The filed record
Electricity and Toronto’s Climate Commitments
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2025-12-04 · Infrastructure and Environment Committee · referred
As filed
The Infrastructure and Environment Committee: 1. Referred item IE26.14 to the Executive Director, Environment, Climate and Forestry for consideration.
The vote
Refer Item · Carried, 4-2
The whole record, all 7 members
- Amber MorleyAgainst
- Anthony PerruzzaAbsent
- Dianne SaxeAgainst
- James PasternakFor
- Mike ColleFor
- Paula FletcherFor
- Rachel Chernos LinFor
Every name opens that member’s record.
On the agenda
As the city filed it
Toronto City Council has recognized that we are in a climate emergency and has committed the city to reach net zero by 2040. These goals cannot be achieved if the electricity supplied to the city by the Independent Electricity System Operator continues to get dirtier and more based on fossil fuels. On June 26 and 27, 2024, by 2024.MM19.9, City Council requested the Independent Electricity System Operator to work with the City of Toronto and Toronto Hydro to align the Integrated Regional Resource Plan for Toronto's electricity system, and broader energy system planning and procurement, with the City's 2040 target of net zero greenhouse gas emissions by: a.
Show the rest of As the city filed it, 1,256 more characters as filed
phasing out gas-fired electricity generation at the Portlands Energy Centre by 2035, except in extreme, exceptional and emergency circumstances totalling less than 88 hours per year; b. rapidly increasing local renewable energy generation and storage, and maximizing cost-effective energy efficiency; c. empowering Toronto Hydro to act as Toronto's electric Distribution System Operator to support development, integration, and utilization of distributed energy resources; and d. supporting a transformed electricity system that supplies Toronto with sufficient reliable, affordable, low-carbon electricity to meet present and future needs, including population growth and the electrification of buildings and transport. The Independent Electricity System Operator has recently proposed a draft twenty year Integrated Regional Resource Plan for Toronto (to 2044) that complies with none of these goals, and is fundamentally incompatible with Toronto's climate commitments. It does not align with Toronto's 2040 target, does not envision the phase out of the Portlands Energy Centre, does not allow for a rapid increase in local renewable energy generation and storage, does not maximize cost-effective energy efficiency, and does not empower Toronto Hydro.
Staff recommended
Councillor Dianne Saxe recommends that: 1. City Council advise the Independent Electricity System Operator that its draft twenty-year Integrated Regional Resource Plan for Toronto is fundamentally incompatible with Toronto's climate commitments and therefore is unacceptable. 2. City Council request the Toronto Hydro Board to propose and cost a plan for electricity supply to the City of Toronto that is aligned with the City's 2040 net zero target, phases out the Portlands gas plant by 2035 (except in extreme, exceptional and emergency circumstances totalling less than 88 hours per year) and aggressively pursues all cost-effective local energy efficiency, renewable energy and storage options.
Show the rest of Staff recommended, 449 more characters as filed
3. City Council request the Auditor General of Ontario to review the impact on Torontonian's energy costs and air quality of the Independent Electricity System Operator's draft Integrated Regional Resource Plan, and whether Torontonians' energy costs and exposure to air pollution could be durably reduced by maximizing local energy conservation / efficiency (negawatts) and local distributed energy resources, including vehicle-to-grid integration.
On the record
More from this meeting
- Presentation from the Chief Communications Officer - Toronto’s Blue Box Transition, Public Awareness and Information MessagingFiled record
- Transition of the Blue Box Program to Extended Producer Responsibility: Preparation for January 2026 CollectionFiled record
- TransformTO Net Zero Strategy: Action Plan (2026-2030)Filed record
- Proposed Parking Signage PilotFiled record
- City of Toronto / Ministry of Transportation of Ontario Agreement for the Maintenance and Operation of Ministry Owned Traffic Control DevicesFiled record
- Cycling Network Plan - 2025 Cycling Infrastructure Fourth Quarter UpdateFiled record