Missing Link Sidewalk Program - Dwight Avenue Sidewalk Installation
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2021-12-15 · Toronto City Council · amended
As filed
City Council on December 15, 16 and 17, 2021, adopted the following: 1. City Council request the General Manager, Transportation Services to postpone the construction of a new sidewalk on the west side of Dwight Avenue from Birmingham Street to Maple Boulevard until a new design can be achieved though the planned construction of bike lanes on Dwight Avenue or through a future reconstruction of Dwight Avenue that does not impact the mature trees.
The vote
Adopt Item as Amended · Carried, 25-0
The whole record, all 26 members
- Ana BailãoFor
- Anthony PerruzzaAbsent
- Brad BradfordFor
- Cynthia LaiFor
- Denzil Minnan-WongFor
- Frances NunziataFor
- Gary CrawfordFor
- Gord PerksFor
- James PasternakFor
- Jaye RobinsonFor
- Jennifer McKelvieFor
- Joe CressyFor
- John FilionFor
- John ToryFor
- Josh MatlowFor
- Kristyn Wong-TamFor
- Mark GrimesFor
- Michael FordFor
- Michael ThompsonFor
- Mike ColleFor
- Mike LaytonFor
- Nick MantasFor
- Paul AinslieFor
- Paula FletcherFor
- Shelley CarrollFor
- Stephen HolydayFor
Every name opens that member’s record.
On the agenda
As the city filed it
Provision of safe, comfortable and accessible sidewalks on all public streets is a fundamental objective of the Vision Zero 2.0 Road Safety Plan. Sidewalks support safety, accessibility, affordable transportation, physical activity, safe routes to school, aging in place and sustainable growth. Through the Missing Links Sidewalk Installation Program, Transportation Services reviews opportunities to install sidewalks on all roadway classifications through bundling with other state-of-good-repair work, as well as stand-alone delivery.
Show the rest of As the city filed it, 1,452 more characters as filed
Dwight Avenue is classified as a collector road. City policy calls for sidewalks on both sides of collector roads. In 2016, Transportation Services received a request from the Toronto District School Board to install a sidewalk on the west side of Dwight Avenue adjacent to Second Street Jr. Middle School. A sidewalk on the west side of Dwight Avenue adjacent to the school was programmed for construction in 2021 based on opportunity for the work to bundled with adjacent state-of-good-repair work on Birmingham Street, Murrie Street, and Herman Street. While options to minimize impact on trees were considered as part of the design process, a total of 12 trees need to be removed to construct the sidewalk. In October 2021, City Council directed the General Manager, Transportation Services to halt this project and report back to the December 2, 2021 Infrastructure and Environment Committee meeting on the feasibility of narrowing Dwight Avenue to accommodate the proposed new sidewalk and save the existing trees. This report provides information in response to that request. This sidewalk provides an essential missing link in the sidewalk network and is adjacent to a school. Transportation Services recommends proceeding with the sidewalk installation and tree removal based on the current design and enhanced replanting plan that is proposed which includes 17 trees to be replanted in this location to continue growing Toronto's tree canopy.
Staff recommended
The General Manager, Transportation Services recommends that: 1. City Council request the General Manager, Transportation Services to continue with the planned construction of a new sidewalk on the west side of Dwight Avenue from Birmingham Street to Maple Boulevard.
Considered
2021-12-02 · Infrastructure and Environment Committee · adopted
Decision as filed
The Infrastructure and Environment Committee recommends that: 1. City Council request the General Manager, Transportation Services to continue with the planned construction of a new sidewalk on the west side of Dwight Avenue from Birmingham Street to Maple Boulevard.
2021-12-15 · Toronto City Council · amended
Clerk’s note
City Council considered Items IE26.6 and IE26.14 together.
On the record
More from this meeting
- Amendment to Purchase Order Number 6050693 with Ecosystem Energy for the Comprehensive Energy Retrofit Project at Emergency Services HeadquartersFiled record
- Award of Request for Proposal Document Number 2913757955 to Black and Veatch Canada Company for the Preliminary Design of the Black Creek Class Environmental Assessment Solution and Detailed Design, Construction Services and Post Construction Services for Phase One WorksFiled record
- Amendment to Purchase Order Number 6043932 with Drainstar Contracting Limited for Construction Services for the Basement Flooding Protection Program Storm and Sanitary Sewer Improvements and Watermain Replacement on Bestview Drive, Goldenwood Road, Harrington Crescent and Kentland CrescentFiled record
- Award of Negotiated Request for Proposals to Various Suppliers for the Provision of Winter Maintenance ServicesFiled record
- Non-Competitive Contract for Two-Way Radio Supply and Service with BearCom Canada CorporationFiled record
- Actions to Reaffirm Toronto's Tree Canopy TargetFiled record