The filed record
Rogers 5G Implementation Update
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2025-06-23 · Toronto Transit Commission Board · adopted
As filed
The TTC Board: 1. Received this report as a general update on the Rogers 5G wireless implementation project.
On the agenda
As the city filed it
This report aims to provide an update on the progress and implementation timeline for the Rogers 5G wireless implementation project within the TTC subway tunnels. This project, spearheaded by Rogers in collaboration with the TTC, involves designing and installing more than 500 kilometres of fiber, coaxial, and power cables, along with installing approximately 350 wayside signal amplifier locations within the tunnels. In addition to these critical tunnel infrastructure upgrades, station-level equipment at 45 stations must also be enhanced to ensure seamless cellular connectivity throughout the subway system.
Show the rest of As the city filed it, 726 more characters as filed
As of now, 38% of tunnel sections are equipped with 5G wireless cellular service, including key segments, such as Vaughan Metropolitan Centre to Sheppard West and St George to Bloor-Yonge on Line 1 as well as St George to Bloor-Yonge on Line 2. The remaining tunnel sections, covering portions of Lines 1, 2, and 4, are on track for completion by the end of 2026. Work is underway on Lines 1 and 2, with significant progress being made to ensure that the entire subway system will benefit from the advanced 5G connectivity by the projects conclusion. To ensures seamless connectivity for everyone within the subway system, the neutral host solution being implemented allows access to all mobile users, no matter their carrier.
Staff recommended
It is recommended that the TTC Board: 1. Receive this report as a general update on the Rogers 5G wireless implementation project.
On the record
More from this meeting
- Chief Executive Officer’s Report - June 2025Filed record
- Approved Minutes of the Advisory Committee on Accessible Transit (ACAT) General Monthly Meeting of April 23, 2025Filed record
- Platform Edge Doors Study - Outcome of Feasibility and Business Case StudiesFiled record
- Non-Fare Revenue Strategic ReviewFiled record
- Revised Station Naming PolicyFiled record
- Financial and Major Projects Update for the Period Ended April 26, 2025Filed record