717 Church Street, 85, 89, 93 and 97 Collier Street - Construction Staging Area

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2024-05-07 · Toronto and East York Community Council · adopted

As filed

The Toronto and East York Community Council: 1. Authorized the closure of the south sidewalk and a 3 metre wide portion of the eastbound lane on Collier Street, between Church Street and a point 52 metres east, from July 1, 2024 to January 31, 2027, inclusive. 2. Authorized the closure of the north sidewalk on Church Street, between Collier Street and Park Road, from July 1, 2024 to January 31, 2027, inclusive. 3. Designated Collier Street, between a point 28 metres west of Park Road to Church Street, as one-way for westbound traffic only.

Show the rest of As filed, 4,015 more characters as filed

4. Rescinded the existing standing prohibition in effect at all times on both sides of Collier Street, between Church Street and Park Road. 5. Prohibited stopping at all times on both sides of Collier Street, between Church Street and Park Road. 6. Prohibited entry at all times on Collier Street from Church Street. 7. Prohibited northbound right turns from Church Street to Collier Street. 8. Prohibited southbound left turns from Church Street to Collier Street. 9. Rescinded the existing stopping prohibition from 3:30 p.m. to 6:30 p.m., Monday to Friday, on the north side of Church Street between Park Road and a point 31 metres west. 10. Prohibited stopping at all times on the north side of Church Street, between Park Road and a point 31 metres west. 11. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 12. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 13. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 14. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 15. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 16. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 17. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 19. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 20. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 21. Directed the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 22. Directed that Collier Street, and Church Street be returned to its pre-construction traffic and parking regulations when the project is complete. 23. Directed the applicant to cooperate with and provide all necessary assistance to the City engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. C & P Development Limited Partnership is constructing a 27-storey condominium building at 717 Church Street, 85-89 Collier Street, and 93-97 Collier Street. The site is located on the north side of Church Street, between Yonge Street and Bloor Street East, at the intersection of Church Street and Collier Street.

Show the rest of As the city filed it, 500 more characters as filed

Transportation Services is requesting authorization to temporarily close a portion of the eastbound curb lane on Collier Street for a period of 31 months, from July 1, 2024 to January 31, 2027 to accommodate a construction staging area. A temporary one-way westbound conversion on a portion of Collier Street, around the construction staging area is required. In addition, a closure of both the south sidewalk on Collier Street and the north sidewalk on Church Street, fronting the site, is required.

Staff recommended

The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south sidewalk and a 3 metre wide portion of the eastbound lane on Collier Street, between Church Street and a point 52 metres east, from July 1, 2024 to January 31, 2027, inclusive. 2. Toronto and East York Community Council authorize the closure of the north sidewalk on Church Street, between Collier Street and Park Road, from July 1, 2024 to January 31, 2027, inclusive.

Show the rest of Staff recommended, 4,881 more characters as filed

3. Toronto and East York Community Council designate Collier Street, between a point 28 metres west of Park Road to Church Street, as one-way for westbound traffic only. 4. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on both sides of Collier Street, between Church Street and Park Road. 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Collier Street, between Church Street and Park Road. 6. Toronto and East York Community Council prohibit entry at all times on Collier Street from Church Street. 7. Toronto and East York Community Council prohibit northbound right turns from Church Street to Collier Street. 8. Toronto and East York Community Council prohibit southbound left turns from Church Street to Collier Street. 9. Toronto and East York Community Council rescind the existing stopping prohibition from 3:30 p.m. to 6:30 p.m., Monday to Friday, on the north side of Church Street between Park Road and a point 31 metres west. 10. Toronto and East York Community Council prohibit stopping at all times on the north side of Church Street, between Park Road and a point 31 metres west. 11. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 12. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 13. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 14. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 15. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 16. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 17. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 19. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 20. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 21. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 22. Toronto and East York Community Council direct that Collier Street, and Church Street be returned to its pre-construction traffic and parking regulations when the project is complete. 23. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.