Construction Staging Area - 15 Devonshire Place

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2022-01-06 · Toronto and East York Community Council · adopted

As filed

The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 2.1 metre wide portion of the northbound curb lane on Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from March 31, 2022 to March 31, 2024. 2. Amended the existing parking machine regulation in effect from 8:00 a.m.

Show the rest of As filed, 2,931 more characters as filed

to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $4.00 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between Hoskin Avenue and Bloor Street West, to be in effect from Hoskin Avenue and a point 120 metres north. 3. Authorized parking machines in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $4.00 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between a point 180 metres north of Hoskin Avenue and Bloor Street West. 4. Prohibited stopping at all times on the east side of Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north. 5. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe. 6. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. Directed that Devonshire Place be returned to its pre-construction traffic and parking regulations when the project is complete.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. RDH Architects Inc is constructing a four-storey University of Toronto student residence, with 350 units at 15 Devonshire Place. The site is located on the east side of Devonshire Place, midblock between Hoskin Avenue and Bloor Street West. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound curb lane on Devonshire Place for a period of 24 months (i.e.

Show the rest of As the city filed it, 518 more characters as filed

March 31, 2022 to March 31, 2024) to accommodate a construction staging area. Pedestrian operations on the east side of Devonshire Place will be maintained in a 2.1 metre-wide covered and protected walkway within the closed portion of the existing northbound lane. The number of northbound lanes will not be reduced and two-way traffic movement will be maintained on Devonshire Place. The construction staging area will result in the loss of eight on-street parking machine spaces on the east side of Devonshire Place.

Staff recommended

The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 2.1 metre wide portion of the northbound curb lane on Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from March 31, 2022 to March 31, 2024.

Show the rest of Staff recommended, 3,502 more characters as filed

2. Toronto and East York Community Council amend the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $4.00 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between Hoskin Avenue and Bloor Street West, to be in effect from Hoskin Avenue and a point 120 metres north. 3. Toronto and East York Community Council authorize parking machines in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $4.00 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between a point 180 metres north of Hoskin Avenue and Bloor Street West. 4. Toronto and East York Community Council prohibit stopping at all times on the east side of Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north. 5. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe. 6. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. Toronto and East York Community Council direct that Devonshire Place be returned to its pre-construction traffic and parking regulations when the project is complete.