Re-open Items TE27.50, Roxborough Street West (Phase 2) - Construction Staging Area - Amendments and TE33.70, Improving Pedestrian Safety on Roxborough Road
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2026-07-08 · Toronto and East York Community Council · adopted
As filed
The Toronto and East York Community Council: 1. Re-opened TE27.50, Roxborough Street West (Phase 2) - Construction Staging Area as it pertains to Part 1. 2. Amended Part 1 of its decision on TE27.50 by deleting the date "June 30, 2026" and inserting the date "December 31, 2026" so that it now reads: 1. Authorized the closure of the south sidewalk and a 3.6 metre wide portion of the eastbound curb lane on Roxborough Street West, between Yonge Street and a point 35 metres west, from December 1, 2025 to December 31, 2026 , inclusive.
Show the rest of As filed, 568 more characters as filed
3. Re-opened TE33.70, Improving Pedestrian Safety on Roxborough Road. 4. Amended its decision on TE33.70 by deleting "100 metres" and inserting "40 metres" so that it now reads: 23. Direct the General Manager, Transportation Services to install a temporary pedestrian crossover 40 metres west of Paul Hahn Lane to ensure that pedestrians can safely cross Roxborough Street West in order to walk to Yonge Street on the sole remaining (north side) sidewalk, until the south sidewalk on Roxborough Street West on the block west of Yonge Street is reopened to pedestrians.
On the agenda
As the city filed it
By 2026.TE33.70, Toronto and East York Community Council amended a construction staging area (2025.TE27.50) for the construction of the new multi-unit residential building at 1 Roxborough Street West. That motion required Transportation Services to install a temporary pedestrian crossover 100m west of Paul Hahn Lane for the duration of the construction road occupancy, to ensure that pedestrians on the south side of the road have a safe access to the sole remaining (north side) sidewalk.
Show the rest of As the city filed it, 214 more characters as filed
Transportation Services has since advised that it is safer and more feasible to construct the pedestrian crossover 40m west of Paul Hahn Lane. Also, the current staging permit expires before the next TEYCC meeting.
Staff recommended
Councillor Dianne Saxe recommends that: 1. Toronto and East York Community Council re-open TE27.50, Roxborough Street West (Phase 2) - Construction Staging Area as it pertains to Part 1. 2. Toronto and East York Community Council amend Part 1 of its decision by deleting the date "June 30, 2026" and inserting the date "December 31, 2026" so that it now reads: 1. Authorized the closure of the south sidewalk and a 3.6 metre wide portion of the eastbound curb lane on Roxborough Street West, between Yonge Street and a point 35 metres west, from December 1, 2025 to December 31, 2026 , inclusive.
Show the rest of Staff recommended, 633 more characters as filed
3. Toronto and East York Community Council re-open TE33.70, Improving Pedestrian Safety on Roxborough Road. 4. Toronto and East York Community Council amend its decision by deleting "100 metres" and inserting "40 metres" so that it now reads: 23. Direct the General Manager, Transportation Services to install a temporary pedestrian crossover 40 metres west of Paul Hahn Lane to ensure that pedestrians can safely cross Roxborough Street West in order to walk to Yonge Street on the sole remaining (north side) sidewalk, until the south sidewalk on Roxborough Street West on the block west of Yonge Street is reopened to pedestrians.
On the record
More from this meeting
- 793 Adelaide Street West: one-unit demolition application referred to council with no replacement building permit yet fileddevelopment
- 26 Ossington Avenue demolition application approved without debatehousing
- 83 Dunvegan Road demolition application; staff recommends approvalhousing
- City Council to decide on permit parking exclusions for various developments in Toronto and East Yorktransit
- Northline Road parking regulation corrected to match posted signs ahead of 2026 electiontransit
- Speed humps approved for Hutton Avenue between O'Connor Drive and Plains Roadtransit