General Government Committee · 2023-12-06 · 2023.GG8.8

The filed record

Emergency Non-Competitive Contract with EllisDon Civil Limited to Repair the Temporary Dufferin Street Bridges over Metrolinx Rail Corridor

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2023-12-13 · Toronto City Council · adopted

As filed

City Council on December 13, 14, and 15, 2023, adopted the following: 1. City Council receive the report (November 20, 2023) from the Chief Engineer and Executive Director, Engineering and Construction Services and the Chief Procurement Officer, Purchasing and Materials Management for information.

On the agenda

As the city filed it

The purpose of this report is to advise Toronto City Council, pursuant to Chapter 195 of the Toronto Municipal Code (Purchasing By-Law, Section 195-7.4), of a non-competitive contract with EllisDon Civil Limited, to procure construction services to repair damaged elements of the temporary Dufferin Street bridges over the Metrolinx rail corridor, south of Springhurst Avenue, for a total value of $1,320,000 excluding Harmonized Sales Tax ($1,343,232 net of Harmonized Sales Tax recoveries).

Show the rest of As the city filed it, 1,397 more characters as filed

The issuance of this non-competitive contract was a matter of urgency to accelerate the work required to re-open Dufferin Street following an emergency closure on July 13, 2023, due to damage to the bridge structures. This contract addresses the remediation of temporary bridges installed a decade ago. At that time, the existing permanent bridges needed replacement. These temporary bridges, designed to last only 10 years, were meant to give Metrolinx time to finalize plans for the rail corridor beneath them and to provide the City with the necessary specifications for the new permanent bridges. Despite considerable design efforts over the past ten years, Metrolinx has not yet finalized the required design specifications. Therefore, it is necessary to repair the temporary bridges, which remain in use as an interim measure until the design and construction of permanent bridge structures can proceed. The City will seek to recoup two-thirds of the repair costs from Metrolinx for their share of the emergency repair work. This repair was deemed an emergency by the former Interim Chief Engineer and Executive Director, Engineering and Construction Services, under Chapter 195-7.1 (G) of the Municipal Code. Reporting back to City Council is required in accordance with Municipal Code Chapter 195, Purchasing Article 7, Section 195-7.4 (B) when a non-competitive contract exceeds $500,000.

Staff recommended

The Chief Engineer and Executive Director, the Engineering and Construction Services and the Chief Procurement Officer, Purchasing and Materials Management recommend that: 1. City Council receive this report for information.

Considered

  • 2023-12-06 · General Government Committee · adopted

    Decision as filed

    The General Government Committee recommend that: 1. City Council receive the report (November 20, 2023) from the Chief Engineer and Executive Director, Engineering and Construction Services and the Chief Procurement Officer, Purchasing and Materials Management for information.

  • 2023-12-13 · Toronto City Council · adopted