The filed record
It’s Time to Reinstate Cummer Station for the North York Centre - by Councillor Lily Cheng, seconded by Councillor Jamaal Myers
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2026-05-20 · Toronto City Council · received
As filed
City Council on May 20 and 21, 2026, received Item DM41.4 for information.
The vote
Receive Item · Carried, 23-0
The whole record, all 26 members
- Alejandra BravoFor
- Amber MorleyFor
- Anthony PerruzzaFor
- Ausma MalikFor
- Brad BradfordFor
- Chris MoiseFor
- Dianne SaxeFor
- Frances NunziataFor
- Gord PerksFor
- Jamaal MyersFor
- James PasternakFor
- Jon BurnsideFor
- Josh MatlowFor
- Lily ChengFor
- Michael ThompsonFor
- Mike ColleConflict declared
- Neethan ShanFor
- Nick MantasFor
- Olivia ChowFor
- Parthi KandavelFor
- Paul AinslieAbsent
- Paula FletcherFor
- Rachel Chernos LinFor
- Shelley CarrollFor
- Stephen HolydayFor
- Vincent CrisantiAbsent
Every name opens that member’s record.
On the agenda
As the city filed it
Work on the Yonge North Subway Extension is now underway, with key design and alignment decisions actively advancing. At the same time, the City of Toronto is progressing the North York Centre Secondary Plan (Phase 3), which contemplates the addition of 100,000 new residents in the area. This growth builds on the significant intensification already planned under the Yonge North Secondary Plan. Together, these plans confirm that the Yonge Street corridor between Finch and Steeles is one of the most rapidly intensifying urban areas in the Greater Toronto Area.
Show the rest of As the city filed it, 3,795 more characters as filed
This motion is informed by previous City of Toronto staff analysis and Council direction, including the December 2023 " Cummer Station - Supplemental Report " (Background File 241560), which assessed the inclusion of Cummer Station within the Yonge North Subway Extension and confirmed the technical and planning implications of the current alignment. The current alignment of the Yonge North Subway Extension excludes a station at Cummer Avenue. This omission results in a notably long station spacing of approximately 2 km between Finch and Steeles, which is atypical for a high-density urban context and inconsistent with established Toronto Transit Commission network patterns. In comparison, downtown Line 1 stations such as King, Queen, Dundas, College, and Wellesley are spaced at approximately 500-700 metres, reflecting a planning approach that prioritizes accessibility and walkable station catchments in dense urban environments. Once construction proceeds beyond a certain point, the opportunity to incorporate a future Cummer Station will become increasingly cost-prohibitive and technically complex. The current design, including track profile considerations that are not flat through this segment, risks making future station insertion at this location practically infeasible without major disruption, including potential multi-year shutdowns of the line. City modelling indicates that the current five-station extension is projected to serve approximately 94,000 daily riders, while a station at Cummer alone is forecast to accommodate over 23,000 daily boardings by 2051. This level of ridership is comparable to several existing Toronto Transit Commission subway stations and demonstrates that Cummer would function as a major node within the network, rather than a marginal stop. The case for reinstating Cummer Station is grounded in several key considerations: High Ridership Potential: City forecasts indicate Cummer Station would exceed projected ridership levels of approved stations such as Clark and Royal Orchard. Active Development and Growth: The surrounding area is designated for significant intensification, with planned densities of approximately 249 people and jobs per hectare by 2051, exceeding typical Major Transit Station Area targets. Future-Proofing and Infill Potential: As demonstrated by the historical addition of North York Centre Station to Line 1, strategic infill stations can be successfully integrated to better serve evolving urban form and demand. Constructing Cummer Station now would avoid substantially higher costs and future disruption. Local Connectivity: The station would directly serve multiple secondary schools, including Drewry Secondary School, École secondaire catholique Monseigneur-de-Charbonnel, and Avondale Secondary Alternative School, while improving access to the 97 Yonge bus corridor. High Future Risk: Delaying consideration of this station risks necessitating full or partial shutdown of the Yonge North Subway Extension for extended periods if a station is added post-construction, as identified in City technical discussions. As construction proceeds, nearby communities will inevitably experience significant disruption. While such impacts are inherent to major infrastructure delivery, they must be balanced with meaningful local benefits. Incorporating Cummer Station would help ensure that the corridor directly benefits from the substantial investment being made, while improving overall network utility and accessibility. In light of these considerations, reinstating Cummer Station represents sound planning, improved network efficiency, and a commitment to equitable transit investment that aligns infrastructure with the scale of growth already planned and underway along the Yonge Street corridor.
Staff recommended
Councillor Lily Cheng, seconded by Councillor Jamaal Myers, recommends that: 1. City Council request the Federal and Provincial governments to consider funding the previously descoped Cummer Station to ensure transit infrastructure can support the current and projected density in the North York Centre Secondary Plan and Yonge North Secondary Plan, noting that these areas will experience significantly higher density than any other stations on the Yonge North Subway Extension outside of Toronto.
On the record
More from this meeting
- Introduction of General Bills and Confirming BillsFiled record
- Making it Easier to Build More Housing: Extending Development Charge Incentives to Condominium Multiplexes and Engaging on the Review of the Ontario Building CodeFiled record
- Payment of Legal Expenses Related to an Integrity Commissioner InvestigationFiled record
- SmartTrack InvoicingFiled record
- Authorization to Release Section 37 Funds for the Common Table - by Councillor Dianne Saxe, seconded by Councillor Mike ColleFiled record
- Call to OrderFiled record