The filed record
2022 Mid Humber Gap Municipal Class Environmental Assessment
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2022-07-19 · Toronto City Council · amended
As filed
City Council on July 19, 20, 21 and 22, 2022, adopted the following: 1. City Council endorse the recommended preferred trail alignment concept for the Mid Humber Gap to include the in-valley Concept 1A as per Attachment 1 to the report (June 23, 2022) from the General Manager, Transportation Services and the General Manager, Parks, Forestry and Recreation. 2. City Council request the Toronto and Region Conservation Authority, the General Manager, Transportation Services and the General Manager, Parks, Forestry and Recreation to prepare the Final Report, issue the Notice of Completion, and put the Final Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
Show the rest of As filed, 247 more characters as filed
3. City Council request the Toronto and Region Conservation Authority, the General Manager, Transportation Services and the General Manager, Parks, Forestry and Recreation to continue discussions with local stakeholders as part of detailed design.
The vote
Adopt Item as Amended · Carried, 18-1
The whole record, all 25 members
- Ana BailãoAbsent
- Anthony PerruzzaFor
- Brad BradfordAbsent
- Cynthia LaiFor
- Denzil Minnan-WongFor
- Frances NunziataFor
- Gary CrawfordFor
- Gord PerksFor
- James PasternakFor
- Jaye RobinsonAbsent
- Jennifer McKelvieFor
- Joe MihevcFor
- John FilionFor
- John ToryFor
- Josh MatlowAbsent
- Mark GrimesFor
- Michael ThompsonFor
- Mike ColleFor
- Mike LaytonAbsent
- Nick MantasFor
- Paul AinslieFor
- Paula FletcherFor
- Robin Buxton PottsAbsent
- Shelley CarrollFor
- Stephen HolydayAgainst
Every name opens that member’s record.
On the agenda
As the city filed it
The Mid Humber Gap is located within Wards 1 (Etobicoke North) and Ward 5 (York-South Weston). It refers to an 800 metre (m) gap in the Humber River Trail between Crawford-Jones Memorial Park to the north, and the Mallaby Park to the south. The Mid Humber Gap constitutes a significant barrier to a continuous Humber River Trail system from Toronto's northwest boundary to Lake Ontario and is also a barrier to delivering the future Loop Trail.
Show the rest of As the city filed it, 1,673 more characters as filed
The Loop Trail will be a continuous 65 kilometre off-road, multi-use ring trail that will connect multiple ravines, neighbourhoods, and trail systems throughout Toronto. In 2019, a preliminary feasibility study was undertaken to evaluate trail alignment concepts that would close this gap in the Humber River Trail. The preliminary findings of this analysis provided strong rationale for undertaking a more rigorous evaluation framework. This lead to the City of Toronto, together with the Toronto and Region Conservation Authority, initiating a Municipal Class Environmental Assessment study in 2021 to identify the preferred multi-use trail alignment for the Mid Humber Gap. Public input was incorporated through two rounds of public consultation which included virtual public meetings, Stakeholder Advisory Group sessions, online questionnaires and individual meetings with property owners. Among the emerging directions, this report recommends the preferred trail alignment, an in-valley option, for endorsement by City Council. The recommended preferred design consists of an asphalt 4 m wide multi-use trail, including two pedestrian-cycle bridges and an elevated boardwalk. From Crawford-Jones Memorial Park, the trail would cross the Humber River via a new pedestrian-cycle bridge. A paved multi-use trail would be built along the west bank of the Humber River through land owned by the Weston Golf and Country Club. A second pedestrian-cycle bridge would connect to the east bank of the Humber River on land owned through a private trust. A new paved multi-use trail through the land trust property would connect to the existing Humber River Trail at Mallaby Park.
Staff recommended
The General Manager, Transportation Services and the General Manager, Parks, Forestry and Recreation recommend that: 1. City Council endorse the recommended preferred trail alignment concept for the Mid Humber Gap to include the in-valley Concept 1A as per Attachment 1. 2. City Council request the Toronto and Region Conservation Authority and General Manager, Transportation Services and General Manager, Parks, Forestry
Show the rest of Staff recommended, 206 more characters as filed
and Recreation to prepare the Final Report, issue the Notice of Completion, and put the Final Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
Considered
2022-07-07 · Infrastructure and Environment Committee · adopted
Decision as filed
The Infrastructure and Environment Committee recommends that: 1. City Council endorse the recommended preferred trail alignment concept for the Mid Humber Gap to include the in-valley Concept 1A as per Attachment 1 to the report (June 23, 2022) from the General Manager, Transportation Services and the General Manager, Parks, Forestry and Recreation. 2. City Council request the Toronto and Region Conservation Authority
Show the rest of Decision as filed, 288 more characters as filed
and General Manager, Transportation Services and General Manager, Parks, Forestry and Recreation to prepare the Final Report, issue the Notice of Completion, and put the Final Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
2022-07-19 · Toronto City Council · amended
On the record
More from this meeting
- Amendment to Purchase Order Number 6044650 with Candevcon Limited for the Detailed Design of the Port Union Road WideningFiled record
- Amendments to Blanket Contract 47022825 with SNF Canada Limited and Blanket Contract 47022823 with Quadra Chemicals Limited for Polymer Related to Biosolids Dewatering and Waste Activated Sludge Thickening for the Ashbridges Bay Treatment PlantFiled record
- Amendment to Purchase Order Number 6040249 with WSP Canada Incorporated for Professional Engineering Services for the Rehabilitation and Upgrade of Seven (7) Sewage Pumping Stations (Group 5) at Various LocationsFiled record
- Contract Award for Construction Services to GFL Infrastructure Group Incorporated for the Basement Flooding Protection Program - Ariba Document 3403799980Filed record
- Award of Request for Tender Ariba Document Number 3320202763 for the Biosolids Master Plan Implementation Project and South Facility Upgrades Project at Highland Creek Treatment Plant and Amendment to Purchase Order Number 6052723 with CH2M Hill Canada Limited for Contract Administration ServicesFiled record
- Entering into a Fundraising Agreement and Management Agreement with Friends of Allan GardensFiled record