The Public GalleryToronto

Toronto City Council · 2026-07-29 · 2026.TE34.45

housing

36-storey tower approved at Wellesley and Church; 65 rental units to be replaced

City Council will be asked to approve a 36-storey mixed-use building with 409 units (including 65 replacement rental units) at Wellesley Street East and Church Street, contingent on the city upgrading the Swansea pumping station to handle wastewater capacity. The vote marks the end of a major application process for a prominent downtown site, with a tenant assistance plan for existing renters and heritage considerations still to be reviewed separately.

not yet heardToronto City Council · Wed, Jul 29You can weigh in

From the floor

We have considered all of them. the application included a detailed traffic study prepared by Lee Consulting which was reviewed by staff and no outstanding con concerns remain from a traffic perspective.City staff
That is a related to the Swansea pumping station and capacity at that station and to deal with that capacity issue. We are proposing and our staff have proposed and we are accepting of a holding provision that would require the city to undertake work related to that public station to ensure that there is sufficient capacity prior to the application being able to be brought forward.City staff
There is a community benefit contribution as part of this application which is a expanded section 37 in the form of additional public art on the site.City staff

Also in this item

A wastewater holding provision: the city must upgrade Swansea pumping station capacity before zoning can be exercised, meaning the applicant cannot build unless the city completes infrastructure work

65 existing rental units will be demolished and replaced at similar rents; tenants have a right to return under a Tenant Assistance Plan

Heritage alterations to the designated heritage property at 64 Wellesley Street East remain to be decided separately by City Council

The journey

Wed, Jul 29 · Toronto City Council · not yet heard

Time to act

You can weigh in

This decision report goes to City Council for final approval. Residents who wish to express support or objection to the development, or to the holding provision on pumping station capacity, or to the heritage alterations may depute at the Council meeting or contact their councillor before the vote. The timeline for that Council meeting is not stated in the transcript.

Decision

The recommendation is approval of amendments to the Official Plan and Zoning By-law to permit a 36-storey building (122.5 metres including mechanical penthouse) with 409 dwelling units and 852 square metres of non-residential gross floor area. Approval is contingent on a holding provision requiring the city to complete upgrades to the Swansea pumping station to ensure sufficient wastewater capacity before zoning permissions can be exercised. The applicant proposes to acquire and demolish Dapper Lane as part of the development. A related rental housing demolition application and heritage alterations report will be considered by City Council in a separate process.

On video

Jump to this item in the meeting video

Why is this story here?
Big deal at city hallA 36-storey tower is a permanent addition to the skyline and streetscape, requires amendment of the Official Plan (removal of a no-tall-building policy in the Wellesley Wood Character Area), introduces 409 new households to the area, and displaces 65 existing rental units. The holding provision on wastewater infrastructure is a meaningful constraint on future development sequencing. This is hard to reverse (site is permanently rezoned) and touches many people at once (residents of 409 units, 65 displaced tenants, neighbourhood users). Not structural in the sense of closing doors for future councils, but a multi-year commitment and a change to what a site can be. Stakes 2 test: undoing this costs real money, time, or political capital, yes, rezoning is not easily undone.Felt nowThis touches daily life directly for 65 current renters who must navigate displacement and re-housing, and for 409 future residents who will occupy the building. It affects the downtown streetscape and public realm (lane closure, public art). It touches the broader neighbourhood through traffic, school capacity, and utility systems. However, the current-week effect is on the 65 tenants facing displacement; the 409 future residents have not yet moved. A recognizable group feels this now. Salience 2 test: can you name the person this happens to? Yes, the tenants in the existing rental units. Would they notice without being told? Yes, a displacement notice. This is not Salience 3 because the 409 new residents are future, and the neighbourhood capacity effects are diffuse.

Stories are ordered by how much weight a decision carries and how directly it reaches daily life. They rise as a decision date approaches and fall as they age.

Share this

Official title: 64-66 Wellesley Street East and 552-570 Church Street - Official Plan and Zoning By-law Amendment Application - Decision Report - Approval · meeting video