TE25.26amended
31 Winnifred Avenue - Application for Fence Exemption
The Applicant for 31 Winnifred Avenue has requested Toronto and East York Community Council to exempt their property from the following by-law requirements: City of Toronto Municipal Code Chapter -1.2B(1) B. Fence height. (1) No fence described in the following Table shall, when measured at any point along its length from the average grade level measured perpendicular to and one meter away on either side of the fence, exceed the height set out in the Table for the fence. The Applicant for 31 Winnifred Avenue is requesting an exemption for their; - Existing fence located in the rear yard, abutting a laneway. - Consistent/Average height of 2.743 metres. - Constructed with pressure treated wood and clad with metal shielding. - Maximum height permitted is 2.5 metres. - A pressure treated wood and metal shield barrier/roll up door, measuring at 2.743 metres in height, and permanent posts located on each end of barrier. Municipal Licensing and Standards Division has inspected the subject property and issued a notice of violation of City of Toronto Municipal Code Chapter 447 - 2B(1).
The Toronto and East York Community Council: 1. Granted the application for a fence exemption to the property owner of 31 Winnifred Avenue, thereby allowing the existing fences to be maintained as constructed. 2. Directed that at such time when a replacement of the fence is required that such installation will comply with Municipal Code Chapter 447, Fences or its successor by-law.
Staff recommendation as filed
The District Manager, Municipal Licensing and Standards, Central District recommends that that Toronto and East York Community Council pursuant to City of Toronto Municipal Code Fences Chapter 447-1.5 B: 1. Refuse to grant an exemption to Chapter 447, Fences, to the property owner of 31 Winnifred Avenue, for the existing fence described in the Summary of this report.
TE25.27amended
20 Berkshire Avenue - Application for Fence Exemption
The Applicant for 20 Berkshire Ave. has requested Toronto and East York Community Council to exempt their property from the following by-law requirements: City of Toronto Municipal Code Chapter 447-1.2B(1): B. Fence height. (1) No fence described in the following Table shall, when measured at any point along its length from the average grade level measured perpendicular to and one meter away on either side of the fence, exceed the height set out in the Table for the fence. The Applicant for 20 Berkshire Ave. is requesting an exemption for their; - Existing wooden board on board fence - Consistent height of 2.47 metres and length of 1.85 metres. - Constructed with extruded aluminum posts and horizontal cedar boards.
The Toronto and East York Community Council: 1. Granted the application for a fence exemption to the property owner of 20 Berkshire Avenue, thereby allowing the existing fences to be maintained as constructed. 2. Directed that at such time when a replacement of the fence is required that such installation will comply with Municipal Code Chapter 447, Fences or its successor by-law.
Staff recommendation as filed
The South District Manager, Municipal Licensing and Standards, recommends that Toronto and East York Community Council pursuant to City of Toronto Municipal Code Fences Chapter 447-1.5 B: 1. Refuse to grant an exemption to Chapter 447, Fences, to the property owner of 20 Berkshire Avenue, for the existing fence described in the Summary of this report.
TE25.28amended
104 Seaton Street - Application for Fence Exemption
The Applicant for 104 Seaton St. has requested Toronto and East York Community Council to exempt their property from the following by-law requirements: City of Toronto Municipal Code Chapter 447-1.2B(1): B. Fence height. (1) No fence described in the following Table shall, when measured at any point along its length from the average grade level measured perpendicular to and one meter away on either side of the fence, exceed the height set out in the Table for the fence. The Applicant for 104 Seaton St. is requesting an exemption for their; - Existing linear wooden fence on the southern lot line of the rear yard - Southeastern section (closest to the house) has a measured height of 3.15m for a length of 7.31m - southwestern section (closest to the rear property line) has a measured height of 2.22m for a length of 4.87m. - Maximum height permitted is 2m. Municipal Licensing and Standards Division, due to a separate inspection being conducted, created a pro-active complaint file on November 27th, 2023. The investigation resulted with the subject property owner submitting a fence exemption application on December 18, 2023.
The Toronto and East York Community Council: 1. Granted the application for a fence exemption to the property owner of 104 Seaton Street, thereby allowing the existing fences to be maintained as constructed. 2. Directed that at such time when a replacement of the fence is required that such installation will comply with Municipal Code Chapter 447, Fences or its successor by-law.
Staff recommendation as filed
The South District Manager, Municipal Licensing and Standards, recommends that Toronto and East York Community Council pursuant to City of Toronto Municipal Code Fences Chapter 447-1.5 B: 1. Refuse to grant an exemption to Chapter 447, Fences, to the property owner of 104 Seaton Street, for the proposed fence described in the Summary of this report.
TE25.29deferred indefinitely
Application for a Sidewalk Cafe Permit Located at 1161 Queen Street East, Berkshire Avenue flankage
The purpose of this staff report is to report on the application to issue a permit by Municipal Licensing and Standards in the matter of an application for a Sidewalk Café permit located at 1161 Queen Street East, Berkshire Avenue flankage.
The Toronto and East York Community Council deferred consideration of the Item indefinitely.
Staff recommendation as filed
The Director, Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. Toronto and East York Community Council deny the application for the proposed Sidewalk Café permit located at 1161 Queen Street East, Berkshire Avenue flankage. OR 2. Toronto and East York Community Council approve the application for the proposed Sidewalk Cafe permit located at 1161 Queen Street East, Berkshire Avenue flankage.
TE25.30deferred
Application for a Sidewalk Cafe Permit Located at 561 Danforth Avenue, Carlaw Avenue flankage
The purpose of this staff report is to address the application submitted to Municipal Licensing and Standards in the matter of an application for a Sidewalk Café permit at 561 Danforth Avenue, Carlaw Avenue flankage.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the November 27, 2025 meeting of the Toronto and East York Community Council to allow for a site visit to be organized through the local Councillor with all interested parties including Holy Name School.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. Toronto and East York Community Council deny the application for the proposed Sidewalk Café permit located at 561 Danforth Avenue, Carlaw Avenue flankage. OR 2. Toronto and East York Community Council approve the application for the proposed Sidewalk Cafe permit located at 561 Danforth Avenue, Carlaw Avenue flankage.
TE25.31adopted
Changes to Business Improvement Area Boards of Management
Toronto and East York Community Council has delegated authority to appoint and remove directors from the boards of Business Improvement Areas (BIAs) that fall within its geographic boundaries. The purpose of this report is to make changes to the Broadview Danforth, Danforth Mosaic, Korea Town and West Queen West BIA Boards of Management, in accordance with the requirement of City of Toronto Municipal Code Chapter 19, Business Improvement Areas.
The Toronto and East York Community Council: 1. Appointed, in accordance with the City's Public Appointments Policy, the following nominees to the Business Improvement Area Boards of Management set out below, at pleasure of Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Korea Town: - Huy, Bui West Queen West: - Crane, Shannon - Tammagen, Walker 2. Removed the following directors from the Business Improvement Area Boards of Management set out below: Broadview Danforth: - Carrel, Toby Danforth Mosaic: - Borch, Natalie
Staff recommendation as filed
The General Manager, Economic Development and Culture recommends that Toronto and East York Community Council: 1. In accordance with the City's Public Appointments Policy, appoint the following nominees to the Business Improvement Area Boards of Management set out below at the pleasure of Toronto and East York Community Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Korea Town: Huy, Bui West Queen West: Crane, Shannon Tammagen, Walker 2. Remove the following directors from the Business Improvement Area Boards of Management set out below: Broadview Danforth: Carrel, Toby Danforth Mosaic: Borch, Natalie
TE25.32adopted
Naming the East Bayfront Community Recreation Centre
This report responds to City Council's directive to initiate an Indigenous naming process for the new East Bayfront Community Recreation Centre at 261 Queens Quay E. The City, in collaboration with the Mississauga's of the Credit First Nation (MCFN) and urban Indigenous communities is undertaking a culturally respectful process to identify a meaningful Indigenous name rooted in community relationships and the spirit of the site. A final naming recommendation will be brought forward following engagement which will be followed by installation of new signage and ongoing interpretive actions to support understanding of the name's meaning and significance.
The Toronto and East York Community Council: 1. Received the report (August 15, 2025) from the Interim General Manager, Parks and Recreation for information.
Staff recommendation as filed
The Interim General Manager, Parks and Recreation recommends that: 1. Toronto and East York Community Council receive this report for information.
TE25.33adopted
Temple Avenue (Phase 1) - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. LCG Residential Builders Ltd. is constructing a 16-storey residential building at 2-24 Temple Avenue. The site is located on the northwest corner of Dufferin Street and Temple Avenue. The project will be undertaken in two phases, each requiring varying closures, and traffic and parking by-law amendments. This report pertains to Phase 1 of the project, with recommendations that will be required until the end of the project. Moreover, there are no proposed construction staging areas during this phase, only traffic and parking by-law amendments. Phase 2 involves the long term occupation of the public right-of-way and is expected to occur in Q2 2026; thus, a subsequent report will be submitted in advance of the work. Access to the site will be established on the north side of Temple Avenue and west side of Dufferin Street. Temple Avenue operates as a one-way westbound operation forcing vehicles egressing the site to travel through the neighbourhood. To avoid traffic infiltration, it is recommended that a section of Temple Avenue be temporarily converted from a one-way westbound operation to a temporary two-way operation, between Dufferin Street and a point 73 metres west, for a period of 34 months from September 30, 2025 to July 31, 2028. This recommendation will result in the removal of six on-street permit parking spaces. There is sufficient permit parking inventory in the area, therefore these spaces will not adversely impact permit holders.
The Toronto and East York Community Council: 1. Rescinded the existing one-way, westbound traffic designation on Temple Avenue, between Dufferin Street and a point 73 metres west, from September 30, 2025 to July 31, 2028, inclusive. 2. Rescinded the existing parking prohibition in effect at all times, on the north side of Temple Avenue, between Dufferin Street and a point 73 metres west. 3. Rescinded the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., on the south side of Temple Avenue, between Dufferin Street and a point 73 metres west. 4. Rescinded the existing permit parking on the odd side of Temple Avenue, between Dufferin Street and a point 73 metres west, from 12:01 a.m. to 7:00 a.m. at all times. 5. Prohibited stopping at all times on both sides of Temple Avenue, between Dufferin Street and a point 73 metres west. 6. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 8. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Directed that the occupation permit for construction staging on Temple Avenue be conditional, subject to there being no conflicts with Metrolinx transit project construction. 16. Directed that Temple Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing one-way, westbound traffic designation on Temple Avenue, between Dufferin Street and a point 73 metres west, from September 30, 2025 to July 31, 2028, inclusive. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the north side of Temple Avenue, between Dufferin Street and a point 73 metres west. 3. Toronto and East York Community Council rescind the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., on the south side of Temple Avenue, between Dufferin Street and a point 73 metres west. 4. Toronto and East York Community Council rescind the existing permit parking on the odd side of Temple Avenue, between Dufferin Street and a point 73 metres west, from 12:01 a.m. to 7:00 a.m. at all times. 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Temple Avenue, between Dufferin Street and a point 73 metres west. 6. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 8. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Toronto and East York Community Council direct that the occupation permit for construction staging on Temple Avenue be conditional, subject to there being no conflicts with Metrolinx transit project construction. 16. Toronto and East York Community Council direct that Temple Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.34adopted
170 Roehampton Avenue - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. 170R Corporation is constructing a 50-storey residential rental building at 170 Roehampton Avenue. The site is located on the northwest corner of Roehampton Avenue and Redpath Avenue. Transportation Services is requesting authorization to temporarily close the north sidewalk and a portion of the eastbound curb lane on Roehampton Avenue; and the west sidewalk and a portion of the southbound curb lane on Redpath Avenue for a period of 32 months, from September 19, 2025 to April 30, 2028, in order to facilitate construction staging operations. Pedestrian movements around the construction staging areas on Roehampton Avenue and Redpath Avenue will be maintained within the closed portion of the respective lane closures. At the time of this report, the developer has reached a critical point in the construction schedule that requires the immediate installation of the construction staging area to avoid delays to the project. As such, a 30 day permit has been issued to allow the developer to establish the construction staging area in advance of the Toronto and East York Community Council meeting.
The Toronto and East York Community Council: 1. Authorized the closure of the north sidewalk and a 3.3 metre wide portion of the eastbound curb lane on Roehampton Avenue, between Redpath Avenue and a point 56 metres west, with the provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from September 19, 2025 to April 30, 2028, inclusive. 2. Authorized the closure of the west sidewalk and a 1.4 metre wide portion of the of the southbound curb lane on Redpath Avenue, between Roehampton Avenue and a point 41 metres north, with the provision of a temporary pedestrian walkway within the closed portion of the southbound curb lane, from September 19, 2025 to April 30, 2028, inclusive. 3. Rescinded the existing parking prohibition at all times on the south side of Roehampton Avenue, between Redpath Avenue and a point 30.5 metres west. 4. Prohibited stopping at all times on the south side of Roehampton Avenue, between Redpath Avenue and a point 66.5 metres west. 5. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 7. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 9. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 16. Directed the applicant to undertake a full lane grind and pave on Redpath Avenue, should the new pavement be impacted as a result of streetscaping or any other construction activity related to the development. 17. Directed the applicant to provide monthly community meetings to discuss any concerns raised by the community. 18. Directed that the occupation permit for construction staging on Roehampton Avenue and Redpath Avenue be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Directed that Roehampton Avenue and Redpath Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the north sidewalk and a 3.3 metre wide portion of the eastbound curb lane on Roehampton Avenue, between Redpath Avenue and a point 56 metres west, with the provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from September 19, 2025 to April 30, 2028, inclusive. 2. Toronto and East York Community Council authorize the closure of the west sidewalk and a 1.4 metre wide portion of the of the southbound curb lane on Redpath Avenue, between Roehampton Avenue and a point 41 metres north, with the provision of a temporary pedestrian walkway within the closed portion of the southbound curb lane, from September 19, 2025 to April 30, 2028, inclusive. 3. Toronto and East York Community Council rescind the existing parking prohibition at all times on the south side of Roehampton Avenue, between Redpath Avenue and a point 30.5 metres west. 4. Toronto and East York Community prohibit stopping at all times on the south side of Roehampton Avenue, between Redpath Avenue and a point 66.5 metres west. 5. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 7. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 16. Toronto and East York Community Council direct the applicant to undertake a full lane grind and pave on Redpath Avenue, should the new pavement be impacted as a result of streetscaping or any other construction activity related to the development. 17. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 18. Toronto and East York Community Council direct that the occupation permit for construction staging on Roehampton Avenue and Redpath Avenue be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Toronto and East York Community Council direct that Roehampton Avenue and Redpath Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.35amended
Dalhousie Street (241 Church Street) - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Graywood CD Limited Partnership is constructing a 53-storey residential building at 241 Church Street. The site is located on the northeast corner of Church Street and Dundas Street East. Currently, a 4.6 metre wide portion of the west curb lane and sidewalk on Dalhousie Street is closed for construction staging operations. With the construction staging area in place, the remaining road width is 4.5 metres, which is insufficient for two-way traffic operations. Consequently, the two-way operations have been temporarily converted to a one-way northbound operation. In addition, the construction staging area encompasses the west sidewalk, therefore pedestrian movements are restricted. Advance advisory warning signage has been installed to inform pedestrians to cross to the other side of the roadway. It should be noted that the construction staging area has been installed and is operating under a monthly Street Occupation Permit. Transportation Services is requesting to formalize the above noted closures and traffic amendments on Dalhousie Street. The developer has requested the subject construction staging areas for a period of 33 months, from September 19, 2025 to May 30, 2028.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk and a 4.6 metre wide portion of the southbound curb lane on Dalhousie Street, between Dundas Street East and a point 45 metres north, from September 19, 2025 to February 31, 2027 inclusive. 2. Designated Dalhousie Street, between Dundas Street East and a point 54 metres north, as one-way for northbound traffic only. 3. Rescinded the existing maximum fifteen minute parking regulation in effect at all times, on the east side of Dalhousie Street, between a point 9 metres north of Dundas Street East and a point 11 metres further north. 4. Prohibited stopping at all times on the east side of Dalhousie Street, between a point 9 metres north of Dundas Street East and a point 11 metres further north. 5. Rescinded the existing compulsory stop on Dalhousie Street at the intersection of Dalhousie Street and Dundas Street East. 6. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 8. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Directed the applicant to include a minimum of 75 percent of advertisement surface area on the construction hoarding which is to be allocated to artwork with adequate spotlighting at their sole cost; design is to be reviewed and approved by the local Ward Councillor. 16. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 17. Directed the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Building, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 18. Directed that the occupation permit for construction staging on Dalhousie Street be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Directed that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 20. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 22. Directed the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclists to safely share the road. 23. Directed the applicant to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk and a 4.6 metre wide portion of the southbound curb lane on Dalhousie Street, between Dundas Street East and a point 45 metres north, from September 19, 2025 to May 30, 2028 inclusive. 2. Toronto and East York Community Council designate Dalhousie Street, between Dundas Street East and a point 54 metres north, as one-way for northbound traffic only. 3. Toronto and East York Community Council rescind the existing maximum fifteen minute parking regulation in effect at all times, on the east side of Dalhousie Street, between a point 9 metres north of Dundas Street East and a point 11 metres further north. 4. Toronto and East York Community Council prohibit stopping at all times on the east side of Dalhousie Street, between a point 9 metres north of Dundas Street East and a point 11 metres further north. 5. Toronto and East York Community Council rescind the existing compulsory stop on Dalhousie Street at the intersection of Dalhousie Street and Dundas Street East. 6. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 8. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 17. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 18. Toronto and East York Community Council direct that the occupation permit for construction staging on Dalhousie Street be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Toronto and East York Community Council direct that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.36amended
60 Queen Street East - Construction Staging Area Time Extension
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Deltera Inc. has undertaken the construction of a 57-storey mixed use building at 60 Queen Street East. The site is located on the northwest corner of Queen Street East and Dalhousie Street. At its meeting of November 15, 2023, Toronto and East York Community Council authorized the temporary closure of the west sidewalk and a 4.2 metre wide portion of the southbound lane on Dalhousie Street, from November 16, 2023 to December 31, 2024, to facilitate construction staging operations. At the time of this report, the below grade construction is underway. The next phase of construction will require a larger footprint to accommodate a material hoist and additional equipment. As a result, the occupation on the west curb lane on Dalhousie Street will increase from 4.2 metres to 5.5 metres. Pedestrian movements on the west sidewalk will continue to be restricted. The appropriate sidewalk closure signage is installed to inform pedestrians to cross to the other side of the roadway. Transportation Services is requesting authorization to extend the time duration of the construction staging area on Dalhousie Street for an additional 37 months, from September 19, 2025, to September 30, 2028, to allow for the construction of the development to be completed.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk and a 5.5 metre wide portion of the southbound on Dalhousie Street, between Queen Street East and a point 33 metres north, from September 19, 2025 to February 31, 2027, inclusive. 2. Directed the applicant to continue to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 3. Directed the applicant to continue to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 4. Directed the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. Directed the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 6. Directed the applicant to continue to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. Directed the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Directed the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 10. Directed the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Directed the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Directed the applicant, in consultation with Transportation Services, to continue to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 13. Directed that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. Directed that the occupation permit for construction staging on Dalhousie Street continue to be conditional, subject to there being no conflicts with Metrolinx transit project construction. 15. Directed the applicant to continue to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently place and legible from 20 metres and on all elevations from the construction site. 16. Directed the applicant to continue to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties such as cranes. 17. In areas where no cycling lanes exist, continue to direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 18. Directed the Director, Traffic Management, Transportation Services and the applicant to continue to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 19. Directed the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association and the Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk and a 5.5 metre wide portion of the southbound on Dalhousie Street, between Queen Street East and a point 33 metres north, from September 19, 2025 to September 30, 2028, inclusive, to allow for the completion of the development. 2. Toronto and East York Community Council direct the applicant to continue to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 3. Toronto and East York Community Council direct the applicant to continue to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 4. Toronto and East York Community Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. Toronto and East York Community Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 6. Toronto and East York Community Council direct the applicant to continue to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large-scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Toronto and East York Community Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 10. Toronto and East York Community Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Toronto and East York Community Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to continue to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 13. Toronto and East York Community Council direct that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. Toronto and East York Community Council direct that the occupation permit for construction staging on Dalhousie Street continue to be conditional, subject to there being no conflicts with Metrolinx transit project construction. 15. Toronto and East York Community Council direct the applicant to continue to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently place and legible from 20 metres and on all elevations from the construction site. 16. Toronto and East York Community Council direct the applicant to continue to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties such as cranes. 17. Toronto and East York Community Council, in areas where no cycling lanes exist, continue to direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 18. Toronto and East York Community Council direct the Director, Traffic Management, Transportation Services and the applicant to continue to establish a construction management working group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 19. Toronto and East York Community Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association and the Business Improvement Area Board of Management.
TE25.37amended
307 Sherbourne Street - Construction Staging Area
As the Toronto Transit Commission (TTC) operates a transit service on Sherbourne Street, City Council approval of this report is required. Forum Asset Management is constructing an 18-storey student residence at 307 Sherbourne Street. The site is located on the southeast corner of Sherbourne Street and Gerrard Street East. Transportation Services is requesting authorization to temporarily to close the east sidewalk and northbound cycle track on Sherbourne Street for a period of eight months, from October 15, 2025, to May 31, 2026, in order to enable construction staging operations for the development. Pedestrians will be redirected into a 1.8 metre wide covered and protected walkway within the closed portion of the northbound cycle track on the east side of Sherbourne Street. People cycling in the northbound cycle track be redirected into a 1.5 metre wide temporary bike lane. Pedestrian movements on the south side of Gerrard Street East will be maintained in a covered and protected walkway within the existing sidewalk.
The Toronto and East York Community Council recommends that: 1. City Council authorize the closure of the east sidewalk and easterly northbound designated cycle track on Sherbourne Street, between Gerrard Street East and a point 35 metres south, and a provision of a temporary pedestrian walkway within the closed portion of the designated cycle track and a temporary bike lane within a closed portion of the northbound traffic lane, from October 15, 2025 to May 31, 2026, inclusive. 2. City Council prohibit northbound left-turns, at all times, at the intersection of Sherbourne Street and Gerrard Street East. 3. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to include a minimum of 75 percent of advertisement surface area on the construction hoarding which is to be allocated to artwork with adequate spotlighting at their sole cost; design is to be reviewed and approved by the local Ward Councillor. 13. City Council direct the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the bicycle lanes. 14. City Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. City Council direct the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Building, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 16. City Council direct that Sherbourne Street be returned to its pre-construction traffic and parking regulations when the project is complete. 17. City Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 18. City Council direct the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 19. City Council direct the applicant, in consultation with Transportation Services, maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 20. City Council direct the applicant to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the east sidewalk and easterly northbound designated cycle track on Sherbourne Street, between Gerrard Street East and a point 35 metres south, and a provision of a temporary pedestrian walkway within the closed portion of the designated cycle track and a temporary bike lane within a closed portion of the northbound traffic lane, from October 15, 2025 to May 31, 2026, inclusive. 2. City Council prohibit northbound left-turns, at all times, at the intersection of Sherbourne Street and Gerrard Street East. 3. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. City Council direct the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the bicycle lanes. 14. City Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 15. City Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 16. City Council direct that Sherbourne Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.38amended
Encroachment Appeal - 495-517 Wellington Street West - Proposed Ground Sign
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. The purpose of this report is for Toronto East York Community Council to consider an appeal from the property owner of 495-517 Wellington Street West, a multi-tenant commercial building regarding their proposed encroachment application. The proposed encroachment consists of an illuminated electrified ground sign ("the sign") to identify multiple tenants in this commercial building. The proposed sign consists of aluminum and acrylic construction, measuring 4.05 metres high, 1.43 metres wide and 0.62 metres thick, with a foundation depth of 1.37 metres within the public right of way, which is in contravention of City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of. The property owner is seeking authority from Toronto and East York Community Council to permit an electrified ground sign to be installed within the public right-of-way fronting 495-517 Wellington Street West and enter into an encroachment agreement with the City. The proposed ground sign encroachment does not meet the requirements of the City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of, for delegated approval as an encroachment by the General Manager, Transportation Services. The owner will be given an opportunity to make a deputation before Community Council.
The Toronto and East York Community Council: 1. Authorized the General Manager, Transportation Services to enter into an Encroachment Agreement with property owner of 495-517 Wellington Street West, to permit a non-illuminated ground sign as shown on the plans prepared by Kramer Design Associates and dated June 6, 2025 within the Wellington Street West boulevard fronting 495-517 Wellington Street West, subject to the following conditions: a. indemnify the City from and against all actions, suits, claims or demands and from all loss, costs, damages, and expenses that may result from such permission granted; b. maintain the proposed non-illuminated ground sign at their own expense in good repair and a condition satisfactory to the General Manager, Transportation Services and will not make any additions or modifications to the encroachment beyond what is allowed under the terms of the Agreement; c. accept such additional conditions as the City Solicitor or the General Manager, Transportation Services may deem necessary in the interest of the City; d. remove the proposed non-illuminated ground sign upon receiving written notice from the General Manager, Transportation Services to do so; e. the property owner ensures that the Encroachment Agreement with the City of Toronto is registered on-title of all relevant properties, at the sole expense of the property owner; f. the property owner shall obtain all Public Utility Coordinating Committee clearances and/or signoffs from the public utility companies and satisfy any requirements they may have; g. the property owner shall agree that the City and/or utility companies may remove the encroachment at any time in order to install or maintain services within the affected public right-of-way with no obligation to replace them; h. the property owner shall apply to the appropriate City Official for the required sign permits applicable to the sign under Municipal Code Chapter 694, Signs, General or Chapter 693, Signs, Election or Temporary, Article 6, Vehicular Destination Signs, Neighbourhood and Business Area Identification Signs and Construction Hoarding Signs, as may be applicable; i. the property owner of shall ensure that no sign is erected until permits for the sign are obtained from the appropriate City Officials; j. the property owner of shall ensure that the sign is only erected, displayed and maintained in accordance with the requirements of sign permits issued; and provisions of Chapter 694, or Chapter 693, Article 6, as may be applicable; l. the property owner shall pay all applicable fees related to the permitting of the sign and the provision of permission for the private use of the public right-of-way; and m. the property owner will enter into an Encroachment Agreement with the City of Toronto, at the applicant's expense, and assume all liability and damages related to the encroachment.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the City to enter into an encroachment agreement with the owners of 495-517 Wellington Street West permitting the construction and maintenance of the illuminated electrified ground sign as it contravenes City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of.
TE25.39adopted
45 Montye Avenue - Encroachment Appeal
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. The purpose of this report is for Toronto East York Community Council to consider an appeal from the property owner of 45 Montye Avenue regarding their encroachment application. The encroachment consists of a wooden fence which is in contravention of City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of. The property owner is seeking authority from Toronto East York Community Council to allow a wooden fence to be maintained within the public right-of-way at 45 Montye Avenue, which is in contravention of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of.
The Toronto and East York Community Council: 1. Authorized the General Manager, Transportation Services to enter into an Encroachment Agreement with property owner of 45 Montye Avenue, to permit a wooden fence, subject but not limited to, the following conditions: a. indemnify the City from and against all actions, suits, claims or demands and from all loss, costs, damages, and expenses that may result from such permission granted; b. maintain the wooden fence at their own expense in good repair and a condition satisfactory to the General Manager, Transportation Services and will not make any additions or modifications to the encroachment beyond what is allowed under the terms of the Agreement; c. accept such additional conditions as the City Solicitor or the General Manager, Transportation Services may deem necessary in the interest of the City; d. remove the wooden fence upon receiving written notice to do so; e. the property owner will enter into an Encroachment Agreement with the City of Toronto, at the applicant's expense, and assume all liability and damages related to the encroachments; and f. no spikes or pointed tops are permitted on the fence, gate or pillars.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto East York Community Council authorize the General Manager of Transportation Services to enter into an encroachment agreement with property owner of 45 Montye Avenue, to permit a wooden fence, subject but not limited to, the following conditions: a. indemnify the City from and against all actions, suits, claims or demands and from all loss, costs, damages, and expenses that may result from such permission granted; b. maintain the wooden fence at their own expense in good repair and a condition satisfactory to the General Manager of Transportation Services and will not make any additions or modifications to the encroachment beyond what is allowed under the terms of the Agreement, c. accept such additional conditions as the City Solicitor or the General Manager of Transportation Services may deem necessary in the interest of the City; d. remove the wooden fence upon receiving written notice to do so; e. the property owner will enter into an encroachment agreement with the City of Toronto, at the applicant's expense, and assume all liability and damages related to the encroachments; and f. no spikes or pointed tops are permitted on the fence, gate or pillars.
TE25.40amended
Proposed Crosswalk Marking Policy and All-Way Stop Sign Control Justification Policy
The purpose of this report is to present proposed updates to the following two policies in support of the Vision Zero Road Safety Plan, for the purposes of obtaining feedback from Toronto and East York Community Council: - Crosswalk Marking Policy; and - All-Way Stop Sign Control Justification Policy. As recommended by Infrastructure and Environment Committee, City Council directed the General Manager, Transportation Services to present to the four Community Councils on the Crosswalk Marking Policy and the All-Way Stop Sign Control Justification Policy, and directed the General Manager, Transportation Services to report back to the Infrastructure and Environment Committee on any updates to the polices as a result of those consultations with Community Councils. Transportation Services will report back to the Infrastructure and Environment Committee in the fourth quarter of 2025 on the proposed policies and any updates as a result of consultation with Community Councils.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services to consider the following for inclusion in their report to the Infrastructure and Environment Committee: a. using zebra crosswalk markings at all new marked crosswalks.
Staff recommendation as filed
The Director, Planning, Design and Management, Transportation Services recommends that: 1. Toronto and East York Community Council receive this report for information.
TE25.41amended
Improving the Speed and Reliability of the 7 Bathurst
As the Toronto Transit Commission (TTC) operates a transit service on Bathurst Street, City Council approval of this report is required. The focus of this report is Bathurst Street, from Eglinton Avenue West to Bathurst Station North Exit. The recommended changes, which consist of extensions to No Stopping restrictions on the east side of Bathurst Street in the afternoon and weekend, as well as changes to some No Left-Turn restrictions, are intended to clear parking in the curb lane and prohibit turning vehicles from blocking buses and general traffic at intersections, for periods where the 7 Bathurst service is significantly impacted by congestion. An analysis of the TTC's 7 Bathurst operations supports the recommendations in this report. The proposed extended traffic regulations are intended to improve the reliability of the afternoon bus route and reduce traffic congestion in the afternoon outside of peak hours. Conditions will be monitored following implementation, to determine whether the changes have the intended effect, and whether any further adjustments are required. In addition, the TTC is currently undertaking a Bunching and Gapping study to improve the service reliability of select TTC routes, including the 7 Bathurst. The study focuses on shifting route management from an emphasis on departures at end terminals to a more customer-oriented approach, recognizing that customers depend on vehicles arriving at regularly spaced intervals, and not a schedule. Additional recommendations for the 7 Bathurst are expected to come from the TTC's Bunching and Gapping study, once the study concludes.
The Toronto and East York Community Council recommends that: 1. City Council prohibit stopping on the east side of Bathurst Street between Eglinton Avenue West and Bathurst Station North Exit from 2:00 p.m. to 7:00 p.m., Monday to Friday and from 12:00 p.m. to 7:00 p.m., Saturday to Sunday, except public holidays. 2. City Council prohibit northbound left-turns, from 7:00 a.m. to 7:00 p.m. Monday to Saturday, except public holidays (Toronto Transit Commission vehicles excepted), at the intersection of Bathurst Street and Davenport Road. 3. City Council prohibit southbound left-turns, from 7:00 a.m. to 7:00 p.m. Monday to Saturday, except public holidays (Toronto Transit Commission vehicles excepted), at the intersection of Bathurst Street and Dupont Street. 4. City Council rescind the existing northbound left-turn restriction, from 7:00 a.m. to 9:00 a.m., Monday to Friday, at the intersection of Bathurst Street and Dupont Street. 5. City Council enact the amendments to traffic and parking regulations associated with Recommendations 1 to 4 above and as generally described in Attachment 1 to the report (September 2, 2025) from the Director, Planning, Design and Management, Transportation Services. 6. City Council direct the General Manager, Transportation Services, in consultation with the Chief Executive Officer, Toronto Transit Commission, to monitor the impacts of No Stopping restrictions on the east side of Bathurst and No Left-Turn restrictions, and to report back to the Toronto and East York Community Council in November 2026 on the transit speed and reliability improvements delivered from these measures, with an interim report in July 2026.
Staff recommendation as filed
The Director, Planning, Design and Management, Transportation Services recommends that: 1. City Council prohibit stopping on the east side of Bathurst Street between Eglinton Avenue West and Bathurst Station North Exit from 2:00 p.m. to 7:00 p.m., Monday to Friday and from 12:00 p.m. to 7:00 p.m., Saturday to Sunday, except public holidays. 2. City Council prohibit northbound left-turns, from 7:00 a.m. to 7:00 p.m. Monday to Saturday, except public holidays (Toronto Transit Commission vehicles excepted), at the intersection of Bathurst Street and Davenport Road. 3. City Council prohibit southbound left-turns, from 7:00 a.m. to 7:00 p.m. Monday to Saturday, except public holidays (Toronto Transit Commission vehicles excepted), at the intersection of Bathurst Street and Dupont Street. 4. City Council rescind the existing northbound left-turn restriction, from 7:00 a.m. to 9:00 a.m., Monday to Friday, at the intersection of Bathurst Street and Dupont Street. 5. City Council enact the following amendments to traffic and parking regulations associated with Recommendations 1-4 and as generally described in Attachment 1 - Amendments to Traffic and Parking Regulations to the report (September 2, 2025) from the Director, Planning, Design and Management, Transportation Services.
TE25.42adopted
Accessible Parking Spaces - September 2025 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 to the report (September 2, 2025) from the Director, Enforcement and Street Management, Transportation Services.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 and attached to the report entitled "Accessible Parking Spaces - September 2025 (Delegated)", dated September 2, 2025, from the Director, Enforcement and Street Management, Transportation Services.
TE25.43adopted
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Toronto Parking Authority (TPA) has worked with Transportation Services to identify a new on-street paid parking opportunity in Ward 9 that will support the local community and area businesses by encouraging a regular turnover in the on-street parking supply. Through this review, Transportation Services is requesting approval for the installation of on-street paid parking on Dovercourt Road in Ward 9. The proposed parking changes will replace the existing parking restrictions currently in effect, including restricted one-hour unpaid parking. The proposed changes will not impact the flow of traffic and will encourage parking turnover. Transportation Services is also requesting approval to amend the existing permit parking hours on the west side of Dovercourt Road at the request of the Ward Councillor. Permit parking will remain and can co-exist with the proposed on-street paid parking. Valid permit holders would not be subject to a parking fee where permit parking signs and on-street paid parking signs co-exist. While this report seeks Community Council approval for the installation of on-street paid parking on Dovercourt Road in Ward 9, this is an ongoing initiative; Transportation Services and TPA will continue to review and report on potential new on-street paid parking opportunities throughout the City of Toronto.
The Toronto and East York Community Council: 1. Rescinded the existing one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, and from 8:00 a.m. to 6:00 p.m., Saturday, on the west side of Dovercourt Road, between a point 30.5 metres south of Dundas Street West and a point 15 metres north of Mackenzie Crescent. 2. Authorized the installation of parking machines to be in effect from 7:00 a.m. to 6:00 p.m., Monday to Sunday, at a rate of $3.00 per hour for a maximum period of 2 hours, on the west side of Dovercourt Road, between Dundas Street West and Mackenzie Crescent. 3. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking anytime Monday to Saturday from Dundas Street West to Harrison Street, and no parking from 8:30 a.m. to 6:00 p.m., Monday to Friday, from St. Annes Road to a point 122 metres south of it, on the even (west) side of Dovercourt Road, from Sudbury Street to Dundas Street West. 4. Authorized parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Sudbury Street to Queen Street West. 5. Authorized parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Queen Street West to Mackenzie Crescent. 6. Authorized parking by permit only to be in effect from 6:00 p.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Mackenzie Crescent to Dundas Street West.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, and from 8:00 a.m. to 6:00 p.m., Saturday, on the west side of Dovercourt Road, between a point 30.5 metres south of Dundas Street West and a point 15 metres north of Mackenzie Crescent. 2. Toronto and East York Community Council authorize the installation of parking machines to be in effect from 7:00 a.m. to 6:00 p.m., Monday to Sunday, at a rate of $3.00 per hour for a maximum period of 2 hours, on the west side of Dovercourt Road, between Dundas Street West and Mackenzie Crescent. 3. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking anytime Monday to Saturday from Dundas Street West to Harrison Street, and no parking from 8:30 a.m. to 6:00 p.m., Monday to Friday, from St. Annes Road to a point 122 metres south of it, on the even (west) side of Dovercourt Road, from Sudbury Street to Dundas Street West. 4. Toronto and East York Community Council authorize parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Sudbury Street to Queen Street West. 5. Toronto and East York Community Council authorize parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Queen Street West to Mackenzie Crescent. 6. Toronto and East York Community Council authorize parking by permit only to be in effect from 6:00 p.m. to 7:00 a.m. daily on the even (west) side of Dovercourt Road, from Mackenzie Crescent to Dundas Street West.
TE25.44adopted
Earlscourt Avenue - Accessible Loading Zone
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation of a designated on-street accessible loading zone on the east side of Earlscourt Avenue, between Hope Street and Ascot Avenue. The accessible loading zone will operate from 8:00 a.m. to 5:00 p.m., Monday to Friday. The establishment of this accessible loading zone will provide unimpeded curbside access for the Toronto Transit Commission (TTC) Wheel-Trans users in the subject area. During the investigation, Transportation Services discovered discrepancies between the by-lawed parking regulations and the posted signage on Earlscourt Avenue. Recommendations 2 to 10 will rectify these inconsistencies.
The Toronto and East York Community Council: 1. Designated an accessible loading zone to be in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, on the east side of Earlscourt Avenue, between a point 59 metres south of Hope Street and a point 10 metres further south. 2. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from 7:00 p.m. on the 1st day to 7:00 p.m. on the 16th day of each month, inclusive, from April 1 to December 1, inclusive, on the odd (east) side of Earlscourt Avenue from 211 to Rogers Road. 3. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 16th day to the last day of each month, inclusive, from April 1 to November 30, inclusive, on the odd (east) side of Earlscourt Avenue from Ascot Avenue to a point 23 metres north of Morrison Avenue. 4. Rescinded the existing permit parking regulation in effect from 12:00 midnight to 6:00 a.m., daily, except no parking from 7:00 p.m. on the 16th day of each month to 7:00 p.m. on the 1st day of each month, inclusive, from April 1 to December 1, inclusive, and no parking anytime from 7:00 p.m. December 1 of one year to 7:00 p.m. April 1 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from 220 to Rogers Road. 5. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the first day to the 15th day of each month from April 1 to November 30, inclusive, and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from Ascot Avenue to a point 23 metres north of Morrison Avenue. 6. Rescinded the existing accessible parking space in effect at all times, from the 16th day to the last day of each month from April 1 to November 30, inclusive, on the east side of Earlscourt Avenue, between a point 58 metres south of Hope Street and a point 5.5 metres further south. 7. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 16th day to the last day of each month, inclusive, from April 1 to November 30, inclusive, on the odd (east) side of Earlscourt Avenue from Ascot Avenue to Rogers Road. 8. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from Ascot Avenue to Rogers Road. 9. Designated an accessible parking space to be in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, and from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, on the east side of Earlscourt Avenue, between a point 53.5 metres south of Hope Street and a point 5.5 metres further south. 10. Amended the existing accessible parking space in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, and from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, on the west side of Earlscourt Avenue between a point 52.2 metres south of Hope Street and a point 5.5 metres further south to be in effect at all times, from the 16th day to the last day of each month from April 1 to November 30, inclusive.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services recommends that: 1. Toronto and East York Community Council designate an accessible loading zone to be in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, on the east side of Earlscourt Avenue, between a point 59 metres south of Hope Street and a point 10 metres further south. 2. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from 7:00 p.m. on the 1st day to 7:00 p.m. on the 16th day of each month, inclusive, from April 1 to December 1, inclusive, on the odd (east) side of Earlscourt Avenue from 211 to Rogers Road. 3. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 16th day to the last day of each month, inclusive, from April 1 to November 30, inclusive, on the odd (east) side of Earlscourt Avenue from Ascot Avenue to a point 23 metres north of Morrison Avenue. 4. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:00 midnight to 6:00 a.m., daily, except no parking from 7:00 p.m. on the 16th day of each month to 7:00 p.m. on the 1st day of each month, inclusive, from April 1 to December 1, inclusive, and no parking anytime from 7:00 p.m. December 1 of one year to 7:00 p.m. April 1 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from 220 to Rogers Road. 5. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the first day to the 15th day of each month from April 1 to November 30, inclusive, and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from Ascot Avenue to a point 23 metres north of Morrison Avenue. 6. Toronto and East York Community Council rescind the existing accessible parking space in effect at all times, from the 16th day to the last day of each month from April 1 to November 30, inclusive, on the east side of Earlscourt Avenue, between a point 58 metres south of Hope Street and a point 5.5 metres further south. 7. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 16th day to the last day of each month, inclusive, from April 1 to November 30, inclusive, on the odd (east) side of Earlscourt Avenue from Ascot Avenue to Rogers Road. 8. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, and no parking anytime from December 1 of one year to March 31 of the next following year, inclusive, on the even (west) side of Earlscourt Avenue from Ascot Avenue to Rogers Road. 9. Toronto and East York Community Council designate an accessible parking space to be in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, and from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, on the east side of Earlscourt Avenue, between a point 53.5 metres south of Hope Street and a point 5.5 metres further south. 10. Toronto and East York Community Council amend the existing accessible parking space in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, and from the 1st day to the 15th day of each month from April 1 to November 30, inclusive, on the west side of Earlscourt Avenue between a point 52.2 metres south of Hope Street and a point 5.5 metres further south to be in effect at all times, from the 16th day to the last day of each month from April 1 to November 30, inclusive.
TE25.45adopted
Howard Street and Redrocket Lane - Traffic and Parking Amendments
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for traffic and parking amendments on Howard Street and Redrocket Lane for a new development located at 603-611 Sherbourne Street and 4-6 Howard Street. The proposed traffic and parking amendments will address requirements of the site plan agreement on Howard Street and Redrocket Lane.
The Toronto and East York Community Council: 1. Prohibited stopping at all times on the south side of Howard Street, between Bleecker Street and a point 15 metres west. 2. Rescinded the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Sherbourne Street and Glen Road. 3. Prohibited parking from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Sherbourne Street and a point 15 metres west of Bleecker Street. 4. Prohibited parking from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Bleecker Street and Glen Road. 5. Rescinded the existing parking machine regulation on the south side of Howard Street, between Sherbourne Street and Glen Road, in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 6. Authorized the installation of parking machines on the south side of Howard Street, between Sherbourne Street and a point 15 metres west of Bleecker Street, to be in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 7. Authorized the installation of parking machines on the south side of Howard Street, between Bleecker Street and Glen Road, to be in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 8. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from 7:00 a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday and public holidays, from Glen Road to Sherbourne Street, on the odd (south) side of Howard Street, from Sherbourne Street to Parliament Street. 9. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking from 7:00 a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday and public holidays, from Sherbourne Street and a point 15 metres west of Bleecker Street and no stopping anytime from Bleecker Street to a point 15 metres west, on the odd (south) side of Howard Street, from Sherbourne Street to Parliament Street. 10. Amended the existing one-way for southbound traffic only regulation on Redrocket Lane, between Howard Street and Bloor Street East, to operate between a point 21 metres north of Howard Street and Bloor Street East. 11. Prohibited standing at all times on both sides of Redrocket Lane, between Howard Street and a point 21 metres north. 12. Amended the existing parking machine regulation on the south side of Howard Street, between Glen Road and Parliament Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.00 per hour and for a maximum period of three hours to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 13. Rescinded the existing parking machine regulation on the south side of Howard Street, between Glen Road and a point 139 metres west of Parliament Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services and the Director, Engineering Review, Development Review recommend that: 1. Toronto and East York Community Council prohibit stopping at all times on the south side of Howard Street, between Bleecker Street and a point 15 metres west. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Sherbourne Street and Glen Road. 3. Toronto and East York Community Council prohibit parking from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Sherbourne Street and a point 15 metres west of Bleecker Street. 4. Toronto and East York Community Council prohibit parking from 7:00 a.m. to 9:00 a.m., and from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the south side of Howard Street, between Bleecker Street and Glen Road. 5. Toronto and East York Community Council rescind the existing parking machine regulation on the south side of Howard Street, between Sherbourne Street and Glen Road, in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 6. Toronto and East York Community Council authorize the installation of parking machines on the south side of Howard Street, between Sherbourne Street and a point 15 metres west of Bleecker Street, to be in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 7. Toronto and East York Community Council authorize the installation of parking machines on the south side of Howard Street, between Bleecker Street and Glen Road, to be in effect from 9:00 a.m. to 4:00 p.m. and from 6:00 p.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 8. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, except no parking from 7:00 a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday and public holidays, from Glen Road to Sherbourne Street, on the odd (south) side of Howard Street, from Sherbourne Street to Parliament Street. 9. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking from 7:00 a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday and public holidays, from Sherbourne Street and a point 15 metres west of Bleecker Street and no stopping anytime from Bleecker Street to a point 15 metres west, on the odd (south) side of Howard Street, from Sherbourne Street to Parliament Street. 10. Toronto and East York Community Council amend the existing one-way for southbound traffic only regulation on Redrocket Lane, between Howard Street and Bloor Street East, to operate between a point 21 metres north of Howard Street and Bloor Street East. 11. Toronto and East York Community Council prohibit standing at all times on both sides of Redrocket Lane, between Howard Street and a point 21 metres north. 12. Toronto and East York Community Council amend the existing parking machine regulation on the south side of Howard Street, between Glen Road and Parliament Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.00 per hour and for a maximum period of three hours to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours. 13. Toronto and East York Community Council rescind the existing parking machine regulation on the south side of Howard Street, between Glen Road and a point 139 metres west of Parliament Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of three hours.
TE25.46adopted
Melinda Street - Parking Amendments
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that the existing parking prohibition on the north side of Melinda Street, west of Yonge Street, be increased to a standing prohibition. The proposed amendment will further deter parking on this section of roadway which will provide unobstructed access to the One King West Hotel and Residence.
The Toronto and East York Community Council: 1. Rescinded the existing parking prohibition in effect at all times on the north side of Melinda Street, between Yonge Street and a point 35 metres west. 2. Prohibited standing at all times on the north side of Melinda Street, between Yonge Street and a point 35 metres west.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the north side of Melinda Street, between Yonge Street and a point 35 metres west. 2. Toronto and East York Community Council prohibit standing at all times on the north side of Melinda Street, between Yonge Street and a point 35 metres west.
TE25.47adopted
Introduction of Overnight On-Street Permit Parking - Permit Area 9A Thyra Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that overnight on-street permit parking be introduced on the west side of Thyra Avenue from Danforth Avenue to Dentonia Park Avenue, 12:01 a.m. to 7:00 a.m. daily, within Permit Parking Area 9A and that the current no parking regulations alternating from the east and west sides of Thyra Avenue be removed, with no parking regulations introduced on the east side of Thyra Avenue between Danforth Avenue and Detonia Park Avenue. Residents requested the implementation of overnight on-street permit parking on Thyra Avenue from Danforth Avenue to Dentonia Park Avenue within Permit Parking Area 9A, to accommodate their long-term parking needs.
The Toronto and East York Community Council: 1. Authorized parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Thyra Avenue, from Danforth Avenue to Dentonia Park Avenue, within Permit Parking Area 9A. 2. Rescinded the parking prohibition in effect May, July, September and November on the east side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue. 3. Rescinded the parking prohibition in effect January, February, March, April, June, August, October and December, on the west side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue. 4. Prohibited parking at all times on the east side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council authorize parking by permit only to be in effect from 12:01 a.m. to 7:00 a.m. daily on the even (west) side of Thyra Avenue, from Danforth Avenue to Dentonia Park Avenue, within Permit Parking Area 9A. 2. Toronto and East York Community Council rescind the parking prohibition in effect May, July, September and November on the east side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue. 3. Toronto and East York Community Council rescind the parking prohibition in effect January, February, March, April, June, August, October and December, on the west side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue. 4. Toronto and East York Community Council prohibit parking at all times on the east side of Thyra Avenue, between Danforth Avenue and Dentonia Park Avenue.
TE25.48adopted
Compulsory Stop Controls - Various Intersections in Ward 4
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to install compulsory stop controls at five, currently uncontrolled, "T" type intersections on Beresford Avenue, Lincoln Avenue, Mapleview Avenue and Herman Avenue. Based on an assessment undertaken, the installation of compulsory stop controls at these intersections is recommended to clearly define the right-of-way and enhance safety for all road users.
The Toronto and East York Community Council: 1. Authorized a compulsory stop control for southbound traffic on Beresford Avenue at MacGregor Avenue. 2. Authorized a compulsory stop control for westbound traffic on Lincoln Avenue at Beresford Avenue. 3. Authorized a compulsory stop control for northbound traffic on Mapleview Avenue at Lincoln Avenue. 4. Authorized a compulsory stop control for southbound traffic on Mapleview Avenue at MacGregor Avenue. 5. Authorized a compulsory stop control for eastbound traffic on Herman Avenue at Ritchie Avenue.
Staff recommendation as filed
The Director, Enforcement and Street Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize a compulsory stop control for southbound traffic on Beresford Avenue at MacGregor Avenue. 2. Toronto and East York Community Council authorize a compulsory stop control for westbound traffic on Lincoln Avenue at Beresford Avenue. 3. Toronto and East York Community Council authorize a compulsory stop control for northbound traffic on Mapleview Avenue at Lincoln Avenue. 4. Toronto and East York Community Council authorize a compulsory stop control for southbound traffic on Mapleview Avenue at MacGregor Avenue. 5. Toronto and East York Community Council authorize a compulsory stop control for eastbound traffic on Herman Avenue at Ritchie Avenue.
TE25.49deferred indefinitely
As the Toronto Transit Commission (TTC) operates a transit service on Sherbourne Street North, Elm Avenue and Maple Avenue, City Council approval of this report is required. Transportation Services is requesting approval to install traffic control signals at the intersection of Sherbourne Street North and Elm Avenue/Maple Avenue. The traffic control signals will provide enhanced safety for all road users and is justified based on the assessment undertaken. Due to the complex geometry of this intersection, for the traffic control signal to operate safely, it will also be necessary to: - Prohibit northbound right turns on red at all times from Sherbourne Street North to Elm Avenue; and - Designate Maple Avenue, between Sherbourne Street North and Glen Road (west intersection) one-way for eastbound traffic only.
The Toronto and East York Community Council deferred the Item indefinitely.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Sherbourne Street North and Elm Avenue/Maple Avenue. 2. Subject to approval of Recommendation 1 above and in conjunction with the installation of traffic control signals at Sherbourne Street North and Elm Avenue/Maple Avenue: a. City Council rescind the existing all-way compulsory stop control at the intersection of Sherbourne Street North and Elm Avenue/Maple Avenue. b. City Council prohibit northbound right turns on a red signal at all times, on Sherbourne Street North at Elm Avenue. c. City Council designate Maple Avenue, between Sherbourne Street North and Glen Road (west intersection), as one-way for eastbound traffic only.
TE25.50amended
Engineering and Construction Services will be undertaking a watermain and TTC track replacement project on Queen Street East, between Davies Avenue and Broadview Avenue, from October 1, 2025 to May 1, 2026. The work will be completed in phases to avoid a full closure of Queen Street East. Traffic lanes will be reduced to one eastbound and one westbound traffic lane during the watermain replacement, from October 2025 to February 2026. From March 2026 to April 2026, Queen Street East will be reduced to a single eastbound lane to facilitate the streetcar track replacement. Transportation Services is recommending amendments to the traffic and parking regulations in the area surrounding the construction site, as well as requesting approval, on behalf of the Toronto Transit Commission (TTC), to install transit priority measures (TPMs) on Dundas Street East, between Parliament Street and River Street to support the transit routes diverted due to the watermain and TTC track replacement project. The 501 Queen, 503 Kingston Road, and 504 King will be diverted due to the closure. To maintain traffic flow around the construction on Queen Street East, this report proposes prohibiting stopping at all times on both sides of Queen Street East between Davies Avenue and Broadview Avenue. During the streetcar track closures from March 2026 to April 2026, Hamilton Street will be converted from a one-way northbound operation to a temporary two-way operation to facilitate local egress. The suite of TPMs proposed in this report aim to improve the speed and reliability of impacted TTC routes during the partial closure of Queen Street East. The proposed changes include increased duration of existing 'No Stopping' and 'No Parking' zones, new turning restrictions, and increased duration of existing turning restrictions. The proposed changes aim to mitigate the impact on the 49,000 streetcar customers travelling each day on the routes affected directly or indirectly by the construction closure (based on Spring 2025 ridership). To support streetcar and general traffic operations along diverted transit routes, this report proposes extending existing 'No Stopping' restrictions on Dundas Street East between Parliament Street and Sackville Street to cover the periods of 7:00 a.m. to 10:00 a.m. and 3:00 p.m. to 7:00 p.m., Monday to Friday. It also proposes extending or implementing 'No Parking' restrictions on the north side of Dundas Street East between Parliament Street and Sackville Street from 10:00 a.m. to 3:00 p.m. Monday to Friday, and 12:00 p.m. to 7:00 p.m. Saturday to Sunday. The south side of Dundas Street East between Parliament Street to Sackville Street has existing Anytime 'No Parking' restrictions. New or extended turn prohibitions are proposed at multiple intersections along Dundas Street East between Parliament Street and River Street to reduce delay to streetcars at these intersections from turning vehicles. The transit priority measures were focussed on Dundas Street East, between Parliament Street and Broadview Avenue as this stretch has the highest streetcar frequency of the streets affected by the TTC diversion (12-16 streetcars per hour in the PM peak). Parliament Street and Broadview Avenue have similar transit vehicle frequencies (12 per hour and 14-15 per hour respectively), but these are made up of both streetcar and bus services; buses are able to manoeuvre around traffic and pass other buses and turning vehicles (if a lane is available), whereas streetcars move on a track and are vulnerable to both their own delays and delays affecting the streetcars ahead of them. The segments of Parliament Street, Broadview Avenue, and River Street supporting additional TTC service during the partial closure of Queen Street East will be monitored and transit priority measures will be proposed if necessary, such as curbside use restrictions and/or turn prohibitions. Any additional TPMs that would be proposed to support the diversions in Ward 14 will be coordinated with the work associated with 2025.TE24.46 Traffic Management in Ward 14 related to the King Street East and Church Street Intersection Project, which is on-going and has in-progress traffic monitoring. As part of this project the TTC is working with the City of Toronto on improvements to transit and traffic in this area. Before the start of construction, the TTC streetcar stops at Dundas Street East and Munro Street will be removed to improve the traffic flow in this area. TTC and Transportation Services will complete modelling with the data collection program to further support recommendations in the area. An update on these efforts and recommendations for Item 2025.TE24.46 will be addressed at the Toronto and East York Community Council Meeting on October 22, 2025. As TTC operates transit service on Queen Street East and Dundas Street East, City Council approval of this report is required.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing parking prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays on the north side of Queen Street East, between Davies Avenue and Broadview Avenue. 2. City Council rescind the existing stopping prohibition in effect 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the north side of Queen Street East, between Davies Avenue and Broadview Avenue. 3. City Council rescind the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the south side of Queen Street East, between East Don Roadway and Broadview Avenue. 4. City Council rescind the existing stopping prohibition in effect 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays on the south side of Queen Street East, between a point opposite Carroll Street and Broadview Avenue 5. City Council rescind the existing stopping prohibition in effect 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays on the south side of Queen Street East, between East Don Roadway and a point opposite Carroll Street. 6. City Council rescind the existing parking machine regulation on the north side of Queen Street East, between Don Bridge and Broadview Avenue, in effect from 9:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 7. City Council rescind the existing parking machine regulation on the north side of Queen Street East, between Davies Avenue and Carroll Street, in effect from 9:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 8. City Council rescind the existing parking machine regulation on the south side of Queen Street East, between Carroll Street and Broadview Avenue, in effect from 9:00 a.m. to 3:30 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 9. City Council rescind the existing parking machine regulation on the south side of Queen Street East, between Carroll Street and Broadview Avenue, in effect from 6:30 p.m. to 9:00 p.m., Monday to Friday, for a maximum period of 2.5 hours at a rate of $3.00 per hour. 10. City Council prohibit stopping at all times on both sides of Queen Street East, between Davies Avenue and Broadview Avenue. 11. City Council rescind the existing one-way southbound traffic only on Hamilton Street, between Queen Street East and Thompson Street. 12. City Council rescind the existing parking prohibition at all times on the east side of Hamilton Street, between Queen Street East and Thompson Street. 13. City Council prohibit stopping at all times on the east side of Hamilton Street, between Queen Street East and Thompson Street. 14. City Council direct that Queen Street East and Hamilton Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is completed. 15. City Council authorize amendments to parking and traffic regulations as set out in Attachment 1 to the motion by Councillor Chris Moise to take effect from October 1, 2025, until regular Toronto Transit Commission streetcar service has resumed along Queen Street East, Broadview Avenue to Davies Avenue, after the Toronto Transit Commission track replacement work is complete. 16. City Council direct the General Manager, Transportation Services, in consultation with the Chief Executive Officer, Toronto Transit Commission, to report back to the Toronto and East York Community Council in the first quarter of 2026 on the effectiveness of these changes for streetcar operations and a recommended long-term plan for parking and traffic regulations on Dundas Street East, from Parliament Street to River Street.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council rescind the existing parking prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays on the north side of Queen Street East, between Davies Avenue and Broadview Avenue. 2. City Council rescind the existing stopping prohibition in effect 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the north side of Queen Street East, between Davies Avenue and Broadview Avenue. 3. City Council rescind the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the south side of Queen Street East, between East Don Roadway and Broadview Avenue. 4. City Council rescind the existing stopping prohibition in effect 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays on the south side of Queen Street East, between a point opposite Carroll Street and Broadview Avenue 5. City Council rescind the existing stopping prohibition in effect 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays on the south side of Queen Street East, between East Don Roadway and a point opposite Carroll Street. 6. City Council rescind the existing parking machine regulation on the north side of Queen Street East, between Don Bridge and Broadview Avenue, in effect from 9:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 7. City Council rescind the existing parking machine regulation on the north side of Queen Street East, between Davies Avenue and Carroll Street, in effect from 9:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 8. City Council rescind the existing parking machine regulation on the south side of Queen Street East, between Carroll Street and Broadview Avenue, in effect from 9:00 a.m. to 3:30 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m. Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours at a rate of $3.00 per hour. 9. City Council rescind the existing parking machine regulation on the south side of Queen Street East, between Carroll Street and Broadview Avenue, in effect from 6:30 p.m. to 9:00 p.m., Monday to Friday, for a maximum period of 2.5 hours at a rate of $3.00 per hour. 10. City Council prohibit stopping at all times on both sides of Queen Street East, between Davies Avenue and Broadview Avenue. 11. City Council rescind the existing one-way southbound traffic only on Hamilton Street, between Queen Street East and Thompson Street. 12. City Council rescind the existing parking prohibition at all times on the east side of Hamilton Street, between Queen Street East and Thompson Street. 13. City Council prohibit stopping at all times on the east side of Hamilton Street, between Queen Street East and Thompson Street. 14. City Council direct that Queen Street East and Hamilton Street be returned to its pre-construction traffic and parking regulations (except with parking rates and hours of operation being consistent to the rates and hours of operation at the time of completion) when the project is completed. 15. City Council authorize amendments to parking and traffic regulations as set out in Attachment 1 to take effect from October 1, 2025, until regular Toronto Transit Commission streetcar service has resumed along Queen Street East, Broadview Avenue to Davies Avenue, after the TTC track replacement work is complete. 16. City Council delegate, despite any City of Toronto By-law to the contrary, to the General Manager, Transportation Services, from October 1, 2025, to May 1, 2026, inclusive, for the purposes of implementing and then addressing any operation and/or safety issues that may arise in relation to the project identified above, the authority to implement changes and submit directly to Council any necessary bills for by-law amendments to the schedules to City of Toronto Code Chapters on the streets and within the parameters as identified in Attachment 2 to the report from the General Manager, Transportation Services. 17. City Council direct the General Manager, Transportation Services, in consultation with the Chief Executive Officer, Toronto Transit Commission, to report back to the Toronto and East York Community Council in the first quarter of 2026 on the effectiveness of these changes for streetcar operations and a recommended long-term plan for parking and traffic regulations on Dundas Street East, from Parliament Street to River Street.