The decision
2026-01-13 · Toronto and East York Community Council · adopted
As filed
The Toronto and East York Community Council: 1. Authorized the closure of the south sidewalk on Edward Street, between Chestnut Street and Bay Street, from January 31, 2026 to April 30, 2029, inclusive. 2. Authorized the closure of the east sidewalk on Chestnut Street, between Edward Street and a point 50 metres south, from January 31, 2026 to April 30, 2029, inclusive. 3. Authorized the closure of the east sidewalk on Elizabeth Street, between Edward Street and a point 35 metres south, from January 31, 2026 to April 30, 2029, inclusive.
Show the rest of As filed, 4,699 more characters as filed
4. Rescinded the existing taxi stand designation for 6 taxicabs in effect at all times on the south side of Edward Street, between Elizabeth Street and Chestnut Street. 5. Rescinded the existing parking prohibition in effect at all times on the south side of Edward Street, between Bay Street and Chestnut Street. 6. Rescinded the existing standing prohibition in effect at all times on the south side of Edward Street, between a point 14 metres west of Bay Street and a point 42 metres further west. 7. Prohibited stopping at al times on the south side of Edward Street, between Bay Street and Chestnut Street. 8. Rescinded the existing standing prohibition in effect at all times on the east side of Chestnut Street, between Dundas Street West and Edward Street. 9. Prohibited stopping at all times on the east side of Chestnut Street, between Dundas Street West and Edward Street. 10. Rescinded the existing standing prohibition in effect at all times on the east side of Elizabeth Street, between Dundas Street West and Edward Street. 11. Prohibited stopping at all times on the east side of Elizabeth Street, between Dundas Street West and Edward Street. 12. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 13. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 14. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 15. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 16. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 17. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 19. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 20. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 22. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work; more specifically, Transportation Services local road resurfacing and local geometric safety improvements works planned on Elizabeth Street in 2026, and Toronto Water watermain replacement work planned on Edward Street in 2027. 23. Directed that Edward Street, Elizabeth Street and Chestnut Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is complete. 24. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
On the agenda
As the city filed it
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. EllisDon is constructing two affordable housing projects: a 44-storey residential tower at 130 Elizabeth Street, and a 16-storey residential tower at 610 Bay Street. The two development sites are located on the south side of Edward Street, between Chestnut Street and Bay Street. To facilitate
Show the rest of As the city filed it, 773 more characters as filed
construction staging operations for the development, Transportation Services is requesting Council authorization to temporarily close the sidewalk at the following locations: - South side of Edward Street, between Chestnut Street and Bay Street; - East side of Chestnut Street, between Edward Street and a point 50 metres south, and; - East side of Elizabeth Street, between Edward Street and a point 35 metres south. For the duration of the sidewalk closures, pedestrian access along the construction frontage will be restricted. Pedestrians will be redirected to utilize the sidewalk on the opposite side of the roadway at the nearest traffic control signals. The proposed sidewalk closures are required for a period of 39 months, from January 31, 2026 to April 30, 2029.
Staff recommended
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south sidewalk on Edward Street, between Chestnut Street and Bay Street, from January 31, 2026 to April 30, 2029, inclusive. 2. Toronto and East York Community Council authorize the closure of the east sidewalk on Chestnut Street, between Edward Street and a point 50 metres south, from January 31, 2026 to April 30, 2029, inclusive.
Show the rest of Staff recommended, 5,648 more characters as filed
3. Toronto and East York Community Council authorize the closure of the east sidewalk on Elizabeth Street, between Edward Street and a point 35 metres south, from January 31, 2026 to April 30, 2029, inclusive. 4. Toronto and East York Community Council rescind the existing taxi stand designation for 6 taxicabs in effect at all times on the south side of Edward Street, between Elizabeth Street and Chestnut Street. 5. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the south side of Edward Street, between Bay Street and Chestnut Street. 6. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the south side of Edward Street, between a point 14 metres west of Bay Street and a point 42 metres further west. 7. Toronto and East York Community Council prohibit stopping at al times on the south side of Edward Street, between Bay Street and Chestnut Street 8. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the east side of Chestnut Street, between Dundas Street West and Edward Street. 9. Toronto and East York Community Council prohibit stopping at all times on the east side of Chestnut Street, between Dundas Street West and Edward Street. 10. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the east side of Elizabeth Street, between Dundas Street West and Edward Street. 11. Toronto and East York Community Council prohibit stopping at all times on the east side of Elizabeth Street, between Dundas Street West and Edward Street. 12. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 13. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 14. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 15. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 16. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 17. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 19. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 20. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 22. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. More specifically, Transportation Services local road resurfacing and local geometric safety improvements works planned on Elizabeth Street in 2026, and ii) Toronto Water watermain replacement work planned on Edward Street in 2027. 23. Toronto and East York Community Council direct that Edward Street, Elizabeth Street, and Chestnut Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is complete. 24. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
On the record
More from this meeting
- 409 Huron Street - Official Plan and Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 409 Huron Street- Rental Housing Demolition Application - Decision Report - ApprovalFiled record
- 409 Huron Street - Alterations and Demolition of Heritage Attributes of a Designated Heritage Property under Section 33 and 34 of the Ontario Heritage Act and Authority to Enter into a Heritage Easement AgreementFiled record
- 808 Mount Pleasant Road and 247-251 Roehampton Avenue - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 146-150 Vaughan Road - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 5 Huntley Street and 2-8 Earl Street and a Portion of 10 Earl Street - Official Plan and Zoning By-law Amendment Application - Decision Report - ApprovalFiled record