Toronto Parking Authority · 2022-12-12 · 2023.PA1.11

The filed record

Contract Award - 5058-41 Garage Restoration at 9 Bedford Road (Car Park 58)

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2022-12-12 · Toronto Parking Authority · adopted

As filed

The Board of Directors of Toronto Parking Authority: 1. Provided authority to the President, Toronto Parking Authority, to award the Construction Contract for the 5058-41 Garage Restoration at 9 Bedford Road (Car Park 58) to Complete Concrete Restoration Ltd., having submitted the lowest compliant bid and meeting all specifications in conformance with the Construction Tender requirements, in the amount of $5,876,500 plus $823,500 as a contingency allowance, being the sum total amount of $6,700,000 excluding Harmonized Sales Tax.

On the agenda

As the city filed it

The Toronto Parking Authority is seeking to obtain board approval to complete extensive concrete repairs at Car Park 58, located at 9 Bedford Road. Subsequent contracts will be tendered for service improvements in later phases of the project development. Car Park 58 was built in 1987 and is a combined surface lot and four (4) level underground parking garage, providing approximately 399 parking spaces total. The underground parking garage is integrated with the Yorkville Royal Sonesta Hotel facing 220 Bloor Street West and shares hotel maintenance rooms residing within the car park.

Show the rest of As the city filed it, 1,860 more characters as filed

Pre-pandemic (2019) gross revenues were $2.8 Million, and it is consistently amongst our top five performers. October year-to-date revenues are $1.85 Million or 67percent of 2019 levels. Although Car Park 58 is one of our top-producing facilities, the current state of good repair has fallen below minimum acceptable standards. Many elements of Car Park 58 exceed their service life. These deficiencies require immediate remediation, as any delay will adversely impact other aspects of the facility (example sub-structure, etc.) Read Christofferson Jones (RJC) was retained by Toronto Parking Authority in July 2021 to perform a condition assessment of the car park, and then undertake design services. RJC's condition assessment notes that the garage is generally in poor condition with local sections of the structure exhibiting signs of distress and corrosion-related deterioration. In addition, the waterproofing systems are at the end-of-service life and should be replaced as soon as possible to limit further concrete deterioration. After a review of the condition assessment, Toronto Parking Authority directed RJC to proceed with the design to complete concrete repairs, wholesale waterproofing and asphalt, drain and sprinkler replacement and conversion to LED lighting These repairs are scheduled to start February 2023. The Request for Tender package for the Garage Restoration package (example concrete repairs) was issued for tender on October 14th, 2022, with eight (8) bids received upon tender close on November 14th, 2022. Based on the submission of a compliant bid, the bid price, ability to complete the work in the prescribed time and the conformance to tender requirements, Management is recommending that the contract of work for 5058-41 Garage Restoration at 9 Bedford Road (Car Park 58) be awarded to Complete Concrete Restoration Ltd.

Staff recommended

The President, Toronto Parking Authority recommends that: 1. The Board of Directors of Toronto Parking Authority provide authority to the President, Toronto Parking Authority, to award the Construction Contract for the 5058-41 Garage Restoration at 9 Bedford Road (Car Park 58) to Complete Concrete Restoration Ltd., having submitted the lowest compliant bid and meeting all specifications in conformance with the Construction

Show the rest of Staff recommended, 163 more characters as filed

Tender requirements, in the amount of $5,876,500 plus $823,500 as a contingency allowance, being the sum total amount of $6,700,000 excluding Harmonized Sales Tax.