormwater Management Reports ("Engineering Reports") to demonstrate that the existing sanitary sewer system and watermain, and any required improvements to them, have adequate capacity and supply to accommodate the development of the lands to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; b. if the accepted and satisfactory Engineering Reports, from Recommendation 3.a. above, require any new municipal infrastructure or upgrades to existing municipal infrastructure to support the development, then either: i. the owner has secured the design, construction and provision of financial securities for any new municipal infrastructure, or any upgrades or required improvements to the existing municipal infrastructure identified in the accepted Engineering Reports, to support the development, in a financial secured agreement, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; or ii. the required new municipal infrastructure or upgrades to existing municipal infrastructure to support the development in the accepted Engineering Reports, in Recommendation 3.a. above, are constructed and operational, all to the satisfaction to the Chief Engineer and Executive Director, Engineering and Construction Services; c. all necessary approvals or permits arising from Recommendation 3.b.i. or 3.b.ii. above are obtained, where required all to the satisfaction to the Chief Engineer and Executive Director, Engineering and Construction Services; and d. the owner submit revised letters from the owner, structural engineer and mechanical engineer to support a watertight foundation as per Schedules D, E and F in the Servicing Report Groundwater Summary Form and a letter from the architect to support the type of construction for the required fire flow rate calculations, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services.

    On the record