The filed record
137 Bond Street - Construction Staging Area
The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.
The decision
2026-02-19 · Toronto and East York Community Council · amended
As filed
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 5.3 metre wide portion of the northbound curb lane on Bond Street, between Gould Street and a point 38.5 metres south, and provision of a temporary pedestrian walkway within the closed portion of the northbound lane, from February 20, 2026 to June 30, 2027 inclusive. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m.
Show the rest of As filed, 4,460 more characters as filed
to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday at a rate of $6.75 per hour and for a maximum of 3 hours, on the west side of Bond Street, between Gould Street and a point 45 metres south. 3. Prohibited stopping at all times on the west side of Bond Street, between Gould Street and a point 45 metres south. 4. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 6. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 8. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Directed the applicant to include a minimum of 75 percent of advertisement surface area on the construction hoarding to be allocated to artwork with adequate spotlighting at their sole cost; design is to be reviewed and approved by the local Ward Councillor. 14. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. Directed the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 16. Directed that Bond Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is complete. 17. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 18. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 19. Directed the applicant to e mail monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management.
On the agenda
As the city filed it
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Pomerleau Inc. is constructing an 8-storey facility for the Toronto Metropolitan University (TMU) Student Centre at 137 Bond Street. The site is located on the southeast corner of Bond Street and Gould Street. Transportation Services is requesting authorization to temporarily close the east sidewalk and a portion of the northbound lane on Bond Street for a period of 17 months, from February 20, 2026 to June 30, 2027, in order to enable construction staging operations for the project.
Show the rest of As the city filed it, 294 more characters as filed
Pedestrians will be redirected into a 1.5 metre wide covered and protected walkway within the closed portion of the northbound lane on the east side of Bond Street. On Gould Street, pedestrians will be redirected into a 1.5 metre wide covered and protected walkway within the existing sidewalk.
Staff recommended
The Director, Congestion and Network Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 5.3 metre wide portion of the northbound curb lane on Bond Street, between Gould Street and a point 38.5 metres south, and provision of a temporary pedestrian walkway within the closed portion of the northbound lane, from February 20, 2026 to June 30, 2027 inclusive.
Show the rest of Staff recommended, 4,205 more characters as filed
2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday at a rate of $6.75 per hour and for a maximum of 3 hours, on the west side of Bond Street, between Gould Street and a point 45 metres south. 3. Toronto and East York Community Council prohibit stopping at all times on the west side of Bond Street, between Gould Street and a point 45 metres south. 4. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 6. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 16. Toronto and East York Community Council direct that Bond Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is complete.
On the record
More from this meeting
- Naming of a Proposed Private Street Within the Alexandra Park Revitalization AreaFiled record
- Naming of a Proposed Public Street for a Development at 215 Lake Shore Boulevard EastFiled record
- Permanent Closure of Part of the Public Laneway Abutting 1684-1702 Queen Street EastFiled record
- 2004-2008 Bathurst Street - Official Plan and Zoning By-law Amendment Application - Decision Report - ApprovalFiled record
- 2004, 2006 and 2008 Bathurst Street - Rental Housing Demolition Application - Decision Report - ApprovalFiled record
- 509 Parliament Street - Zoning By-law Amendment Application - Decision Report - ApprovalFiled record