The full agenda, as filed
All 73 items in the clerk’s order. Each carries the city’s own words: the staff recommendation, what the body decided, and its status. Nothing below is written by us.
Items 51 to 73 of 73Show 2550100all
TE12.51adopted
All-Way Stop Control - Huron Street and Glen Morris Street
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to install all-way stop control at the intersection of Huron Street and Glen Morris Street. Based on the assessment undertaken, the installation of all-way stop control is recommended and should enhance safety for all road users.
The Toronto and East York Community Council: 1. Authorized all-way compulsory stop control at the intersection of Huron Street and Glen Morris Street.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize all-way compulsory stop control at the intersection of Huron Street and Glen Morris Street.
TE12.52adopted
Compulsory Stop Control - Lesmount Avenue at Davies Crescent and Cadorna Avenue at Davies Crescent
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to install a compulsory stop control at the yield-controlled, "T" type intersections of Lesmount Avenue at Davies Crescent and Cadorna Avenue at Davies Crescent. Based on an assessment undertaken, the installation of compulsory stop controls at these intersections is recommended to clearly define the right-of-way and enhance safety for all road users. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the existing parking regulations. Recommendations 5 and 6 will correct this inconsistency.
The Toronto and East York Community Council: 1. Rescinded the existing yield control at the intersection of Lesmount Avenue and Davies Crescent. 2. Rescinded the existing yield control at the intersection of Cadorna Avenue and Davies Crescent. 3. Authorized a compulsory stop control for northbound traffic at the intersection of Lesmount Avenue and Davies Crescent. 4. Authorized a compulsory stop control for northbound traffic at the intersection of Cadorna Avenue and Davies Crescent. 5. Rescinded the parking prohibition on the east side of Lesmount Avenue, between O'Connor Drive and Davies Crescent. 6. Amended the existing parking prohibition on the south side of Davies Crescent, between Donlands Avenue and Cadorna Avenue, to be in effect from Donlands Avenue and Lesmount Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing yield control at the intersection of Lesmount Avenue and Davies Crescent. 2. Toronto and East York Community Council rescind the existing yield control at the intersection of Cadorna Avenue and Davies Crescent. 3. Toronto and East York Community Council authorize a compulsory stop control for northbound traffic at the intersection of Lesmount Avenue and Davies Crescent. 4. Toronto and East York Community Council authorize a compulsory stop control for northbound traffic at the intersection of Cadorna Avenue and Davies Crescent. 5. Toronto and East York Community Council rescind the parking prohibition on the east side of Lesmount Avenue, between O'Connor Drive and Davies Crescent. 6. Toronto and East York Community Council amend the existing parking prohibition on the south side of Davies Crescent, between Donlands Avenue and Cadorna Avenue, to be in effect from Donlands Avenue and Lesmount Avenue.
TE12.53adopted
Traffic Calming (Speed Humps) - Western Battery Road
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the installation of speed humps on Western Battery Road, between East Liberty Street and Pirandello Street. Staff's assessment indicates the criteria as set out in the updated Traffic Calming Policy has been satisfied. Therefore, speed humps should be installed on Western Battery Road between East Liberty Street and Pirandello Street.
The Toronto and East York Community Council: 1. Authorized the installation of speed humps on Western Battery Road, between East Liberty Street and Pirandello Street. 2. Directed the City Solicitor to prepare a By-law to alter the roadway for the installation of three speed humps on Western Battery Road, between East Liberty Street and Pirandello Street, generally as shown on Attachments 2 and 3 to the revised report (March 28, 2024) from the Director, Planning, Design and Management, Transportation Services.
Staff recommendation as filed
The Director, Planning, Design and Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed humps on Western Battery Road, between East Liberty Street and Pirandello Street. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway for the installation of three speed humps on Western Battery Road, between East Liberty Street and Pirandello Street, generally as shown on Attachment 2, Drawing TC-237 dated March 2024, and Attachment 3, Drawing TC-238 dated March 2024, attached to the report entitled "Traffic Calming (Speed Humps) - Western Battery Road" from the Director, Planning, Design and Management, Transportation Services.
TE12.54adopted
Traffic Calming (Speed Humps) - Leroy Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the installation of speed humps on Leroy Avenue, between Memorial Park Avenue and Mortimer Avenue. Staff's assessment indicates the criteria as set out in the updated Traffic Calming Policy has been satisfied. Therefore, speed humps should be installed on Leroy Avenue.
The Toronto and East York Community Council: 1. Authorized the installation of speed humps on Leroy Avenue, between Memorial Park Avenue and Mortimer Avenue. 2. Directed the City Solicitor to prepare a By-law to alter the roadway for the installation of three speed humps on Leroy Avenue, between Memorial Park Avenue and Mortimer Avenue, generally as shown on Attachment 2 to the report (March 14, 2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed humps on Leroy Avenue, between Memorial Park Avenue and Mortimer Avenue. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway for the installation of three speed humps on Leroy Avenue, between Memorial Park Avenue and Mortimer Avenue, generally as shown on Attachment 2, Drawing No. TC-238 dated March 2024, attached to the report entitled "Traffic Calming (Speed Humps) - Leroy Avenue" from the Director, Traffic Management, Transportation Services.
TE12.55adopted
Speed Bumps - Public Lane west of Logan Avenue, north of Colgate Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the installation of speed bumps in the public lane west of Logan Avenue, north of Colgate Avenue, between Paisley Avenue and Colgate Avenue.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the public lane west of Logan Avenue, north of Colgate Avenue, between Paisley Avenue and Colgate Avenue, at the locations shown on Attachment 1 to the report (March 14,2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the public lane west of Logan Avenue, north of Colgate Avenue, between Paisley Avenue and Colgate Avenue, at the locations shown on Attachment 1, Drawing No. TC-236, dated March 2024, attached to the report titled "Speed Bumps - Lane west of Logan Avenue, north of Colgate Avenue" from the Director, Traffic Management, Transportation Services.
TE12.56adopted
Speed Bumps - Thomas McClintock Lane
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the installation of speed bumps in Thomas McClintock Lane, between Ainsworth Road and Antonios Mavrakakis Lane.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in Thomas McClintock Lane, between Ainsworth Road and Antonios Mavrakakis Lane, at the locations shown on Attachment 1 to the report (March 14,2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in Thomas McClintock Lane, between Ainsworth Road and Antonios Mavrakakis Lane, at the locations shown on Attachment 1, Drawing No. TC-228, dated January 2024, attached to the report titled "Speed Bumps - Thomas McClintock Lane" from the Director, Traffic Management, Transportation Services.
TE12.57deferred
Update on the Ontario Line Joint Corridor Noise Barrier and Retaining Walls
As directed by the Toronto and East York Community Council on January 24, 2024 under TE10.40 - Metrolinx's Ontario Line Construction within the Toronto and East York District - First Quarter Update, the purpose of this report is to provide an update on the Lakeshore East Joint Corridor Noise Barrier and Retaining Wall that is currently being constructed by Metrolinx for the Ontario Line and the GO Expansion Program, including the approved designs, known costs, and estimated construction schedule.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the May 7, 2024 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
The Executive Director, Transit Expansion Division, recommends that: 1. Toronto and East York Community Council receive this report for information.
TE12.58adopted
Speed Hump Installation - Sussex Avenue between Spadina Avenue and Robert Street
Residents contacted my office requesting speed humps on Sussex Avenue between Spadina Avenue and Robert Street. Residents have observed a dangerous increase in traffic and illegal speeding on this quiet residential street. The installation of speed humps may assist in mitigating some of the cut-through traffic and make conditions safer for local vulnerable road users.
The Toronto and East York Community Council: 1. Authorized the installation of traffic calming (two speed humps) on Sussex Avenue between Spadina Avenue and Robert Street. 2. Directed the City Solicitor, in consultation with the Director, Traffic Management, Transportation Services, to prepare a By-law to alter sections of the roadway on Sussex Avenue between Spadina Avenue and Robert Street, to install two speed humps, generally as shown on Attachment 1 to the letter (March 14, 2024) from Councillor Dianne Saxe.
Staff recommendation as filed
Councillor Saxe recommends that: 1. Toronto and East York Community Council authorize the installation of traffic calming (two speed humps) on Sussex Avenue between Spadina Avenue and Robert Street. 2. Toronto and East York Community Council direct the City Solicitor, in consultation with the Director, Traffic Management, Transportation Services, to prepare a by-law to alter sections of the roadway on Sussex Avenue between Spadina Avenue and Robert Street, to install two speed humps, generally as shown on Attachment 1.
TE12.59amended
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. RDH Architects Inc has undertaken the construction of a 4-storey University of Toronto student residence at 15 Devonshire Place. In addition, Pomerleau has been retained as the construction manager to construct a new University of Toronto building at 100 Devonshire Place. Both sites are located on Devonshire Place, between Bloor Street West and Hosking Avenue. 15 Devonshire Place (Time Extension and Revisions) At its meeting on January 6, 2022, Toronto and East York Community Council approved the closure of the east sidewalk and a portion of the northbound curb lane from March 31, 2022 to March 31, 2024. As such, Transportation Services is requesting authorization to closure the northbound curb traffic lane on Devonshire Place for a period of 14 months from April 30, 2024 to June 30, 2025 to accommodate construction staging operations. Pedestrian operations on the east side of Devonshire Place will be maintained in a 2.1 metre-wide covered and protected walkway within the closed northbound lane. It should be noted that at the time of the original approval, the developer indicated they would be able to maintain two-way, north-south traffic operation on Devonshire Place. Since then, the developer determined that a larger space would be required in order to proceed with the construction. In addition, the increased footprint of the construction staging area will result in the closure of the northbound traffic lane. Consequently, Devonshire Place, between Bloor Street West and Hoskins Avenue will be temporarily converted to a southbound one-way traffic operation. 100 Devonshire Place Transportation Services is requesting authorization to close the west sidewalk, and the southbound traffic lane on Devonshire Place for a period of 32 months, from April 30, 2024 to December 31, 2026 to facilitate construction staging operations. Pedestrian movements on the west side of Devonshire Place abutting the site will be restricted and pedestrians will be directed to the east sidewalk on Devonshire Place. To provide the extra space needed to facilitate construction staging operations and maintain safe and efficient movement of traffic in the vicinity of the work areas at 15 and 100 Devonshire Place, Devonshire Place will be converted to one-way southbound traffic operations between Bloor Street West and Hoskin Avenue.
The Toronto and East York Community Council: 1. Authorized to the closure of the east sidewalk and the northbound curb lane on Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from April 30, 2024 to June 30, 2025 inclusive. 2. Authorized the closure of the west sidewalk and the west side southbound traffic lane on Devonshire Place, between a point 35 metres south of Bloor Street West and a point 103 metres further south, from April 30, 2024 to December 31, 2026 inclusive. 3. Designated Devonshire Place, between Bloor Street West and Hoskin Avenue, as one-way for southbound traffic only, from April 30, 2024 to December 31, 2026 inclusive. 4. Prohibited westbound right turns at all times at the intersection of Hoskin Avenue at Devonshire Place, from April 30, 2024 to December 31, 2026 inclusive. 5. Prohibited eastbound left turns at all times at the intersection of Hoskin Avenue at Devonshire Place, from April 30, 2024 to December 31, 2026 inclusive. 6. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and maximum period of 3 hours on, the east side of Devonshire Place, between Bloor Street West and a point 117 metres south. 7. Prohibited stopping at all times on the east side of Devonshire Place, between Bloor Street West and a point 117 metres south. 8. Continued to amend the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between Hoskin Avenue and Bloor Street West, to be in effect between Hoskin Avenue and a point 120 metres north. 9. Continued to authorize parking machines in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between a point 180 metres north of Hoskin Avenue and Bloor Street West. 10. Continued to prohibit stopping at all times on the east side of Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north. 11. Continued directing the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe. 12. Directed the applicant to maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 13. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 14. Directed the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 15. Directed the applicant to install appropriate signage and request the applicant to maintain all sight lines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 16. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 17. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 19. Directed the applicant post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 20. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 21. Directed the applicant to provide and install public art, including mural artwork, on sections of the of the elevated hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Council. 22. Continued to direct that Devonshire Place be returned to its pre-construction traffic and parking regulations when the project is complete. 23. Directed the applicant to provide monthly community meetings, when there are major changes to the development or impacts to the public right-of-way and address any concerns concerns raised by the community.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize to the closure of the east sidewalk and the northbound curb lane on Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from April 30, 2024 to June 30, 2025 inclusive. 2. Toronto and East York Community Council authorize the closure of the west sidewalk and the west side southbound traffic lane on Devonshire Place, between a point 35 metres south of Bloor Street West and a point 103 metres further south, from April 30, 2024 to December 31, 2026 inclusive. 3. Toronto and East York Community Council designate Devonshire Place, between Bloor Street West and Hoskin Avenue, as one-way for southbound traffic only, from April 30, 2024 to December 31, 2026 inclusive. 4. Toronto and East York Community Council prohibit westbound right turns at all times at the intersection of Hoskin Avenue at Devonshire Place, from April 30, 2024 to December 31, 2026 inclusive. 5. Toronto and East York Community Council prohibit eastbound left turns at all times at the intersection of Hoskin Avenue at Devonshire Place, from April 30, 2024 to December 31, 2026 inclusive. 6. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and maximum period of 3 hours on, the east side of Devonshire Place, between Bloor Street West and a point 117 metres south. 7. Toronto and East York Community Council rescind the existing passenger loading zone regulation in effect anytime from July 9, 2015 to August 16, 2015, inclusive (Games Client Vehicles only) on both sides of Devonshire Place, between Bloor Street West and a point 117 metres south. 8. Toronto and East York Community Council prohibit stopping at all times on the east side of Devonshire Place, between Bloor Street West and a point 117 metres south. 9. Toronto and East York Community Council continue to amend the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between Hoskin Avenue and Bloor Street West, to be in effect between Hoskin Avenue and a point 120 metres north. 10. Toronto and East York Community Council continue to authorize parking machines in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, at a rate of $5.25 per hour and for a maximum period of 3 hours, on the east side of Devonshire Place, between a point 180 metres north of Hoskin Avenue and Bloor Street West. 11. Toronto and East York Community Council continue to prohibit stopping at all times on the east side of Devonshire Place, between a point 120 metres north of Hoskin Avenue and a point 60 metres further north. 12. Toronto and East York Community Council to continue directing the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe. 13. Toronto and East York Community Council direct the applicant to maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 14. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 15. Toronto and East York Community Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 16. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to maintain all sight lines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 17. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 18. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 19. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 20. Toronto and East York Community Council direct the applicant post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 22. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 23. Toronto and East York Community Council continue to direct that Devonshire Place be returned to its pre-construction traffic and parking regulations when the project is complete. 24. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
TE12.60adopted
2 Sussex Avenue - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Urbacon Buildings Group Inc. is constructing a four-storey addition to an existing institutional building at 2 Sussex Avenue. The site is located on the north-west corner of Sussex Avenue and St. George Street. Transportation Services is requesting approval to close a portion of the north-south public laneway, abutting the site for a period of 18 months, from March 31, 2024 to September 30, 2025 to facilitate construction staging operations. The construction staging area will result in the loss of two on-street parking machine spaces on the west side of St. George Street.
The Toronto and East York Community Council: 1. Authorized the closure of a 1.8 metre wide portion of the north-south public laneway (west of St. George Street), between a point 24 metres north of Sussex Avenue and a point 36 metres further north, from March 31, 2024 to September 30, 2025, inclusive to accommodate construction staging operations. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday.; 1:00 p.m. to 9:00 p.m. Sunday, for maximum period of 3 hours, on the west side of St. George Street, between a point 54.5 metres north of Sussex Avenue and a point 12 metres north. 3. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 6. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 12. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 13. Directed that the public laneway and St. George Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of a 1.8 metre wide portion of the north-south public laneway (west of St. George Street), between a point 24 metres north of Sussex Avenue and a point 36 metres further north, from March 31, 2024 to September 30, 2025, inclusive to accommodate construction staging operations. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday.; 1:00 p.m. to 9:00 p.m. Sunday, for maximum period of 3 hours, on the west side of St. George Street, between a point 54.5 metres north of Sussex Avenue and a point 12 metres north. 3. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 6. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 12. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work. 13. Toronto and East York Community Council direct that the public laneway and St. George Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
TE12.61adopted
Parking Amendments - Aldwych Avenue
Residents on Aldwych Avenue have reached out to my office about safety issues caused by parked vehicles east of Pape Avenue. Extending the corner prohibition is the staff recommended solution and would enhance sightlines for drivers at this intersection. I am asking for your support for this motion to improve sightlines and reduce conflicts with turning vehicles.
The Toronto and East York Community Council: 1. Prohibited standing at all times, on the south side of Aldwych Avenue, between Pape Avenue and a point 29 metres east. 2. Amended the existing parking prohibition in effect at all times during the months of January, February, March, April, June, August, October and December, on the south side of Aldwych Avenue between Donlands Avenue and Pape Avenue, to be in effect between Donlands Avenue and a point 29 metres west of Pape Avenue. 3. Rescinded the existing parking prohibition in effect at all times on the north side of Aldwych Avenue, between a point 24.5 metres east of Pape Avenue and a point 52 metres east of Pape Avenue.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council prohibit standing at all times, on the south side of Aldwych Avenue, between Pape Avenue and a point 29 metres east. 2. Toronto and East York Community Council amend the existing parking prohibition in effect at all times during the months of January, February, March, April, June, August, October and December, on the south side of Aldwych Avenue between Donlands Avenue and Pape Avenue, to be in effect between Donlands Avenue and a point 29 metres west of Pape Avenue. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the north side of Aldwych Avenue, between a point 24.5 metres east of Pape Avenue and a point 52 metres east of Pape Avenue.
TE12.62adopted
Speed Humps on Greenwood Avenue between Plains Road and Cosburn Avenue
Residents of Greenwood Avenue between Plains Road and Cosburn Avenue have voted 86 percent in favour of speed hump installation. These traffic calming measures would enhance safe traffic flow for residents as drivers utilize this street to access busier streets such as O'Connor Drive (north of Plains Road) and Cosburn Avenue (south of Plains Road).
The Toronto and East York Community Council: 1. Authorized the installation of traffic calming (speed humps) on Greenwood Avenue between Plains Road and Cosburn Avenue. 2. Directed the City Solicitor to prepare a By-law to alter the roadway to install three speed humps on Greenwood Avenue between Plains Road and Cosburn Avenue, generally as shown on Attachment 1 to the letter (March 26, 2024) from Councillor Paula Fletcher.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council authorize the installation of traffic calming (speed humps) on Greenwood Avenue between Plains Road and Cosburn Avenue. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Greenwood Avenue between Plains Road and Cosburn Avenue, generally as shown on the attached Drawing No. TC-226, dated January 2024 from the Director, Traffic Management, Transportation Services.
TE12.63adopted
All-Way stop sign control and Parking Amendments - Gledhill Avenue
My office attended a safety walkabout with the school administrators at D.A Morrison Middle School to discuss student and pedestrian safety around the school. The intersection of Gledhill Avenue and Barker Avenue was flagged as an issue, due to the lack of all-way stop control, and crosswalk infrastructure. Therefor, I recommend the following changes:
The Toronto and East York Community Council: 1. Authorized an all-way compulsory stop control at the intersection of Gledhill Avenue and Barker Avenue. 2. Amended the existing maximum 10-minute parking regulation in effect 8:30 a.m. to 9:00 a.m., 2:30 p.m. to 3:30 p.m., Monday to Friday, on the east side of Gledhill Avenue between a point opposite Barker Avenue and a point 28 metres north, to be in effect between a point 15 meters south of Barker Avenue and a point 28 metres further south. 3. Amended the existing parking prohibition in effect from 9:00 a.m. to 2:30 p.m., 3:30 p.m. of one day to 8:30 a.m. of the next following day, Monday to Friday; Anytime, Saturday, Sunday, and public holidays, on the east side of Gledhill Avenue between Barker Avenue and a point 28 metres north, to be in effect between a point 15 meters south of Barker Avenue and a point 28 metres further south. 4. Amended the existing parking prohibition in effect at all times, on the east side of Gledhill Avenue between a point 28 metres north of Barker Avenue and Cosburn Avenue, to be in effect between a point 15 metres north of Barker Avenue and Cosburn Avenue. 5. Prohibited stopping at all times on the east side of Gledhill Avenue, between a point 15 meters north of Barker Avenue and a point 15 meters south of Barker Avenue. 6. Amended the existing school bus loading zone in effect from 8:00 a.m. to 5:00 p.m. on the east side of Gledhill Avenue, between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north. 7. Amended the existing stopping prohibition in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, except public holidays, between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north. 8. Rescinded the existing parking prohibition in effect at all times, on the east side of Gledhill Avenue between Lumsden Avenue and a point 65 metres north. 9. Amended the existing parking prohibition in effect from 5:00 p.m. of one day to 8:00 a.m. of the next following day, Monday to Friday; Anytime, Saturday, Sunday, and public holidays, on the east side of Gledhill Avenue between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Gledhill Avenue and Barker Avenue. 2. Toronto and East York Community Council amend the existing maximum 10-minute parking regulation in effect 8:30 a.m. to 9:00 a.m., 2:30 p.m. to 3:30 p.m., Monday to Friday, on the east side of Gledhill Avenue between a point opposite Barker Avenue and a point 28 metres north, to be in effect between a point 15 meters south of Barker Avenue and a point 28 metres further south. 3. Toronto and East York Community Council amend the existing parking prohibition in effect from 9:00 a.m. to 2:30 p.m., 3:30 p.m. of one day to 8:30 a.m. of the next following day, Monday to Friday; Anytime, Saturday, Sunday, and public holidays, on the east side of Gledhill Avenue between Barker Avenue and a point 28 metres north, to be in effect between a point 15 meters south of Barker Avenue and a point 28 metres further south. 4. Toronto and East York Community Council amend the existing parking prohibition in effect at all times, on the east side of Gledhill Avenue between a point 28 metres north of Barker Avenue and Cosburn Avenue, to be in effect between a point 15 metres north of Barker Avenue and Cosburn Avenue. 5. Toronto and East York Community Council prohibit stopping at all times on the east side of Gledhill Avenue, between a point 15 meters north of Barker Avenue and a point 15 meters south of Barker Avenue. 6. Toronto and East York Community Council amend the existing school bus loading zone in effect from 8:00 a.m. to 5:00 p.m. on the east side of Gledhill Avenue, between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north. 7. Toronto and East York Community Council amend the existing stopping prohibition in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, except public holidays, between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north. 8. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the east side of Gledhill Avenue between Lumsden Avenue and a point 65 metres north. 9. Toronto and East York Community Council amend the existing parking prohibition in effect from 5:00 p.m. of one day to 8:00 a.m. of the next following day, Monday to Friday; Anytime, Saturday, Sunday, and public holidays, on the east side of Gledhill Avenue between a point 65 metres north of Lumsden Avenue and Barker Avenue, to be in effect between a point 30.5 metres north of Lumsden Avenue and a point 106.5 meters further north.
TE12.64adopted
Traffic Calming - Glebemount Avenue, between O’Connor Drive and Plains Road
My office has heard from residents on Glebemount Avenue, between O'Connor Drive and Plains Road, about speeding vehicles in their community. They would like speed humps installed on their street.
The Toronto and East York Community Council : 1. Authorized the installation of traffic calming (speed humps) on Glebemount Avenue, between O'Connor Drive and Plains Road. 2. Directed the City Solicitor to prepare a By-law to alter the roadway to install three speed humps on Glebemount Avenue, between O'Connor Drive and Plains Road, generally as shown on Attachment 1 to the letter (April 2, 2024) from Councillor Brad Bradford.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize the installation of traffic calming (speed humps) on Glebemount Avenue, between O'Connor Drive and Plains Road. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Glebemount Avenue, between O'Connor Drive and Plains Road, generally as shown on the attached Drawing No. TC-254, dated March 2024 from the Director, Traffic Management, Transportation Services.
TE12.65adopted
Traffic Calming - Glenburn Avenue between Peard Road and Furnival Road
My office has heard from residents on Glenburn Avenue, between Peard Road and Furnival Road, about speeding vehicles in their community. They would like speed humps installed on their street.
The Toronto and East York Community Council: 1. Authorized the installation of traffic calming (speed humps) on Glenburn Avenue between Peard Road and Furnival Road. 2. Directed the City Solicitor to prepare a By-law to alter the roadway to install two speed humps on Glenburn Avenue between Peard Road and Furnival Road, generally as shown on Attachment 1 to the letter (March 26, 2024) from Councillor Brad Bradford.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize the installation of traffic calming (speed humps) on Glenburn Avenue between Peard Road and Furnival Road. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install two speed humps on Glenburn Avenue between Peard Road and Furnival Road., generally as shown on Drawing No. TC-245, dated March 2024, attached to the letter entitled "Traffic Calming - Glenburn Avenue between Peard Road and Furnival Road".
TE12.66adopted
Ambassador Pizza (946 Bloor Street West) - Exemption of Polling Requirements under Chapter 742
Ambassador Pizza, located at 946 Bloor Street West, opened shop as a small pizza pick-up location in our Bloorcourt Village area in early 2021. Ambassador Pizza's success and strong local support resulted in their expansion to the connecting property with investments in beautifying an existing sidewalk café patio, which has been in place since 2014. Since its opening and expansion, Ambassador Pizza has contributed significantly to the vibrancy and growth of the area. They have served as an important partner in providing free meals to agencies and groups servicing unhoused residents - speaking to their commitment to the wider community. Ambassador Pizza received notice in late 2023 that the sidewalk patio they inherited that same year was not permitted. The owners have actively worked with City staff and my office to secure the proper permits to operate, including by removing structures not in compliance with patio rules. Given the circumstances of this unique challenge and Ambassador Pizza's continued cooperation, it is vital we support this local business as patio season nears.
The Toronto and East York Community Council recommends that: 1. When Ambassador Pizza applies for a sidewalk café permit for the 2024 summer café season in relation to the establishment at 946 Bloor Street West, City Council exempt that application from the notice requirements in section 742-2.3 and the objection provisions in sections 742-3.2A(2) and 742-4.3B(2) in City of Toronto Municipal Code Chapter 742, Sidewalk Cafes, Parklets and Marketing Displays.
Staff recommendation as filed
Councillor Alejandra Bravo recommends: 1. When Ambassador Pizza applies for a sidewalk café permit for the 2024 summer café season in relation to the establishment at 946 Bloor Street West, City Council exempt that application from the notice requirements in section 742-2.3 and the objection provisions in sections 742-3.2A(2) and 742-4.3B(2) in City of Toronto Municipal Code Chapter 742, Sidewalk Cafes, Parklets and Marketing Displays.
TE12.67adopted
Establishing a Community Safety Zone on Blake Street
Blake Street, between Strathcona Avenue and Boultbee Avenue, is a residential street with two schools, a community centre and near each other. The residents who live on Blake Street are concerned about the volume of traffic and speeding along their residential street. Many children and parents utilize it often to either travel north to Earl Grey Senior Public or south to Blake Street Junior Public School. Additionally, I hope you support my recommendation to move the Automated Speed Enforcement (ASE) from Strathcona west of Blake Street, to a location on Blake Street once it is designated as a Community Safety Zone. The implementation of a community safety zone and installation of an ASE will help improve traffic and pedestrian safety on Blake Street. I hope you will support my recommendation.
The Toronto and East York Community Council recommends that: 1. City Council designate a Community Safety Zone in effect at all times, on both sides of Blake Street, between Strathcona Avenue and Boultbee Avenue. 2. City Council request the General Manager, Transportation Services to consider moving the Automated Speed Camera from Strathcona west of Blake Street to a location on Blake Street, or for Blake Street to be added to the next round of Automated Speed Enforcement locations.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. City Council designate a Community Safety Zone in effect at all times, on both sides of Blake Street, between Strathcona Avenue and Boultbee Avenue. 2. City Council request the General Manager, Transportation Services to consider moving the Automated Speed Camera from Strathcona west of Blake Street to a location on Blake Street, or for Blake Street to be added to the next round of Automated Speed Enforcement locations.
TE12.68adopted
415 Broadview: Permit Parking and Transportation Issues
At the March 20th, 2024 meeting of City Council we adopted item CC16.5 - 415 Broadview Avenue - Official Plan and Zoning By-law Amendment - Request for Direction Report related to an ongoing OLT appeal at 415 Broadview Avenue. Most of the direction was provided by City Council at that time, however should the development proceed, Transportation Services should report on the permit parking impacts and whether the development at 415 Broadview should be excluded from the permit parking area. I am also asking for this report to be considered alongside other traffic and transportation reports for this development.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services to examine and report to the Toronto and East York Community Council after the Zoning By-law Amendment has come into full force and effect, regarding the realignment of the applicable Permit Parking Area and the exclusion of 415 Broadview Avenue and associated addresses, from the permit parking area. 2. Requested the General Manager, Transportation Services to ensure that the report referenced in Part 1 above is submitted to the same meeting as the report referenced in the following Part 6 of Item 2024.CC16.5: 6. City Council direct the General Manager, Transportation Services to report to Toronto and East York Community Council to reconfigure the portion of Simpson Avenue adjacent to the subject site to allow two-way traffic.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council request the General Manager, Transportation Services to examine and report to Toronto and East York Community Council after the Zoning By-law Amendment has come into full force and effect, regarding the realignment of the applicable Permit Parking Area and the exclusion of 415 Broadview Avenue and associated addresses, from the permit parking area. 2. Toronto and East York Community Council request the General Manager, Transportation Services, to ensure that the report referenced in recommendation 1 of this letter reports to the same meeting as the report referenced in Item CC16,5, recommendation 6: 6. City Council direct the General Manager, Transportation Services to report to Toronto and East York Community Council to reconfigure the portion of Simpson Avenue adjacent to the subject site to allow two-way traffic.
TE12.69adopted
Parking Amendments - Boulton Avenue (Dundas Junior Public School)
Parking amendments are recommended on Boulton Avenue with respect to the City-wide review of impacts from changes to school operating times directed through IE12.15 . Since June 2020 when these changes were implemented - Dundas Junior Public School staff, TDSB Trustee Ehrhardt, and affected parents have expressed safety concerns regarding the signage on Boulton Avenue, south of Dundas Street East. Transportation staff recommends the following amendments to alleviate traffic and ensure safe pick up and drop off for students, parents, school bus drivers, and residents alike.
Toronto and East York Community Council: 1. Amended the existing school bus loading zone, in effect from 8:30 a.m. to 4:00 p.m., Monday to Friday, from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, between a point 30.5 metres to south of Dundas Street East and a point 53.5 metres further south, to be in effect from 8:30 a.m. to 4:00 p.m., Monday to Friday, except public holidays, from September 1 of one year to June 30 of the next following year, inclusive, between a point 30.5 metres south of Dundas Street East and a point 28 metres further south. 2. Amended the existing maximum 10-minute parking regulation, in effect from 8:30 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, between a point 84 metres south of Dundas Street East and a point 41.5 metres further south, to be in effect from 8:30 a.m. to 9:00 a.m. and 2:30 p.m. to 3:00 p.m., Monday to Friday, except public holidays from September 1 of one year to June 30 of the next following year, inclusive, between a point 58.5 metres south of Dundas Street East and a point 25.5 metres further south. 3. Amended the existing parking prohibition, in effect from 9:00 a.m. to 3:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, from a point 84 metres south of Dundas Street East and a point 41.5 metres further south, to be in effect from 9:00 a.m. to 2:30p.m., Monday to Friday, except public holidays from September 1 of one year to June 30 of the next following year, inclusive, between a point 58.5 metres south of Dundas Street East and a point 25.5 metres further south. 4. Amended the existing maximum one-hour parking regulation in effect from 10:00 a.m. to 10:00 p.m., Monday to Saturday, on the west side of Boulton Avenue, between a point 36.9 metres north of Clark Street and a point 125.5 metres south of Dundas Street East, to be in effect from a point 36.9 metres north of Clark Street and a point 84 metres south of Dundas Street East. 5. Rescinded the existing passenger loading zone, in effect from 8:30 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, for a maximum period of 10 minutes on the west side of Boulton Avenue, between a point 84 metres south of Dundas Street East and a point 41.5 metres further south. 6. Directed the General Manager, Transportation Services to give notice and report to the May 7, 2024 meeting of the Toronto and East York Community Council with changes to the permit parking times on Boulton to align with the changes in Parts 1 to 5 above.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council amend the existing school bus loading zone, in effect from 8:30 a.m. to 4:00 p.m., Monday to Friday, from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, between a point 30.5 metres to south of Dundas Street East and a point 53.5 metres further south, to be in effect from 8:30 a.m. to 4:00 p.m., Monday to Friday, except public holidays, from September 1 of one year to June 30 of the next following year, inclusive, between a point 30.5 metres south of Dundas Street East and a point 28 metres further south. 2. Toronto and East York Community Council amend the existing maximum 10-minute parking regulation, in effect from 8:30 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, between a point 84 metres south of Dundas Street East and a point 41.5 metres further south, to be in effect from 8:30 a.m. to 9:00 a.m. and 2:30 p.m. to 3:00 p.m., Monday to Friday, except public holidays from September 1 of one year to June 30 of the next following year, inclusive, between a point 58.5 metres south of Dundas Street East and a point 25.5 metres further south. 3. Toronto and East York Community Council amend the existing parking prohibition, in effect from 9:00 a.m. to 3:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, on the west side of Boulton Avenue, from a point 84 metres south of Dundas Street East and a point 41.5 metres further south, to be in effect from 9:00 a.m. to 2:30p.m., Monday to Friday, except public holidays from September 1 of one year to June 30 of the next following year, inclusive, between a point 58.5 metres south of Dundas Street East and a point 25.5 metres further south. 4. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 10:00 a.m. to 10:00 p.m., Monday to Saturday, on the west side of Boulton Avenue, between a point 36.9 metres north of Clark Street and a point 125.5 metres south of Dundas Street East, to be in effect from a point 36.9 metres north of Clark Street and a point 84 metres south of Dundas Street East. 5. Toronto and East York Community Council rescind the existing passenger loading zone, in effect from 8:30 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday from September 1 of one year to June 30 of the next following year, inclusive, for a maximum period of 10 minutes on the west side of Boulton Avenue, between a point 84 metres south of Dundas Street East and a point 41.5 metres further south. 6. Toronto and East York Community direct the General Manager, Transportation Services, to give notice and report to the May 7th meeting of TEYCC with changes to the permit parking times on Boulton to align with the changes in this letter.
TE12.70adopted
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to temporarily close and amend the necessary traffic regulations on Bremner Boulevard between Lake Shore Boulevard West to a point east of the parking garage accesses servicing 15 and 25 York Street respectively, from Tuesday, April 9, 2024 to Tuesday, June 25, 2024 to facilitate the Maple Leafs Sports and Entertainment's viewing area for the Toronto Maple Leafs and Toronto Raptors 2024 playoff season.
The Toronto and East York Community Council: 1. Authorized the General Manager, Transportation Services to temporarily close Bremner Boulevard between Lake Shore Boulevard West to the east side of the parking garage accesses servicing 15 and 25 York Street respectively, from Tuesday, April 9, 2024 to Tuesday, June 25, 2024 or the date the last team is eliminated, to facilitate Maple Leafs Sports and Entertainment's viewing area during the Toronto Maple Leafs and Toronto Raptors 2024 playoff season and to amend the necessary traffic regulations. 2. Authorized and directed the appropriate City Officials to take the necessary action to give effect to Toronto and East York Community Council's decision, including the introduction of any Bills that may be required.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the General Manager of Transportation Services to temporarily close Bremner Boulevard between Lake Shore Boulevard West to the east side of the parking garage accesses servicing 15 and 25 York Street respectively, from Tuesday, April 9, 2024 to Tuesday, June 25, 2024 or the date the last team is eliminated, to facilitate Maple Leafs Sports and Entertainment's viewing area during the Toronto Maple Leafs and Toronto Raptors 2024 playoff season and to amend the necessary traffic regulations; and 2. Toronto and East York Community Council authorize and direct the appropriate City Officials to take the necessary action to give effect thereto, including the introduction of any Bills that may be required.
TE12.71amended
Speed Limit Reduction - East Liberty Street
East Liberty Street is classified as a collector road. The other two collector roads in the neighbourhood, Atlantic Avenue, between King Street West and Liberty Street, and Liberty Street, both have a speed limit of 30 km/h. In order to have a consistent speed limit within Liberty Village and to improve safety for all road users, it is recommended that the speed limit be reduced from 40km/h to 30km/h.
The Toronto and East York Community Council: 1. Reduced the speed limit from 40 kilometres per hour to 30 kilometres per hour on East Liberty Street between Hanna Avenue and Strachan Avenue.
Staff recommendation as filed
It is recommended that: 1. Toronto & East York Community Council reduce the speed limit from 40 km/h to 30 km/h on East Liberty Street.
TE12.72amended
Residential Demolition Application - 449 and 451 Montrose Avenue
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council make a final decision. In accordance with city-wide residential demolition control under the Toronto Municipal Code Ch.363, under the authority of Section 33 of the Planning Act, the applications for the demolition of the existing two-storey single family semi-detached houses at 449 and 451 Montrose Avenue (Applications No. 24-106459 DEM 00 DM and 24-106394 DEM 00 DM) are being referred to the Toronto and East York Community Council for consideration to refuse or grant the application, including any conditions, if any, to be attached to the permit applications because a building permit has not yet been issued for replacement buildings.
The Toronto and East York Community Council: 1. Approved the applications to demolish the existing two-storey single family semi-detached houses and detached garage buildings at 449 and 451 Montrose Avenue with the following conditions: a. that construction fences be erected in accordance with the provisions of the Municipal Code, Chapter 363, Article III, if deemed appropriate by the Chief Building Official and Executive Director, Toronto Building; b. that all debris and rubble be removed immediately after demolition; c. that sod be laid on the site and be maintained free of garbage and weeds, in accordance with the Municipal Code Chapter 629-10, paragraph B and 629-11; and d. that any holes on the property are backfilled with clean fill.
Staff recommendation as filed
The Director and Deputy Chief Building Official, Toronto Building, Toronto and East York District recommends that the Toronto and East York Community Council give consideration to the demolition applications for 449 and 451 Montrose Avenue, and decide to: 1. Refuse the applications to demolish the existing two-storey single family semi-detached houses and detached garage buildings at 449 and 451 Montrose Avenue because there is no permit to replace the buildings on the site at this time; or 2. Approve the applications to demolish the existing two-storey single family semi-detached houses and detached garage buildings at 449 and 451 Montrose Avenue without any conditions; or 3. Approve the applications to demolish the existing two-storey single family semi-detached houses and detached garage buildings at 449 and 451 Montrose Avenue with the following conditions: a. That construction fences be erected in accordance with the provisions of the Municipal Code, Chapter 363, Article III, if deemed appropriate by the Chief Building Official; b. That all debris and rubble be removed immediately after demolition; c. That sod be laid on the site and be maintained free of garbage and weeds, in accordance with the Municipal Code Chapter 629-10, paragraph B and 629-11; and, d. That any holes on the property are backfilled with clean fill.
TE12.73adopted
Toronto and East York Community Council will introduce bills.
General Bills: Toronto and East York Community Council enacted By-laws 304-2024 to 314-2024. Confirmatory Bill: Toronto and East York Community Council passed a Confirmatory Bill as By-law 315-2024.