The decision
2025-07-03 · North York Community Council · amended
As filed
North York Community Council: 1. Authorized the closure of the southerly eastbound designated bike lane and a 4.5 metre wide portion of the eastbound curb lane on St. Dennis Drive, between a point 77 metres west of Deauville Lane and a point 125 metres further west, from September 1, 2025 to December 31, 2026 inclusive. 2. Prohibited stopping at all times on the north side of St. Dennis Drive, between a point 65 metres west of Deauville Lane and a point 65 metres further west.
Show the rest of As filed, 3,389 more characters as filed
3. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 5. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists, and motorists' safety is considered at all times. 8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Directed the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the bicycle lanes. 14. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. Directed that the occupation permit for construction staging on St. Dennis Drive be conditional, subject to there being no conflicts with Metrolinx transit project construction. 16. Directed that St. Dennis Drive be returned to its pre-construction traffic and parking regulations when the project is complete.
On the agenda
As the city filed it
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. 25 St Dennis LP is constructing a 12-storey condominium at 25 St. Dennis Drive. The site is located on the south side of St. Dennis Drive, between Don Mills Road and Deauville Lane. Transportation Services is requesting authorization to temporarily close a portion of the eastbound curb lane and eastbound cycle track on St.
Show the rest of As the city filed it, 275 more characters as filed
Dennis Drive for a period of 16 months, from September 1, 2025 to December 31, 2026, in order to enable construction of the above-mentioned development. Pedestrian movements will be maintained in a covered and protected walkway within the existing sidewalk on the south side.
Staff recommended
The Director, Traffic Management, Transportation Services, recommends that: 1. North York Community Council authorize the closure of the southerly eastbound designated bike lane and a 4.5 metre wide portion of the eastbound curb lane on St. Dennis Drive, between Deauville Lane and a point 77 metres west, from September 1, 2025 to December 31, 2026 inclusive. 2. North York Community Council prohibit stopping at all times on the north side of St.
Show the rest of Staff recommended, 3,866 more characters as filed
Dennis Drive, between a point 65 metres west of Deauville Lane and a point 65 metres further west. 3. North York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. North York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 5. North York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. North York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. North York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists, and motorists' safety is considered at all times. 8. North York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. North York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. North York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. North York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. North York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. North York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the bicycle lanes. 14. North York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. North York Community Council direct that the occupation permit for construction staging on St. Dennis Drive be conditional, subject to there being no conflicts with Metrolinx transit project construction. 16. North York Community Council direct that St. Dennis Drive be returned to its pre-construction traffic and parking regulations when the project is complete.
On the record
More from this meeting
- 369 Soudan Avenue - Application for Fence ExemptionFiled record
- 47 Stadacona Drive and 22, 24, 26 and 28 Richelieu Road - Zoning By-law Amendment - Decision Report - ApprovalFiled record
- 47 Stadacona Drive and 22, 24, 26 and 28 Richlieu Road - Rental Housing Demolition Application - Decision Report - ApprovalFiled record
- 123 Garratt Boulevard (Taxiway West District) - Zoning By-law Amendment - Decision Report - ApprovalFiled record
- 123 Garratt Boulevard - Inclusion on the Heritage RegisterFiled record
- 2674-2704 Yonge Street and 19 Alexandra Boulevard - Official Plan Amendment and Zoning By-law Amendment - Decision Report - ApprovalFiled record