Etobicoke York Community Council · 2023-06-19 · 2023.EY6.20

The filed record

240 Markland Drive - Construction Staging Area

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2023-07-19 · Toronto City Council · adopted

As filed

City Council on July 19 and 20, 2023, adopted the following: 1. City Council authorize the closure of the south sidewalk on Bloor Street West, between a point 38.0 metres east of Markland Drive (west intersection) and a point 79.0 metres further east, from August 1, 2023 to July 31, 2025. 2. City Council prohibit stopping at all times on the south side of Bloor Street West, between Markland Drive (west intersection) and a point 117.0 metres further east.

Show the rest of As filed, 5,178 more characters as filed

3. City Council prohibit stopping at all times on the east side of Markland Drive (west intersection), between Bloor Street West and a point 27.4 metres south of Bloor Street West. 4. City Council prohibit stopping at all times on the west side of Markland Drive (west intersection), between Bloor Street West and a point 24.4 metres south of Bloor Street West. 5. City Council rescind the existing Heavy Vehicles prohibition on Markland Drive (west intersection), between Bloor Street West and a point 30.5 metres south. 6. City Council authorize the installation of a temporary traffic control signal on Bloor Street West, approximately 253.7 metres east of Markland Drive (west intersection), to be in-operation from August 1, 2023 to July 31, 2025, which the issuance of the construction staging permit must be conditional on the traffic control signal being operational. 7. City Council authorize the following conditions of the construction staging permit, which relate to the temporary traffic control signal: a. a deposit will be required to be submitted to "The Treasurer, City of Toronto", in advance of the permit being issued. The deposit is required to cover costs incurred by the City, in the event the developer does not provide a service that it must, as stipulated in the permit agreement conditions below. Upon completion of the construction project and return to normal operation, the unused portion of the deposit will be returned to the developer; b. the developer will be responsible for the installation, maintenance and removal of the traffic control signal by one of the electrical contractors pre-approved by the City's Traffic Systems Construction and Maintenance Unit. Maintenance levels specified by the City's Traffic Systems Construction and Maintenance Unit must be followed, to be in accordance with those followed by the City's Electrical Maintenance Contractor for the maintenance of the City's other traffic control signals; and c. the developer must provide to Transportation Services a 7 day/24 hr contact name, phone number and email address, for the City's dispatchers to forward operational malfunction/complaints to. If the City's dispatcher is not able to reach the contact by phone to provide details of a malfunction/complaint, then the City's Electrical Maintenance Contractor will be dispatched to investigate and complete repairs and the City's dispatcher will send an email to document the malfunction call and their inability to reach the contact. The response and repair costs will be deducted from the deposit provided to the City. 8. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to install cane detection within the walkway (where applicable) to guide pedestrians who are visually impaired. 15. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 18. City Council direct that Bloor Street West and Markland Drive be returned to their pre-construction traffic and parking regulations when the project is complete.

On the agenda

As the city filed it

As the Toronto Transit Commission (TTC) operates a transit service on Bloor Street West, City Council approval of this report is required. Carttera Management Inc. is constructing a nine-storey rental apartment building at 240 Markland Drive. The site is located at the south east corner of Bloor Street West and Markland Drive (west intersection). Transportation Services is requesting approval to temporarily close the south sidewalk on Bloor Street West, between a point 38.0 metres east of Markland Drive (west intersection) and a point 79.0 metres further east for a period of 24 months, from August 1, 2023 to July 31, 2025 to facilitate construction staging operations.

Show the rest of As the city filed it, 182 more characters as filed

Pedestrian movements on the south side of Bloor Street West abutting the site will be restricted and pedestrians will be directed to use the north side sidewalk of Bloor Street West.

Staff recommended

The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the south sidewalk on Bloor Street West, between a point 38.0 metres east of Markland Drive (west intersection) and a point 79.0 metres further east, from August 1, 2023 to July 31, 2025. 2. City Council prohibit stopping at all times on the south side of Bloor Street West, between Markland Drive (west intersection) and a point 117.0 metres further east.

Show the rest of Staff recommended, 5,188 more characters as filed

3. City Council prohibit stopping at all times on the east side of Markland Drive (west intersection), between Bloor Street West and a point 27.4 metres south of Bloor Street West. 4. City Council prohibit stopping at all times on the west side of Markland Drive (west intersection), between Bloor Street West and a point 24.4 metres south of Bloor Street West. 5. City Council rescind the existing Heavy Vehicles prohibition on Markland Drive (west intersection), between Bloor Street West and a point 30.5 metres south. 6. City Council authorize the installation of a temporary traffic control signal on Bloor Street West, approximately 253.7 metres east of Markland Drive (west intersection), to be in-operation from August 1, 2023 to July 31, 2025, which the issuance of the construction staging permit must be conditional on the traffic control signal being operational. 7. City Council authorize the following conditions of the construction staging permit, which relate to the temporary traffic control signal: · A deposit will be required to be submitted to "The Treasurer, City of Toronto", in advance of the permit being issued. The deposit is required to cover costs incurred by the City, in the event the developer does not provide a service that it must, as stipulated in the permit agreement conditions below. Upon completion of the construction project and return to normal operation, the unused portion of the deposit will be returned to the developer. · The developer will be responsible for the installation, maintenance and removal of the traffic control signal by one of the electrical contractors pre-approved by the City's Traffic Systems Construction & Maintenance Unit. Maintenance levels specified by the City's Traffic Systems Construction & Maintenance Unit must be followed, to be in accordance with those followed by the City's Electrical Maintenance Contractor for the maintenance of the City's other traffic control signals. · The developer must provide to Transportation Services a 7 day/24 hr contact name, phone number and email address, for the City's dispatchers to forward operational malfunction/complaints to. If the City's dispatcher is not able to reach the contact by phone to provide details of a malfunction/complaint, then the City's Electrical Maintenance Contractor will be dispatched to investigate and complete repairs and the City's dispatcher will send an email to document the malfunction call and their inability to reach the contact. The response and repair costs will be deducted from the deposit provided to the City. 8. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to install cane detection within the walkway (where applicable) to guide pedestrians who are visually impaired. 15. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 18. City Council direct that Bloor Street West and Markland Drive be returned to their pre-construction traffic and parking regulations when the project is complete.

Considered

  • 2023-06-19 · Etobicoke York Community Council · adopted

    Decision as filed

    The Etobicoke and York Community Council recommends that: 1. City Council authorize the closure of the south sidewalk on Bloor Street West, between a point 38.0 metres east of Markland Drive (west intersection) and a point 79.0 metres further east, from August 1, 2023 to July 31, 2025. 2. City Council prohibit stopping at all times on the south side of Bloor Street West, between Markland Drive (west intersection) and a point 117.0 metres further east.

    Show the rest of Decision as filed, 5,188 more characters as filed

    3. City Council prohibit stopping at all times on the east side of Markland Drive (west intersection), between Bloor Street West and a point 27.4 metres south of Bloor Street West. 4. City Council prohibit stopping at all times on the west side of Markland Drive (west intersection), between Bloor Street West and a point 24.4 metres south of Bloor Street West. 5. City Council rescind the existing Heavy Vehicles prohibition on Markland Drive (west intersection), between Bloor Street West and a point 30.5 metres south. 6. City Council authorize the installation of a temporary traffic control signal on Bloor Street West, approximately 253.7 metres east of Markland Drive (west intersection), to be in-operation from August 1, 2023 to July 31, 2025, which the issuance of the construction staging permit must be conditional on the traffic control signal being operational. 7. City Council authorize the following conditions of the construction staging permit, which relate to the temporary traffic control signal: · A deposit will be required to be submitted to "The Treasurer, City of Toronto", in advance of the permit being issued. The deposit is required to cover costs incurred by the City, in the event the developer does not provide a service that it must, as stipulated in the permit agreement conditions below. Upon completion of the construction project and return to normal operation, the unused portion of the deposit will be returned to the developer. · The developer will be responsible for the installation, maintenance and removal of the traffic control signal by one of the electrical contractors pre-approved by the City's Traffic Systems Construction & Maintenance Unit. Maintenance levels specified by the City's Traffic Systems Construction & Maintenance Unit must be followed, to be in accordance with those followed by the City's Electrical Maintenance Contractor for the maintenance of the City's other traffic control signals. · The developer must provide to Transportation Services a 7 day/24 hr contact name, phone number and email address, for the City's dispatchers to forward operational malfunction/complaints to. If the City's dispatcher is not able to reach the contact by phone to provide details of a malfunction/complaint, then the City's Electrical Maintenance Contractor will be dispatched to investigate and complete repairs and the City's dispatcher will send an email to document the malfunction call and their inability to reach the contact. The response and repair costs will be deducted from the deposit provided to the City. 8. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to install cane detection within the walkway (where applicable) to guide pedestrians who are visually impaired. 15. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 18. City Council direct that Bloor Street West and Markland Drive be returned to their pre-construction traffic and parking regulations when the project is complete.

  • 2023-07-19 · Toronto City Council · adopted