The filed record
Urgent Environmental Assessment Request - Downsview Avenue
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2019-09-16 · North York Community Council · adopted
As filed
North York Community Council: 1. Requested the General Manager, Toronto Water to report back on the feasibility and cost of conducting a localized Basement Flooding Environmental Assessment Study of the area bounded by Petherhill Avenue to the east, Highway 401 to the south, Jane Street to the west and Wilson Avenue to the north; commencing no later than January 2020.
On the agenda
As the city filed it
During the last decade, the City of Toronto has seen a surge on property flooding incidents closely tied to powerful storm events. Ward 6 and adjacent Wards have been home to many of these incidents. Residents living west of the Humber River Hospital, and to the north and south areas of Wilson Ave., experienced extreme basement flooding from storm events in 2013 and 2018. Subsequently, almost all claims made by affected residents have been rejected.
Show the rest of As the city filed it, 2,059 more characters as filed
Currently these residents live in fear every time a storm is forecasted. The proximity to Black Creek, Highway 401, and the recently completed Humber River Hospital, have all reportedly contributed to the community's increasing flooding risks. The Ridge Park storm water management pond and related infrastructure were completed in 2013, while the hospital opened its door in 2015. These two new additions in the neighbourhood were quickly identified as key factors altering storm water flow in the area. As a result, the City has been working with the Ministry of Transportation to upgrade the ditch running parallel to Downsview Ave. between Ridge Road and Black Creek; and with Infrastructure Ontario to increase capacity at the Ridge Park storm water management pond. As of August 2019, the design for the pond was completed with expected construction to begin by the end of the year. Aside from land development and natural phenomena, aging sewer and storm water infrastructure have also been identified as flooding catalysts. Throughout the last decade, the City Of Toronto conducted a series of Environmental Assessment (EA) Studies to catalog existing infrastructure preventing or propelling flooding scenarios. These EAs ultimately proposed a series of sewer and storm management upgrades across several neighbourhoods in Toronto. The Downsview Avenue neighbourhood, was included in Study Area 16 (Black Creek/Highway 401/Dufferin Street). The study began in 2007 and concluded in 2012. At the time, the contracted consulting firm, Stantec, discounted the need for flooding prevention measures. Since the latest Environmental Assessment Study, the area has seen significant development and flooding incidents have worsened. On April 29, 2019, one hundred and fifteen residents (115) provided a petition to our office requesting that the below-grade infrastructure around and west of the Humber River Hospital, be assessed and upgraded. Based on the information stated above, our office requests that the residents' concerns be addressed with urgency.
Staff recommended
Councillor James Pasternak recommends that North York Community Council: 1. Request the General Manager and Toronto Water to report back on the feasibility and cost of conducting a localized Basement Flooding Environmental Assessment Study of the area bounded by Petherhill Avenue to the east, Highway 401 to the south, Jane Street to the west and Wilson Avenue to the north; commencing no later than January 2020.
On the record
More from this meeting
- Final Report - Zoning By-law Amendment - 25 Fisherville RoadFiled record
- Final Report - Rental Housing Demolition Applications - 100 Broadway Avenue, 223-225 Redpath Avenue and 227-233 Redpath AvenueFiled record
- Final Report - Zoning By-Law Amendment Application - 1299 Don Mills RoadFiled record
- Alterations to a Designated Heritage Property at 1299 Don Mills Road and Authority to Enter into a Heritage Easement AgreementFiled record
- Preliminary Report - Official Plan Amendment and Zoning Amendment Applications - 2490-2514 Yonge Street, 10-12 Castlefield Avenue, and portions of 20 Castlefield Avenue and 567 Duplex AvenueFiled record
- Preliminary Report - Zoning By-law Amendment Application - 196 Valley RoadFiled record