Construction Staging Area - 100-120 Broadway Avenue

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2021-12-15 · Toronto City Council · amended

As filed

City Council on December 15, 16 and 17, 2021, adopted the following: 1. City Council authorize the closure of the north sidewalk and a 2.7 metre-wide portion of the westbound north-side curb lane on Broadway Avenue, between Redpath Avenue and a point 102 metres east, for a period of 13 months from December 16, 2021 to December 31, 2022. 2. City Council authorize the closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 33 months from December 16, 2021 to August 31, 2022.

Show the rest of As filed, 3,808 more characters as filed

3. City Council rescind the existing no parking prohibition in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 4. City Council prohibit stopping at all times on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 5. City Council rescind the existing maximum one-hour parking regulation, in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday, on the east side of Redpath Avenue, between Broadway Avenue and a point 74 metres north. 6. City Council prohibit stopping at all times on the east side of Redpath Avenue between Broadway Avenue and a point 74 metres north. 7. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and make them safe. 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant to monitor and provide results of noise and vibration monitoring to the Work Zone Construction Coordination Unit, for the City to monitor and comment on. 17. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 18. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete. 19. City Council authorize the closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 13 months from December 16, 2021 to December 31, 2022. 20. City Council authorize the installation of a pedestrian crossover on Broadway Avenue at a point approximately 161 metres east of Yonge Street.

The vote

Adopt Item as Amended · Carried, 22-0

For (22)Ana Bailão, Anthony Perruzza, Brad Bradford, Cynthia Lai, Denzil Minnan-Wong, Frances Nunziata, Gary Crawford, Gord Perks, James Pasternak, Jaye Robinson, Jennifer McKelvie, Joe Cressy, John Filion, Josh Matlow, Kristyn Wong-Tam, Mark Grimes, Michael Ford, Michael Thompson, Mike Layton, Paul Ainslie, Paula Fletcher, Stephen Holyday
The whole record, all 26 members

Every name opens that member’s record.

On the agenda

As the city filed it

This report is submitted to Infrastructure and Environment Committee as Broadway Avenue forms a shared boundary between the Toronto and East York Community Council and the North York Community Council. Reserve Properties Limited is constructing 33 and 21 level condominium towers with a 9 level podium and a 36 level rental tower located on the north side of Broadway Avenue, between Redpath Avenue and Mount Pleasant Road.

Show the rest of As the city filed it, 1,595 more characters as filed

The developer's anticipated timeline for a construction staging area requires a closure of the north sidewalk and a 2.7 metre-wide portion of the westbound north-side curb lane on Broadway Avenue, between Redpath Avenue and a point 102 metres east, for a period of 13 months (i.e., December 16, 2021 to December 31, 2022). The developer will also require a closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 33 months (i.e., December 16, 2021 to August 31, 2024). Transportation Services is recommending the provision of an initial construction staging permit for 13 months (i.e., December 16, 2021 to December 31, 2022) and monitoring the need for construction staging and an extension as it is deemed necessary. Pedestrian operations on the north side of Broadway Avenue will be maintained in a 2.1 metre-wide covered and protected walkway within the closed portion of the existing westbound lane. The construction staging area on Broadway Avenue will result in the partial occupation of the westbound traffic lane, resulting in a 7.0 metre-wide lane for traffic. Pedestrian operations on the east side of Redpath Avenue will be maintained in a 1.7 metre-wide covered and protected walkway within the closed portion of the existing northbound lane. The construction staging area on Broadway Avenue will result in the partial occupation of the northbound traffic lane, resulting in a 3.5 metre-wide lane for northbound traffic and a 3.5 metre-wide lane for southbound traffic.

Staff recommended

The General Manager, Transportation Services recommends that: 1. City Council authorize the closure of the north sidewalk and a 2.7 metre-wide portion of the westbound north-side curb lane on Broadway Avenue, between Redpath Avenue and a point 102 metres east, for a period of 13 months from December 16, 2021 to December 31, 2022. 2. City Council authorize the closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 33 months from December 16, 2021 to August 31, 2022.

Show the rest of Staff recommended, 3,406 more characters as filed

3. City Council rescind the existing no parking prohibition in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 4. City Council prohibit stopping at all times on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 5. City Council rescind the existing maximum one-hour parking regulation, in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday, on the east side of Redpath Avenue, between Broadway Avenue and a point 74 metres north. 6. City Council prohibit stopping at all times on the east side of Redpath Avenue between Broadway Avenue and a point 74 metres north. 7. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and make them safe. 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant to monitor and provide results of noise and vibration monitoring to the Work Zone Construction Coordination Unit, for the City to monitor and comment on. 17. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 18. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

Considered

  • 2021-12-02 · Infrastructure and Environment Committee · amended

    Decision as filed

    The Infrastructure and Environment Committee recommends that: 1. City Council authorize the closure of the north sidewalk and a 2.7 metre-wide portion of the westbound north-side curb lane on Broadway Avenue, between Redpath Avenue and a point 102 metres east, for a period of 13 months from December 16, 2021 to December 31, 2022. 2. City Council authorize the closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 33 months from December 16, 2021 to August 31, 2022.

    Show the rest of Decision as filed, 3,661 more characters as filed

    3. City Council rescind the existing no parking prohibition in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 4. City Council prohibit stopping at all times on the north side of Broadway Avenue between a point 72.5 metres east of Redpath Avenue and a point 29.5 metres further east. 5. City Council rescind the existing maximum one-hour parking regulation, in effect from 8:00 a.m. to 6:00 p.m. Monday to Friday, on the east side of Redpath Avenue, between Broadway Avenue and a point 74 metres north. 6. City Council prohibit stopping at all times on the east side of Redpath Avenue between Broadway Avenue and a point 74 metres north. 7. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and make them safe. 8. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. City Council direct the applicant to monitor and provide results of noise and vibration monitoring to the Work Zone Construction Coordination Unit, for the City to monitor and comment on. 17. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 18. City Council direct that Broadway Avenue be returned to its pre-construction traffic and parking regulations when the project is complete. 19. City Council authorize the closure of the east sidewalk and a 1.6 metre-wide portion of the northbound lane on Redpath Avenue, between Broadway Avenue and a point 74 metres north, for a period of 13 months from December 16, 2021 to December 31, 2022.

  • 2021-12-15 · Toronto City Council · amended

On the record

The item as the City filed it