The Public GalleryToronto

Bid Award Panel · 2022-12-21 · 2023.BA6.10

The filed record

Award of Ariba Document Number 3722909802 to IBI Group Professional Services (Canada) Inc. for the Consult, Design, and Support Installation of a Bikeway Extension on the Bloor-Danforth-Kingston Corridor for Transportation Services

The Public Gallery wrote no story on this item. What follows is the city’s own record of what happened to it, as filed: nothing on this page is summarised or scored by us.

The decision

2022-12-21 · Bid Award Panel · adopted

As filed

The Bid Award Panel adopted the following: 1. Bid Award Panel grant authority to award the contract in accordance with the Contract Details set out in the report (December 13, 2022) from the Chief Procurement Officer: Solicitation Number: Request for Proposal, Ariba Document Number 3722909802 and Contract Number R-TS-2022-C08-01 under Category 8 of the Prequalified Vendor Lists for the delivery of Professional Engineering and Architectural Consulting Services Request for Supplier Qualification Ariba Document Number 3279961432.

Show the rest of As filed, 1,079 more characters as filed

Description: For Preliminary design, detailed design and installation plans, support consultation, aid in the preparation of the supply/installation tender(s) and contract administration of two quick-build cycling projects: Danforth Avenue-Kingston Road Bikeway Extension and Bloor Street West Bikeway Extension between 2023 and 2025. Recommended Supplier: IBI Group Professional Services (Canada) Inc. Contract Award Value: $ 3,810,458 net of all applicable taxes and charges $ 4,305,818 including HST and all applicable charges $ 3,877,522 net of HST recoveries The Contract is expected to start on January 1, 2023 and end on December 31, 2025. The total potential contract award identified in this report $3,810,458 including all applicable taxes and charges and $4,305,818 including HST and all applicable charges. The cost to the City is $3,877,522 net of HST recoveries. The above cost calculations reflect an estimated five (5) percent Architectural, Engineering and Related Services Price Index (AESPI) increase applied annually to the annual cost after the initial year.

On the agenda

As the city filed it

Solicitation Issued: November 7, 2022 Solicitation Closed: November 30, 2022 Number of Addenda Issued: Four (4) Number of Bids: Two (2) Table 2: Summary of Bids Received Supplier Name IBI Group Professional Services (Canada) Inc.* WSP Canada Inc. * Pursuant to the Request for Proposal document the contract award value includes contingency.

Staff recommended

The Acting Chief Procurement Officer recommends that the Bid Award Panel grant authority to award the following contract: Solicitation Number: Request for Proposal, Ariba Document Number 3722909802 and Contract Number R-TS-2022-C08-01 under Category 8 of the Prequalified Vendor Lists for the delivery of Professional Engineering and Architectural Consulting Services Request for Supplier Qualification Ariba Document Number 3279961432.

Show the rest of Staff recommended, 1,079 more characters as filed

Description: For Preliminary design, detailed design and installation plans, support consultation, aid in the preparation of the supply/installation tender(s) and contract administration of two quick-build cycling projects: Danforth Avenue-Kingston Road Bikeway Extension and Bloor Street West Bikeway Extension between 2023 and 2025. Recommended Supplier: IBI Group Professional Services (Canada) Inc. Contract Award Value: $ 3,810,458 net of all applicable taxes and charges $ 4,305,818 including HST and all applicable charges $ 3,877,522 net of HST recoveries The Contract is expected to start on January 1, 2023 and end on December 31, 2025. The total potential contract award identified in this report $3,810,458 including all applicable taxes and charges and $4,305,818 including HST and all applicable charges. The cost to the City is $3,877,522 net of HST recoveries. The above cost calculations reflect an estimated five (5) percent Architectural, Engineering and Related Services Price Index (AESPI) increase applied annually to the annual cost after the initial year.

    On the record

    The item as the City filed it

    More from this meeting

    The whole meeting