Strathearn Road Reconstruction Contract 20ECS-TI-104LR - Postponing Installation of New Sidewalk - by Councillor Josh Matlow, seconded by Councillor Mike Colle
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2022-02-02 · Toronto City Council · adopted
As filed
City Council on February 2 and 3, 2022, adopted the following: 1. City Council direct the General Manager, Transportation Services and the Chief Engineer and Executive Director, Engineering and Construction Services, to postpone the planned installation of a new sidewalk on the south side Strathearn Road, between Bathurst Street and Glen Cedar Road through the removal of this scope from the active road construction contract,
Show the rest of As filed, 157 more characters as filed
and that consideration of this location for a new sidewalk be reconsidered at a future time with reduced impact to the mature trees and landscaping features.
On the agenda
As the city filed it
Strathearn Road between Bathurst Street and Glen Cedar Road is a part of an active state-of-good-repair construction contract, 20ECS-TI-104LR, which includes road reconstruction and sub-standard water service replacements. A new sidewalk was proposed on the south side of Strathearn Road as part of this project because this segment of Strathearn Road is classified a Collector Roadway. There is an existing sidewalk on the north side of the road.
Show the rest of As the city filed it, 1,060 more characters as filed
Immediately west of Glen Cedar Road, Strathearn Road is classified as a Local Roadway. Several residents of Strathearn Road reached out to my office over a number of concerns around the planned sidewalk installation on the south side of Strathearn Road, between Bathurst Street and Glen Cedar Road, as part of the road reconstruction project. That side of the street has many mature trees and landscaping features that will be significantly impacted. While City staff have made best efforts to minimize impacts in the design of the proposed new sidewalk, a petition has been submitted about the project as there are concerns about how construction impacts would be managed for driveways and landscaping including impacts on mature trees. As reconstruction has begun (is imminent), I would request that the scope of the new sidewalk be removed from the active construction contract, and consideration of this location for a new sidewalk be postponed in order to be reconsidered at a future time with reduced impact to the mature trees, and landscaping features.
Staff recommended
Councillor Josh Matlow, seconded by Councillor Mike Colle, recommends that: 1. City Council direct the General Manager, Transportation Services and the Chief Engineer and Executive Director, Engineering and Construction Services, to postpone the planned installation of a new sidewalk on the south side Strathearn Road, between Bathurst Street and Glen Cedar Road through the removal of this scope from the active road construction
Show the rest of Staff recommended, 167 more characters as filed
contract, and that consideration of this location for a new sidewalk be reconsidered at a future time with reduced impact to the mature trees and landscaping features.
On the record
More from this meeting
- Introduction and Enactment of General Bills and Confirming BillsFiled record
- Report on Councillor Mark Grimes’ actions relating to Adamson BarbecueFiled record
- Assumption of Services, University Square (Hucknall) Limited, Plan 66M-2493, Subdivision File: 04 138822 NNY 08 SB, 102-134 Hucknall Road - LitigationFiled record
- Regarding Toronto Paramedic ServicesFiled record
- 847 Jane Street - Alcohol and Gaming Commission of Ontario Liquor Licence Application - by Councillor Frances Nunziata, seconded by Councillor Paula FletcherFiled record
- Call to OrderFiled record