housing
420-444 Yonge and 1-23 College Street; demolition of 210 rental units and approval of replacement with 216 units in mixed-use tower
City Council staff recommend approving the demolition of 210 rental apartments at the Yonge-College site and replacement with 216 rental units in a 65-storey mixed-use building. The decision includes a Tenant Assistance Plan requiring similar rents and financial compensation, but a current tenant raised concerns about the five-plus year displacement period for elderly and vulnerable residents with chronic health conditions, the extended timeline, and the lack of consultation with the city and council during design.
From the floor
“I'm a tenant in the building. I like the idea, but building three high-rise buildings with them expecting us to live for 5 years and probably a lot longer somewhere else when a lot of us have memory problems, dementia, Alzheimer's, heart problems, and multiple other problems.”A resident
“I think that if they build the last time they told us they everything would be built by the year 2030. Now they're saying we move out by 2032 and that it can take 5 years or more when we move out to move back in. If we have problems finding our way around Toronto, just for myself, Eaton's the Eaton wing of Toronto General Hospital, couple of blocks away is very difficult for me to go to. Where am I going to live?”A resident
“I think that they have to build one building at a time and pull down our building at the end. So, we get to move in. When a person chooses a home, they choose the number of cabinets they want, the number of closets they want, everything what they want. We're going to have to take what they give us when we move in.”A resident
“I think that we have to have more meetings with the city, the councelor council, I mean, and the developer and their architects.”A resident
Also in this item
• Timeline slippage reported by tenant: original promise was completion by 2030; current plan now states tenants move out by 2032 with 5+ years possible for move-back, extending total displacement to 2037 or later for some residents.
• Tenant expressed that the current building has only 3 elevators for 10 floors; the replacement 65-storey building will have approximately 8 elevators for 65 floors, raising questions about service adequacy and repair downtime in the larger building.
The journey
Time to act
You can weigh in
This item appears to have been decided at the committee stage with no stated outstanding window. If the matter proceeds to City Council for final approval, residents and tenant advocates may depute at that stage. Current tenant concerns about timeline and design consultation could be raised in writing to the ward councillor or at council if the item is not yet final.
Decision
Staff recommendation to approve the Rental Housing Demolition application and the Residential Demolition Permit under Chapter 363, subject to conditions. The approval permits demolition of 210 rental units and construction of a replacement 216-unit rental component within the first phase of a mixed-use development including 65-, 75-, and 96-storey buildings with 2,342 total units, 43,000 square metres of commercial space, 19,373 square metres of hotel space, 5,527 square metres of cultural space, and 600 square metres of new parkland.
On video
Jump to this item in the meeting video
Why is this story here?
Stories are ordered by how much weight a decision carries and how directly it reaches daily life. They rise as a decision date approaches and fall as they age.