The decision

2026-04-01 · Toronto and East York Community Council · adopted

As filed

The Toronto and East York Community Council: 1. Authorized the closure of the south sidewalk and a 2.6 metre wide portion of the eastbound curb lane on Balliol Street, between a point 29 metres west of Mount Pleasant Road and a point 34 metres further west, and a provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from April 2, 2026 to June 30, 2027, inclusive. 2. Rescinded the existing parking prohibition in effect at all times on the south side of Balliol Street, between Mount Pleasant Road and a point 77 metres west.

Show the rest of As filed, 3,264 more characters as filed

3. Prohibited stopping at all times on the south side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 4. Rescinded the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday on the north side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 5. Prohibited stopping at all times on the north side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 6. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 8. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 17. Directed that Balliol Street be returned to its pre-construction traffic and parking regulations when the project is complete.

On the agenda

As the city filed it

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Menkes Balliol Inc. is constructing a 31-storey residential rental building at 289-299 Balliol Street. The site is located on the south side of Balliol Street, between Mount Pleasant Road and Pailton Crescent. Transportation Services is requesting authorization to temporarily close a portion of the eastbound curb lane and the south sidewalk on Balliol Street for a period of 15 months, from April 2, 2026 to June 30, 2027, in order to enable construction staging operations for the development.

Show the rest of As the city filed it, 167 more characters as filed

Pedestrians will be redirected into a 2.1 metre wide covered and protected walkway within the closed portion of the eastbound lane on the south side of Balliol Street.

Staff recommended

The Director, Congestion and Network Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south sidewalk and a 2.6 metre wide portion of the eastbound curb lane on Balliol Street, between a point 29 metres west of Mount Pleasant Road and a point 34 metres further west, and a provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from April 2, 2026 to June 30, 2027, inclusive.

Show the rest of Staff recommended, 3,970 more characters as filed

2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the south side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 3. Toronto and East York Community Council prohibit stopping at all times on the south side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 4. Toronto and East York Community Council rescind the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday on the north side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 5. Toronto and East York Community Council prohibit stopping at all times on the north side of Balliol Street, between Mount Pleasant Road and a point 77 metres west. 6. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 8. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 17. Toronto and East York Community Council direct that Balliol Street be returned to its pre-construction traffic and parking regulations when the project is complete.