The decision
2022-06-15 · Toronto City Council · adopted
As filed
City Council on June 15 and 16, 2022, adopted the following: 1. City Council endorse the Preferred Solution and Design for flood protecting the Rockcliffe-Smythe area as generally shown in Attachment 1 to the report (May 11, 2022) from the General Manager, Transportation Services and the General Manager, Toronto Water. 2. City Council request the Toronto and Region Conservation Authority, the General Manager, Transportation
Show the rest of As filed, 267 more characters as filed
Services and the General Manager, Toronto Water to prepare the Environmental Study Report, issue the Notice of Completion, and put the Environmental Study Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
On the agenda
As the city filed it
The Rockcliffe-Smythe area is located in Ward 5 (York South-Weston) and is the most flood vulnerable area in the Toronto and Region Conservation Authority's jurisdiction. There are hundreds of buildings within the regulatory floodplain of Black Creek and Lavender Creek; many of these properties experience frequent surface and basement flooding during severe storms. This is a result of riverine flooding and the overloading of the City of Toronto's urban drainage system.
Show the rest of As the city filed it, 1,521 more characters as filed
The City of Toronto, together with Toronto and Region Conservation Authority, initiated a Municipal Class Environmental Assessment to determine a preferred riverine flood mitigation strategy for the Rockcliffe-Smythe neighbourhood, and satisfy all four phases of the Municipal Class Environmental Assessment process. This study built upon recent advancements in the understanding of the causes of flooding within the community. Completion of the Municipal Class Environmental Assessment is the next step necessary to meet regulatory requirements prior to construction of flood mitigation measures. This report recommends the Preferred Solution and Design for providing riverine flood protection to the Rockcliffe-Smythe area for endorsement by City Council. This report also reviews the opportunities explored to naturalize the Black Creek Channel as a part of establishing the alternative designs as directed by City Council. The Preferred Solution involves significant infrastructure investment to modify the Black Creek and Lavender Creek Channels, construct a new flood protection wall, road realignment, as well as several bridge and culvert replacements. The entire project would be constructed in phases over an anticipated 10-year timeframe, and would flood protect 195 homes located in approximately 80 hectares (198 acres) of flood prone land from the 350-year flood area, and remove 222 buildings from the regulatory floodplain during a regional storm event, at an estimated cost of approximately $371 million.
Staff recommended
The General Manager, Transportation Services and the General Manager, Toronto Water recommend that: 1. City Council endorse the recommended Preferred Solution and Design for flood protecting the Rockcliffe-Smythe area as generally shown in Attachment 1. 2. City Council request the Toronto and Region Conservation Authority, General Manager, Transportation Services and General Manager, Toronto Water to prepare the Environmental
Show the rest of Staff recommended, 190 more characters as filed
Study Report, issue the Notice of Completion, and put the Environmental Study Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
Considered
2022-05-25 · Infrastructure and Environment Committee · adopted
Decision as filed
The Infrastructure and Environment Committee recommends that: 1. City Council endorse the recommended Preferred Solution and Design for flood protecting the Rockcliffe-Smythe area as generally shown in Attachment 1 to the report (May 11, 2022) from the General Manager, Transportation Services and the General Manager, Toronto Water. 2. City Council request the Toronto and Region Conservation Authority, General Manager,
Show the rest of Decision as filed, 278 more characters as filed
Transportation Services and General Manager, Toronto Water to prepare the Environmental Study Report, issue the Notice of Completion, and put the Environmental Study Report in the public record in accordance with the requirements of the Municipal Class Environmental Assessment.
2022-06-15 · Toronto City Council · adopted
On the record
More from this meeting
- Amendment to Purchase Order Number 6052605 with Moose Power Incorporated for Design and Construction of Solar Photovoltaic Rooftop SystemsFiled record
- Amendment to Purchase Order Number 6045927 for Detailed Design Services for the Sheppard Avenue and Leslie Street Sanitary Sewer Upgrades ProjectFiled record
- Amendment to Purchase Order Number 6045265 with Morrison Hershfield Limited for Professional Services for Scarlett Road Underpass Bridge Replacement and Road Network Improvements at Canadian Pacific Railway / Metrolinx Rail CorridorFiled record
- Contract Award of Negotiable Request for Proposal Document 3166773834 for the Construction of WatermainsFiled record
- Contract Award for Professional Engineering Services to WSP Canada Incorporated - Ariba Document Number 3151539512Filed record
- Amendments to Purchase Order Number 6042338 and 6042339 for Project Management and Engineering Services for the Detailed Design of the Integrated Pumping Station at the Ashbridges Bay Treatment PlantFiled record