Construction Staging Area - 48-58 Scollard Street and 1315-1325 Bay Street
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2021-10-01 · Toronto City Council · adopted
As filed
City Council on October 1 and 4, 2021, adopted the following: 1. City Council authorize the closure of the east sidewalk and a 2.9 metre-wide portion of the northbound curb lane on Bay Street, between Scollard Street and a point 61 metres to the north, from October 1, 2021 to August 31, 2024. 2. City Council authorize the closure of the north sidewalk and a 4.5 metre-wide portion of the westbound curb lane on Scollard Street, between Bay Street and a point 61.3 metres east, from October 1, 2021 to August 31, 2024.
Show the rest of As filed, 2,636 more characters as filed
3. City Council rescind the existing standing prohibition in effect at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 4. City Council prohibit stopping at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. City Council direct that Bay Street and Scollard Street be returned to their pre-construction traffic and parking regulations when the project is complete.
On the agenda
As the city filed it
As the Toronto Transit Commission (TTC) operates a transit service on Bay Street East, City Council approval of this report is required. Lanterra Developments Limited is constructing a 43-storey mixed use residential and commercial condominium building at 48-58 Scollard Street and 1315-1325 Bay Street. The site is located at the north-east corner of Scollard Street and Bay Street. Transportation Services is requesting authorization to close the east sidewalk and a 2.9 metre-wide portion of the northbound curb lane on Bay Street, between Scollard Street and a point 61 metres to the north, for a period of 35 months (i.e., October 1, 2021 to August 31, 2024) to accommodate a construction staging area.
Show the rest of As the city filed it, 992 more characters as filed
Transportation Services is also requesting authorization to close the north side sidewalk and a 4.5 metre-wide portion of the westbound lane on Scollard Street, between Bay Street and a point 61.3 metres to the east, for the same period. Pedestrian operations on the east side of Bay Street will be maintained in a 2.1 metre-wide covered and protected walkway within the closed portion of the existing lane. A northbound bike lane will be maintained at 1.5 metres in width, and will be adjacent to the walkway. Pedestrian operations on the north side of Scollard Street will be maintained in a 1.7 metre-wide covered and protected walkway within the closed portion of the existing lane. The construction staging area on Bay Street will result in the loss of one northbound traffic lane in which stopping will be prohibited at all times. The number of westbound lanes will not be reduced on Scollard Street; however, stopping will be prohibited at all times due to the partial lane occupation.
Staff recommended
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the east sidewalk and a 2.9 metre-wide portion of the northbound curb lane on Bay Street, between Scollard Street and a point 61 metres to the north, from October 1, 2021 to August 31, 2024. 2. City Council authorize the closure of the north sidewalk and a 4.5 metre-wide portion of the westbound curb lane on Scollard Street, between Bay Street and a point 61.3 metres east, from October 1, 2021 to August 31, 2024.
Show the rest of Staff recommended, 2,636 more characters as filed
3. City Council rescind the existing standing prohibition in effect at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 4. City Council prohibit stopping at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. City Council direct that Bay Street and Scollard Street be returned to their pre-construction traffic and parking regulations when the project is complete.
Considered
2021-09-09 · Toronto and East York Community Council · adopted
Decision as filed
The Toronto and East York Community Council recommends that: 1. City Council authorize the closure of the east sidewalk and a 2.9 metre-wide portion of the northbound curb lane on Bay Street, between Scollard Street and a point 61 metres to the north, from October 1, 2021 to August 31, 2024. 2. City Council authorize the closure of the north sidewalk and a 4.5 metre-wide portion of the westbound curb lane on Scollard Street, between Bay Street and a point 61.3 metres east, from October 1, 2021 to August 31, 2024.
Show the rest of Decision as filed, 2,636 more characters as filed
3. City Council rescind the existing standing prohibition in effect at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 4. City Council prohibit stopping at all times on the north side of Scollard Street, between Bay Street and a point 61.3 metres east. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. City Council direct that Bay Street and Scollard Street be returned to their pre-construction traffic and parking regulations when the project is complete.
2021-10-01 · Toronto City Council · adopted
On the record
More from this meeting
- Naming of Private Walkway adjacent to Wellesley Subway StationFiled record
- Naming of an existing Public Lane south of Gerrard Street East, extending easterly from Wayland AvenueFiled record
- Naming of an existing Public Lane north of Queen Street East, extending between Wineva Avenue and Hammersmith AvenueFiled record
- 109-125 George Street and 231 Richmond Street East - Official Plan and Zoning By-law Amendment Application - Final ReportFiled record
- 2494 Danforth Avenue - Zoning Amendment Application - Final ReportFiled record
- 717 Church Street, and 85-97 Collier Street - Zoning Amendment Application - Request for Direction ReportFiled record