All 58 items in the clerk’s order. Each carries the city’s own words: the staff recommendation, what the body decided, and its status. Nothing below is written by us.
Items 26 to 50 of 58Show 2550100all
TE25.26amended
Construction Staging Area - 1998-2000 Bathurst Street
This staff report is about a matter that Community Council has delegated authority to make a final. 59 Project Management is constructing a six-storey rental residential development with 54 units and two levels of underground parking, at 1998-2000 Bathurst Street. The site is located on Bathurst Street, mid-block between Eglinton Avenue West and Dewbourne Avenue. Transportation Services is requesting authorization to close a 1.8-meter-wide portion of the northbound curb lane on the first lane west of Bathurst Street north of Dewbourne Avenue, between a point 52 metres north of Dewbourne Avenue and a point 41 metres further north, for a period of 22 months (i.e., June 1, 2021 to March 30, 2023) to accommodate a construction staging area. Dewbourne Avenue between Bathurst Street and Peveril Hill North is currently designated for westbound traffic only, and therefore construction traffic exiting the laneway would be required to travel though the community to access the arterial roads in the area. To avoid this scenario, Transportation Services is proposing that Dewbourne Avenue be temporarily converted to allow for two-way traffic. Therefore, construction traffic exiting the laneway will be directed back out to Bathurst Street via Dewbourne Avenue.
The Toronto and East York Community Council: 1. Authorized the closure of a 1.8-meter-wide portion of the northbound curb lane on the first lane west of Bathurst Street north of Dewbourne Avenue, between a point 52 metres north of Dewbourne Avenue and a point 41 metres further north, from, June 1, 2021 to March 30, 2023. 2. Approved the implementation of two-way traffic operations on Dewbourne Avenue, between Bathurst Street and Peveril Hill North. 3. Amended the existing parking prohibition in effect from 9:15 a.m. to 11:15 a.m., 1:15 p.m. to 3:15 p.m., 3:45 p.m. to 6:00 p.m., Monday to Friday; 8:30 a.m. to 10:00 a.m., 4:00 p.m. to 6:00 p.m., Saturday and 8:30 a.m. to 6:00 p.m., Sunday, on the south side of Dewbourne Avenue, between a point 15 metres east of Peveril Hill North and Bathurst Street, to be in effect between a point 15 metres east of Peveril Hill North and a point 43.5 metres west of Bathurst Street. 4. Amended the existing maximum 15-minute parking regulation in effect 8:30 a.m. to 9:15 a.m., 11:15 a.m. to 1:15 p.m., 3:15 p.m. to 3:45 p.m., Monday to Friday on the south side of Dewbourne Avenue, between a point 15 metres east of Peveril Hill North and Bathurst Street, to be in effect between a point 15 metres east of Peveril Hill North and a point 43.5 metres west of Bathurst Street. 5. Prohibited stopping at all times on the south side of Dewbourne Avenue between Bathurst Street and a point 43.5 metres west. 6. Amended the existing parking prohibition in effect at all times on the north side of Dewbourne Avenue, between Strathearn Road and Bathurst Street to be in effect from Strathearn Road and a point 37 metres west of Bathurst Street. 7. Prohibited stopping at all times on the north side of Dewbourne Avenue between Bathurst Street and a point 37 metres west. 8. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Directed that Dewbourne Avenue be returned to pre-construction traffic and parking regulations when the project is complete. 17. Directed the applicant to participate in a Community Construction Liaison Committee (CCLC) that is organized by the Ward Councillor and meets monthly, and invite local stakeholders, including but not limited to adjacent neighbours on Peveril Hill North, Transportation Services, Municipal Licensing and Standards, Toronto Building or any other relevant groups identified through the Community Construction Liaison Committee (CCLC) meetings.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of a 1.8-meter-wide portion of the northbound curb lane on the first lane west of Bathurst Street north of Dewbourne Avenue, between a point 52 metres north of Dewbourne Avenue and a point 41 metres further north, from, June 1, 2021 to March 30, 2023. 2. Toronto and East York Community Council approve the implementation of two-way traffic operations on Dewbourne Avenue, between Bathurst Street and Peveril Hill North. 3. Toronto and East York Community Council amend the existing parking prohibition in effect from 9:15 a.m. to 11:15 a.m., 1:15 p.m. to 3:15 p.m., 3:45 p.m. to 6:00 p.m., Monday to Friday; 8:30 a.m. to 10:00 a.m., 4:00 p.m. to 6:00 p.m., Saturday and 8:30 a.m. to 6:00 p.m., Sunday, on the south side of Dewbourne Avenue, between a point 15 metres east of Peveril Hill North and Bathurst Street, to be in effect between a point 15 metres east of Peveril Hill North and a point 43.5 metres west of Bathurst Street. 4. Toronto and East York Community Council amend the existing maximum 15-minute parking regulation in effect 8:30 a.m. to 9:15 a.m., 11:15 a.m. to 1:15 p.m., 3:15 p.m. to 3:45 p.m., Monday to Friday on the south side of Dewbourne Avenue, between a point 15 metres east of Peveril Hill North and Bathurst Street, to be in effect between a point 15 metres east of Peveril Hill North and a point 43.5 metres west of Bathurst Street. 5. Toronto and East York Community Council prohibit stopping at all times on the south side of Dewbourne Avenue between Bathurst Street and a point 43.5 metres west. 6. Toronto and East York Community Council amend the existing parking prohibition in effect at all times on the north side of Dewbourne Avenue, between Strathearn Road and Bathurst Street to be in effect from Strathearn Road and a point 37 metres west of Bathurst Street. 7. Toronto and East York Community Council prohibit stopping at all times on the north side of Dewbourne Avenue between Bathurst Street and a point 37 metres west. 8. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 10. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Toronto and East York Community Council direct that Dewbourne Avenue be returned to pre-construction traffic and parking regulations when the project is complete.
TE25.27amended
Construction Staging Area - 875 Eglinton Avenue West (Peveril Hill North)
This staff report is about a matter that Community Council has delegated authority to make a final. CentreCourt Development is constructing a 14-storey residential development with 333 units and two levels of underground parking, at 859-861 and 875 Eglinton Avenue West. The site is located on the south side of Eglinton Avenue West between Bathurst Street and Peveril Hill North. Transportation Services is requesting authorization to close the east sidewalk and the entire roadway on Peveril Hill North, between Eglinton Avenue West and a point 40 metres south (to the first laneway south of Eglinton Avenue West), for a period of 27 months (i.e., June 1, 2021 to August 31, 2023) to accommodate a construction staging area. The proposed staging area is similar to the staging area that was in place for the Metrolinx Crosstown Project on Perveril Hill North. Pedestrian operations on the east side of Perveril Hill North will be restricted and pedestrians will be directed to the existing sidewalk on the west side of Peveril Hill North. Pedestrian operations on the south side of Eglinton Avenue West and west side of Bathurst Street, abutting the site will be maintained in 2.1 and 1.7 metre-wide (respectfully) covered and protected walkways within the existing sidewalks. The proposed construction staging area will result in the removal of four parking machine spaces on the west side of Perveril Hill North, immediately south of Eglinton Avenue West.
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and Perveril Hill North in its entirety, between Eglinton Avenue west and a point 40 metres south, from June 1, 2021 to August 31, 2023. 2. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 3. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed that Peveril Hill North be returned to pre-construction traffic regulations when the project is complete. 12. Directed the applicant to participate in a Community Construction Liaison Committee (CCLC) that is organized by the Ward Councillor and meets monthly, and invite local stakeholders, including but not limited to adjacent neighbours on Peveril Hill North, Transportation Services, Municipal Licensing and Standards, Toronto Building or any other relevant groups identified through the Community Construction Liaison Committee (CCLC) meetings.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and Perveril Hill North in its entirety, between Eglinton Avenue west and a point 40 metres south, from June 1, 2021 to August 31, 2023. 2. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 3. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 5. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 6. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community Council direct that Peveril Hill North be returned to pre-construction traffic regulations when the project is complete.
TE25.28adopted
Construction Staging Area - 202-208 St. Clair Avenue West and 2-6 Forest Hill Road
This staff report is about a matter that Community Council has delegated authority to make a final decision. Two Forest Hill Limited Partnership is constructing a nine-storey residential development with 94 units and two levels of underground parking, at 202-208 St. Clair Avenue West and 2-6 Forest Hill Road. The site is located on the northwest corner of St. Clair Avenue West and Forest Hill Road. Transportation Services is requesting authorization to close the west sidewalk on Forest Hill Road, between St. Clair Avenue West and a point 48 metres north, for a period of 34 months (i.e., June 18, 2021 to March 31, 2024) to accommodate a construction staging area. Pedestrian movements on the west side of Forest Hill Road abutting the site will be restricted. A temporary pedestrian walkway along the closed portion of the west sidewalk could not be installed due to insufficient roadway width to maintain both the temporary walkway and two-way traffic operations on Forest Hill Road. Pedestrian operations on the north side of St. Clair Avenue West abutting the site will be maintained in a 1.5-metre-wide covered and protected walkway within the existing sidewalk.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk on Forest Hill Road, between St. Clair Avenue West and a point 48 metres north, from June 18, 2021 to March 31, 2024. 2. Amended the existing parking prohibition in effect at all times on the west side of Forest Hill Road, between a point 41.1 metres north of Lonsdale Road and St. Clair Avenue West to be in effect between a point 41.1 metres north of Lonsdale Road and a point 48 metres north of St. Clair Avenue West. 3. Prohibited stopping at all times on the west side of Forest Hill Road, between St. Clair Avenue West and a point 48 metres north. 4. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Directed that Forest Hill Road be returned to pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk on Forest Hill Road, between St. Clair Avenue West and a point 48 metres north, from June 18, 2021 to March 31, 2024. 2. Toronto and East York Community Council amend the existing parking prohibition in effect at all times on the west side of Forest Hill Road, between a point 41.1 metres north of Lonsdale Road and St. Clair Avenue West to be in effect between a point 41.1 metres north of Lonsdale Road and a point 48 metres north of St. Clair Avenue West. 3. Toronto and East York Community Council prohibit stopping at all times on the west side of Forest Hill Road, between St. Clair Avenue West and a point 48 metres north. 4. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Toronto and East York Community Council direct that Forest Hill Road be returned to pre-construction traffic and parking regulations when the project is complete.
TE25.29adopted
Construction Staging Area - 2112 -2114 Yonge Street (Hillsdale Avenue West)
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. 2114 Yonge Street Incorporated, is constructing a 10-storey residential condominium building with ground floor retail at 2112 -2114 Yonge Street. The site is located on the southwest corner of Yonge Street and Hillsdale Avenue West. Transportation Services is requesting authorization to close the south sidewalk and a 5.2-metre-wide portion of the eastbound curb lane on Hillsdale Avenue West, between Yonge Street and a point 46 metres west, for a period of 19 months (i.e., May 20, 2021 to December 31, 2022) to accommodate a construction staging area. This closure will require Hillsdale Avenue West to operate as one-way eastbound only, abutting the closed portion of the street. Pedestrian movements on the south side of Hillsdale Avenue West abutting the site will be restricted and pedestrians will be directed to the north side sidewalk of Hillsdale Avenue West. In addition, a covered and protected walkway will be installed within the existing sidewalk on the west side of Yonge Street abutting the site.
The Toronto and East York Community Council: 1. Authorized the closure of the south sidewalk and a 5.2-metre-wide portion of the eastbound curb lane on Hillsdale Avenue West, between Yonge Street and a point 46 metres west, from May 20, 2021 to December 31, 2022. 2. Designated Hillsdale Avenue West, between Yonge Street and a point 60 metres west, as one-way for eastbound traffic only at all times. 3. Prohibited southbound right turns and northbound left turns at all times, at the intersection of Yonge Street and Hillsdale Avenue West/Hillsdale Avenue East. 4. Amended the existing parking prohibition in effect at all times on the north side of Hillsdale Avenue West, between Yonge Street and Oriole Parkway, to be in effect from a point 60 metres west of Yonge Street and Oriole Parkway. 5. Prohibited stopping at all times on the north side of Hillsdale Avenue West, between Yonge Street and a point 60 metres west. 6. Amended the existing stopping prohibition in effect from 10:00 a.m. to 6:00 p.m., Monday to Saturday, on the south side of Hillsdale Avenue West, between Yonge Street and a point 28 metres west, to be in effect at all times. 4. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Directed that Hillsdale Avenue West and Yonge Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south sidewalk and a 5.2-metre-wide portion of the eastbound curb lane on Hillsdale Avenue West, between Yonge Street and a point 46 metres west, from May 20, 2021 to December 31, 2022. 2. Toronto and East York Community Council designate Hillsdale Avenue West, between Yonge Street and a point 60 metres west, as one-way for eastbound traffic only at all times. 3. Toronto and East York Community Council prohibit southbound right turns and northbound left turns at all times, at the intersection of Yonge Street and Hillsdale Avenue West/Hillsdale Avenue East. 4. Toronto and East York Community Council amend the existing parking prohibition in effect at all times on the north side of Hillsdale Avenue West, between Yonge Street and Oriole Parkway, to be in effect from a point 60 metres west of Yonge Street and Oriole Parkway. 5. Toronto and East York Community Council prohibited stopping at all times on the north side of Hillsdale Avenue West, between Yonge Street and a point 60 metres west. 6. Toronto and East York Community Council amend the existing stopping prohibition in effect from 10:00 a.m. to 6:00 p.m., Monday to Saturday, on the south side of Hillsdale Avenue West, between Yonge Street and a point 28 metres west, to be in effect at all times. 4. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks and/or any proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. Toronto and East York Community Council direct that Hillsdale Avenue West and Yonge Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.30amended
Construction Staging Area - 409 Front Street East (Cooperage Street)
This staff report is about a matter that Community Council has delegated authority to make a final decision. EllisDon Corporation is constructing two towers with a total of 400 rental and condominium units connected by an eight-story podium with one level on underground parking and a row of townhomes along Cooperage Street at 409 Front Street East. In addition, a five-storey training and education centre will also be constructed on the subject site. The site encompasses the entire block bounded by Front Street East to the north, Cooperage Street to the east, Mill Street to the south and Cherry Street to the west. Transportation Services is requesting authorization to close the west sidewalk on Cooperage Street, between Front Street East and Mill Street, for a period of 41 months (i.e., May 20, 2021 to September 30, 2024) to accommodate a construction staging area. Pedestrian movements on the west side of Cooperage Street, abutting the site, will be restricted and pedestrians will be directed to the east-side sidewalk of Cooperage Street. Traffic lanes for both directions on Cooperage Street will be maintained in their current configuration. To ensure access to the site the paid parking on the west side of Cooperage Street will be removed, resulting in the loss of nine parking machine spaces.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk on Cooperage Street, between Front Street East and Mill Road, from May 20, 2021 to May 30, 2022. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of 3 hours, on the west side of Cooperage Street, between a point 37 metres north of Mill Street and a point 67 metres further north. 3. Prohibited stopping at all times on the west side of Cooperage Street, between a point 37 metres north of Mill Street and a point 67 metres further north. 4. Rescinded the existing parking prohibition in effect at all times on the east side of Cooperage Street, between a point 35 metres north of Mill Street and a point 60 metres further north 5. Prohibited stopping at all times on the east side of Cooperage Street, between a point 35 metres north of Mill Street and a point 60 metres further north. 6. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Directed that Cooperage Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Building, adjacent neighbours, and the Corktown Residents and Business Association.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk on Cooperage Street, between Front Street East and Mill Road, from May 20, 2021 to September 30, 2024. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $3.00 per hour and for a maximum period of 3 hours, on the west side of Cooperage Street, between a point 37 metres north of Mill Street and a point 67 metres further north. 3. Toronto and East York Community Council prohibit stopping at all times on the west side of Cooperage Street, between a point 37 metres north of Mill Street and a point 67 metres further north. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Cooperage Street, between a point 35 metres north of Mill Street and a point 60 metres further north 5. Toronto and East York Community Council prohibit stopping at all times on the east side of Cooperage Street, between a point 35 metres north of Mill Street and a point 60 metres further north. 6. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. Toronto and East York Community Council direct that Cooperage Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.31adopted
Construction Staging Area Time Extension - 25 Ontario Street
This staff report is about a matter that Community Council has delegated authority to make a final. First Gulf is constructing a 24-storey office building at 25 Ontario Street. The site is located on the southeast corner of Adelaide Street East and Ontario Street. The east sidewalk and a 3.3 metre wide portion of the most easterly curb lane on Ontario Street is currently closed to accommodate a construction staging area. Toronto and East York Community Council at its meeting on June 18, 2020, approved the subject staging area on Ontario Street from June 19, 2020 to June 30, 2021. Toronto and East York Community Council approved the construction staging area for a period of one year, although the developer had indicated they would require the construction staging area until September 30, 2022. The developer has experiences some delays due to COVID-19 that has delayed the completion of their project until the end of December 2022. Transportation Services is requesting authorization to extend the duration of the construction staging area for an additional 18 months (i.e. July 1, 2021 to December 31, 2022) to allow for the construction of the development to be completed. Pedestrian movements on the east side of Ontario Street abutting the site are restricted. A temporary pedestrian walkway along the closed portion of the east sidewalk could not be installed due to insufficient roadway width to maintain both the temporary walkway and the southbound traffic operations on Ontario Street.
The Toronto and East York Community Council: 1. Authorized the continuation of closure of the east sidewalk and a 3.3 metre wide portion of the southbound curb lane on Ontario Street, between Adelaide Street East and a point 47 metres south of Adelaide Street East, from July 1, 2021 December 31, 2022. 2. Directed the applicant to continue to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 3. Directed the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Directed the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas, resident associations and George Brown College administration, in advance of any physical road modifications. 5. Directed the applicant, in consultation with Transportation Services, to continue to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes and to ensure that pedestrians, cyclists and motorists safety are considered at all times. 6. Directed the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Directed the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Directed the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Directed the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed the applicant to continue a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 12. Directed that Ontario Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the continuation of closure of the east sidewalk and a 3.3 metre wide portion of the southbound curb lane on Ontario Street, between Adelaide Street East and a point 47 metres south of Adelaide Street East, from July 1, 2021 December 31, 2022. 2. Toronto and East York Community Council direct the applicant to continue to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 3. Toronto and East York Community Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 4. Toronto and East York Community Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas, resident associations and George Brown College administration, in advance of any physical road modifications. 5. Direct the applicant, in consultation with Transportation Services, to continue to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes and to ensure that pedestrians, cyclists and motorists safety are considered at all times. 6. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 7. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 8. Toronto and East York Community Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 9. Toronto and East York Community Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community Council direct the applicant to continue a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 12. Toronto and East York Community Council direct that Ontario Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.32amended
Construction Staging Area - 6-16 Wellesley Street West and 5-7 St. Nicholas Street
As the Toronto Transit Commission (TTC) operates a transit service on Wellesley Street West, City Council approval of this report is required. In addition, this report proposes the temporarily removal of the cycle track on the north side of Wellesley Street West abutting the development. Based on these conditions, this matter requires final approval by City Council. Wellesley Street Nickolas Residences Limited Partnership is constructing a 55-storey residential development building at 6-16 Wellesley Street West and 5-7 St. Nicholas Street. The site is located on the north side of Wellesley Street West, west of Yonge Street between Bistro Lane and St. Nickolas Street. Transportation Services is requesting authorization to close the north sidewalk and a 2.3-metre-wide portion of the eastbound curb lane/cycle track on Wellesley Street West, between Bistro Lane and St. Nickolas Street for a period of 54 months (i.e., July 1, 2021 to December 31, 2025) to accommodate a construction staging area. In addition, Transportation Services is requesting authorization to close St. Nickolas Street in its entirety, between Wellesley Street West and a point 43 metres north for a period of 54 months (i.e., July 1, 2021 to December 31, 2025) to accommodate a construction staging area. The construction staging area on Wellesley Street West will result in the loss of one eastbound traffic lane that is currently designated as a cycle track. Wellesley Street West, in the immediate vicinity of the site, will continue to operate with one eastbound lane and one westbound lane. The cycle track on the north side will be removed, so cyclists and motorists will travel single file. Signs indicating "Shared Use Lane Single File" will be installed to reflect this. Pedestrian movements on the north side of Wellesley Street West will be maintained in a covered and protected walkway within the closed portion of the eastbound lane. The construction staging area on St. Nicholas Street will require a full closure of St. Nicholas Street abutting the site. Currently there are no pedestrian facilities located on the east side of St. Nicholas Street. Pedestrians will be accommodated on the west side of the street within the existing sidewalk in its current configuration.
The Toronto and East York Community Council recommends that: 1. City Council authorize the closure of the north sidewalk and a 2.3-metre-wide portion of the eastbound curb lane on Wellesley Street West, between Bistro Lane and St. Nicholas Street, and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane from July 1, 2021 to June 30, 2022. 2. City Council authorize the closure of all of St. Nicholas Street, between Wellesley Street West and a point 43 metres north, from July 1, 2021 to June 30, 2022. 3.City Council rescind the existing designated cycle track on the north side of Wellesley Street West, between Yonge Street and a point 20 metres west of St. Nicholas Street. 4. City Council prohibit stopping at all times on the both sides of St. Nicholas Street, between Wellesley Street West and Phipps Street. 5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. City Council direct the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours and businesses, the Bay Cloverhill Community Association, and local resident groups. 14. City Council direct that Wellesley Street West and St. Nicholas Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the north sidewalk and a 2.3-metre-wide portion of the eastbound curb lane on Wellesley Street West, between Bistro Lane and St. Nicholas Street, and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane from July 1, 2021 to December 31, 2025. 2. City Council authorize the closure of all of St. Nicholas Street, between Wellesley Street West and a point 43 metres north, from July 1, 2021 to December 31, 2025. 3.City Council rescind the existing designated cycle track on the north side of Wellesley Street West, between Yonge Street and a point 20 metres west of St. Nicholas Street. 4. City Council prohibit stopping at all times on the both sides of St. Nicholas Street, between Wellesley Street West and Phipps Street. 5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. City Council direct the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, and local resident groups. 14. City Council direct that Wellesley Street West and St. Nicholas Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE25.33adopted
Accessible Parking Space - Shaw Street (Non-Delegated)
As the Toronto Transit Commission (TTC) operates a transit service on Shaw Street, City Council approval of this report is required. Transportation Services is requesting approval for the installation of an on-street accessible parking space on the east side of Shaw Street.
The Toronto and East York Community Council recommends that: 1. City Council designate an on-street accessible parking space on the east side of Shaw Street, between a point 51 metres south of Queen Street West and a point 5.5 metres further south.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council designate an on-street accessible parking space on the east side of Shaw Street, between a point 51 metres south of Queen Street West and a point 5.5 metres further south
TE25.34amended
Accessible Parking Spaces - May 2021 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Revised Attachment 1 dated May 19, 2021 attached to the report (April 29, 2021) from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 attached to the report dated April 29, 2021 from the Acting Director, Traffic Management, Transportation Services.
TE25.35adopted
Parking Amendments - Soudan Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that stopping be prohibited at all times on the north and south sides of Soudan Avenue, between Yonge Street and Holly Street. This is in response to complaints about vehicles parking in the existing "No Parking Anytime" areas and creating congestion and traffic flow concerns on this section of Soudan Avenue. This will discourage illegal parking and not allow parking by vehicles with accessible permits. This proposal will not result in the loss of any parking spaces on Soudan Avenue.
The Toronto and East York Community Council: 1. Rescinded the existing standing prohibition in effect at all times, on the north side of Soudan Avenue, between Yonge Street and a point 38 metres east of Yonge Street. 2. Rescinded the existing parking prohibition in effect at all times, on the north side of Soudan Avenue, between a point 38 metres east of Yonge Street and Holly Street. 3. Rescinded the existing parking prohibition in effect at all times, on the south side of Soudan Avenue, between Yonge Street and Brownlow Avenue. 4. Authorized stopping prohibition to be in effect at all times, on the north side of Soudan Avenue, between Yonge Street and Holly Street. 5. Authorized stopping prohibition to be in effect at all times, on the south side of Soudan Avenue, between Yonge Street and Holly Street. 6. Authorized parking prohibition to be in effect at all times, on the south side of Soudan Avenue, between Holly Street and Brownlow Avenue.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times, on the north side of Soudan Avenue, between Yonge Street and a point 38 metres east of Yonge Street. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the north side of Soudan Avenue, between a point 38 metres east of Yonge Street and Holly Street. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the south side of Soudan Avenue, between Yonge Street and Brownlow Avenue. 4. Toronto and East York Community Council authorize stopping prohibition to be in effect at all times, on the north side of Soudan Avenue, between Yonge Street and Holly Street. 5. Toronto and East York Community Council authorize stopping prohibition to be in effect at all times, on the south side of Soudan Avenue, between Yonge Street and Holly Street. 6. Toronto and East York Community Council authorize parking prohibition to be in effect at all times, on the south side of Soudan Avenue, between Holly Street and Brownlow Avenue.
TE25.36adopted
Parking Amendment - Westmount Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that standing be prohibited at all times on the west side of Westmount Avenue, between a point 31.2 metres north of Rogers Road and a point 9.8 metres further north. This is in response to multiple instances where a parked vehicle would partially block the driveway access at 416 and 402 Westmount Avenue. This proposal will improve driveway access at these premises and will not result in the loss of any parking spaces on Westmount Avenue.
The Toronto and East York Community Council: 1. Prohibited standing at all times on the west side of Westmount Avenue, between a point 31.2 metres north of Rogers Road and a point 9.8 metres further north.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council prohibit standing at all times on the west side of Westmount Avenue, between a point 31.2 metres north of Rogers Road and a point 9.8 metres further north.
TE25.37amended
Traffic Calming - Monarch Park Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has reviewed the need for traffic calming (speed humps) on Monarch Park Avenue, between Sammon Avenue and Mortimer Avenue. The assessment indicates the warrant criteria as set out in the City of Toronto's Traffic Calming Policy has not been satisfied. Therefore, staff do not recommend the installation of speed humps on Monarch Park Avenue.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Monarch Park Avenue. 2. Directed the City Solicitor to prepare a by-law to alter sections of the roadway on Monarch Park Avenue, for traffic calming purposes, generally as shown on the copy of Drawing No. 421G-3861, dated April 2021, attached to the report (April 29, 2021) from the Acting Director, Transportation Services, Toronto and East York District.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming (speed humps) on Monarch Park Avenue, between Sammon Avenue and Mortimer Avenue.
TE25.38amended
Traffic Calming (Speed Humps) - St Hubert Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has reviewed the need for traffic calming (speed humps) on St Hubert Avenue, between O'Connor Drive and Plains Road. The assessment indicates the warrant criteria as set out in the City of Toronto's Traffic Calming Policy has not been satisfied. Therefore, staff do not recommend the installation of speed humps on St Hubert Avenue.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed humps) on St Hubert Avenue. 2. Directed the City Solicitor to prepare a by-law to alter sections of the roadway on St Hubert Avenue, for traffic calming purposes, generally as shown on the copy of Drawing No. 421G-3864, dated April 2021, attached to the report (April 29, 2021) from the Acting Director, Transportation Services, Toronto and East York District.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming (speed humps) on St Hubert Avenue, between O'Connor Drive and Plains Road.
TE25.39adopted
Appointment of Public Members to the William H. (Bill) Bolton Arena Board
City Council has authorized the City Clerk to shortlist, interview and recommend candidates to Community Councils for appointment to the William H. (Bill) Bolton Arena Board. This report recommends five candidates for appointment to the board.
The Toronto and East York Community Council: 1. Appointed the following candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on May 20, 2025, and until successors are appointed: - Craig Cameron - Peter Diaz - Brittney Grundy - Michael Kane - Stephen Longstaff
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint the following candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on May 20, 2025, and until successors are appointed: - Craig Cameron - Peter Diaz - Brittney Grundy - Michael Kane - Stephen Longstaff
TE25.40adopted
Re-Opening Item TE24.69: Traffic Calming Poll Results - Cottingham Street
City staff have advised me that there has been a clerical error made on item TE24.69 at last month's Community Council meeting. This led to the adoption of an incomplete alternate recommendation. Staff have asked me to re-open this item so that necessary amendments can be made and the by-law corrected. Transportation Services and City Clerk's staff have been consulted and have provided the corrected recommendation wording.
The Toronto and East York Community Council: 1. Re-opened item TE24.69: Traffic Calming Poll Results - Cottingham Street. 2. Deleted Recommendation 1 in TE24.69 and replaced it with the following new recommendations: a. Authorized the installation of traffic calming (speed humps) on Cottingham Street, between Avenue Road and Gange Avenue, despite poll results that did not satisfy the polling criteria for the installation of speed humps pursuant to the City's Traffic Calming Policy. b. Directed the City Solicitor to prepare a by-law to alter the roadway to install four speed humps on Cottingham Street, between Avenue Road and Gange Avenue, generally as shown on Attachment 1, Drawing No 421G - 3771, dated August 2020, attached to the report entitled "Traffic Calming Poll Results - Cottingham Street " from the Acting Director, Traffic Management, Transportation Services."
Staff recommendation as filed
It is recommended that the Toronto and East York Community Council: 1. Re-open item TE24.69: Traffic Calming Poll Results - Cottingham Street. 2. Delete Recommendation 1 in TE24.69 and replace it with the following new recommendations: a. Authorize the installation of traffic calming (speed humps) on Cottingham Street, between Avenue Road and Gange Avenue, despite poll results that did not satisfy the polling criteria for the installation of speed humps pursuant to the City's Traffic Calming Policy. b. Direct the City Solicitor to prepare a by-law to alter the roadway to install four speed humps on Cottingham Street, between Avenue Road and Gange Avenue, generally as shown on Attachment 1, Drawing No 421G - 3771, dated August 2020, attached to the report entitled "Traffic Calming Poll Results - Cottingham Street " from the Acting Director, Traffic Management, Transportation Services."
TE25.41adopted
Residents in the Earlscourt neighbourhood have contacted my office with concerns about vehicles travelling at high and unsafe speeds along Lansdowne Avenue, especially where there is a bend in the road. This corner is located near the entrance of Earlscourt Park. Following a motorist losing control of their vehicle and crashing into fencing in the park, a guard rail was installed at this corner, on the inside of the sidewalk, to deflect and slow down errant vehicles from leaving the roadway. However, the placement of the guard rail does not protect the outside sidewalk and leaves pedestrians exposed. I reached out to Traffic Operations and asked them for guidance on these issues and to make recommendations to address them. As a result, and after having consulted with area residents, I am recommending that we move to report back on and investigate the feasibility of their request to have an outside guard rail installed as outlined below.
The Toronto and East York Community Council: 1. Directed the General Manager, Transportation Services, to investigate the feasibility and impact of relocating the existing guard rail system on Lansdowne Avenue, located approximately 100 metres to 140 metres north of Davenport Road, from between the Tennis Courts and the sidewalk to between the sidewalk and the road.
Staff recommendation as filed
Councillor Bailão recommends that: 1. The Toronto and East York Community Council direct the General Manager, Transportation Services, to investigate the feasibility and impact of relocating the existing guard rail system on Lansdowne Avenue, located approximately 100 metres to 140 metres north of Davenport Road, from between the Tennis Courts and the sidewalk to between the sidewalk and the road.
TE25.42adopted
No Parking - Terra Nova Retirement Home - 1289 Dundas Street West
Terra Nova is a retirement home located at 1289 Dundas Street West in the Little Portugal neighbourhood. In front of the building is a section of the street marked by outdated "yellow lollipop" No Parking Signs, which were installed by the pre-amalgamation City of Toronto. The space is regularly used to drop-off residents as well as by Wheel-Trans and ambulances. However, these signs have no legal authority and are not enforceable by the Toronto Parking Authority (PKE), which has led to cars parking in front of the retirement home when technically they should not be located in this area. Guidance from the City's Traffic Operations division was sought with respect to making a recommendation on this issue concerning the area in front of Terra Nova, and as a result I am recommending that the parking by-law be amended as outlined below.
The Toronto and East York Community Council recommends that: 1. City Council prohibit parking at all times on the south side of Dundas Street West, between a point 101.3 metres east of Lisgar Street and a point 10. 0 metres further east.
Staff recommendation as filed
Councillor Bailão recommends that: 1. City Council prohibit parking at all times on the south side of Dundas Street West, between a point 101.3 metres east of Lisgar Street and a point 10. 0 metres further east.
TE25.43adopted
Recently, several small businesses contacted my office regarding the No Stopping prohibition and lack of on-street parking available to customers on Edwin Avenue north of Dupont Street, which has had a negative impact on sales. Because Edwin Avenue and Dupont Street is a signalized intersection, vehicles are required to comply with a No Parking prohibition of 30.5 metres as per Chapter 950 section E (3). Guidance from the City's Traffic Operations division was sought with respect to making a recommendation on this issue concerning this portion of Edwin Avenue, and as a result I am recommending the following amendment as outlined below.
The Toronto and East York Community Council: 1. Amended the existing no stopping prohibition in effect at all times on both sides of Edwin Avenue, between Dupont Street and a point 28 metres north, to be in effect only on the west side.
Staff recommendation as filed
Councillor Bailão recommends that: 1. The Toronto and East York Community Council amend the existing no stopping prohibition in effect at all times on both sides of Edwin Avenue, between Dupont Street and a point 28 metres north, to be in effect only on the west side.
TE25.44adopted
Realignment of Permit Parking Area "2-" to Exclude 181 Sterling Road
The exclusion of the development located at 181 Sterling Road from the 2-permit parking area is a means to ensure that current permit holders have sufficient parking space. The issuance of on-street parking permits to tenants of this new residential developments would negatively impact on the already limited supply of parking spaces for nearby residents. I am therefore requesting approval from Toronto and East York Community Council to prohibit the General Manager, Transportation Services, from accepting applications from residents of, visitors to, and tradespersons at the subject development property. Residents have reported that it is difficult to find a parking space close to home. The request is to ensure the balance of parking within area 2-from the potential influx from another development in the neighbourhood.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "2-" to exclude the development located at 181 Sterling Road.
Staff recommendation as filed
Councillor Bailão recommends that: 1. The Toronto and East York Community Council request the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "2-" to exclude the development located at 181 Sterling Road.
TE25.45adopted
Realignment of Permit Parking Area "5C" to exclude the development located at 374-388 Dupont Street
The availability of permit parking in our neighbourhoods continues to be a hot topic of discussion among residents, new, old, and former. The increasing density we are seeing from development does not suggest that our current model for on-street parking availability is one that is equitable, nor that it can support any new residents to the area moving forward. By taking steps to eliminate access to parking spaces we can help promote less dependency on a personal vehicle, and protect the available public supply for general use. The exclusion of the development located at 374-388 Dupont Street from the 5C permit parking area is also a means to ensure that current permit holders have sufficient parking spaces and we are not oversubscribing any one area from access to public parking availability. The issuance of parking permits to residents of this development would negatively impact on the already limited supply of on-street parking spaces in the area.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "5C" to exclude the development located at 374-388 Dupont Street.
Staff recommendation as filed
Councillor Layton recommends that: 1. Toronto and East York Community Council request the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "5C" to exclude the development located at 374-388 Dupont Street.
TE25.46adopted
Traffic Control Signals - 740 Dupont Street
As part of the proposal at 740 Dupont Street, a new traffic control signal is proposed to be installed at the site driveway connection to Dupont Street. The proposed traffic control signal will be located on Dupont Street, approximately 145 metres west of Christie Street. In support of this traffic signal control, the applicant has submitted detailed traffic signal, functional, and civil plans for the new intersection. These plans illustrate the required electrical and civil infrastructure work, along with pavement marking and signage for the new intersection and traffic control signal. The applicant will be responsible to fund and construct all of the related works shown on the plans to complete the full signalized intersection on Dupont Street. No further on-street parking or turning restrictions will be implemented on Dupont Street as part of this traffic signal control implementation. As the Toronto Transit Commission (TTC) operates a transit service on Dupont Street, City Council approval of this report is required.
The Toronto and East York Community Council recommend that: 1. City Council authorize the installation of traffic control signals at the intersection of Dupont Street and the private access located approximately 145 metres west of Christie Street.
Staff recommendation as filed
Councillor Layton recommends that Toronto and East York Community Council recommend that: 1. City Council authorize the installation of traffic control signals at the intersection of Dupont Street and the private access located approximately 145 metres west of Christie Street.
TE25.47adopted
Nomination for Appointment to the Board of Directors of the Crescent Town Club Inc.
The Crescent Town Community Centre is a non-City recreation centre that was established under a Borough of East York development agreement in 1971. The City of Toronto is required to submit the names of two nominees to the Board of Directors, both for a three year term. The nominees are recommended by the Toronto East York Community Council. The names of the below nominees, once Community Council has made its decision, will be submitted by the City of Toronto to the Crescent Town Club. Consideration of this motion by Toronto and East York Community Council is requested as the names of the City's nominees will be considered at the Crescent Town Club Inc. Annual General Meeting on June 24, 2021.
The Toronto and East York Community Council recommends that:   1. City Council nominate Naseem Mithoowani and Kathy Priestman for appointment to the Crescent Town Club Inc. Board of Directors for a three-year term ending on June 2024.
Staff recommendation as filed
Councillor Bradford recommends to the Toronto and East York Community Council that:   1. City Council nominate Naseem Mithoowani and Kathy Priestman for appointment to the Crescent Town Club Inc. Board of Directors for a three-year term ending in June 2024.
TE25.48adopted
All-Way Stop at the Intersection of Oak Park Avenue and Gates Avenue
Residents have reached out to my office with concerns about road safety and speeding along Oak Park Avenue. They have reported drivers speeding as they travel north from the Danforth, using Oak Park as a cut through to avoid busier streets. My office polled the homes near the intersection of Oak Park and Gates Avenue, and over 80 percent of residents supported changing the existing 2-way stop into an all-way stop as a method of traffic calming for the neighbourhood. To keep making our community safer for all, I recommend installing an all-way stop at this intersection.
The Toronto and East York Community Council: 1. Authorized all-way stop controls at the intersection of Oak Park Avenue and Gates Avenue.
Staff recommendation as filed
Councillor Bradford recommends that: 1. The Toronto and East York Community Council authorize all-way stop controls at the intersection of Oak Park Avenue and Gates Avenue.
TE25.49adopted
Amend Parking Regulations on Church Street, between Wood Street and Alexander Street
Over the past four years, my office has been in deep conversation with City staff, Toronto District School Board, Church Wellesley Village BIA, Church Wellesley Neighbourhood Association, local business and community members about opportunities for public realm improvements in the area, especially on Church Street. Central to our discussions was the community ambitions to produce a significant placemaking opportunity by replacing the failing and outdated fence of the school. To that effect and through City Council approval, my office provided $1,051,744.54 to the Church Street Public School through s.37 and s.45(9) funding for the the creation, design and installation of a customized decorative fence and public art installation around the perimeter of the school. The central piece of this new public work will be prominently featured on the west fence at the Church Street Public School. The Church Wellesley community has rightly expressed a desire to further improve pedestrian safety, maintain clear sightlines and significantly beautify Church Street by ensuring that the new public art and significant public investment can be appreciated and seen at all time without any visual obstructions caused by parked vehicles. In preparation for the completion and permanent unveiling of this new artwork, there have been community requests to prohibit parking at any time on the east side of Church Street, between Wood and Alexander Streets.
The Toronto and East York Community Council: 1. Rescinded the parking prohibition in effect from 7:30 a.m. to 3:30 p.m., Monday to Friday, on the east side of Church Street, between Wood Street and Alexander Street. 2. Prohibited standing at all times on the east side of Church Street, between Wood Street and Alexander Street.
Staff recommendation as filed
Councillor Wong-Tam recommends that: 1. Toronto and East York Community Council rescind the parking prohibition in effect from 7:30 a.m. to 3:30 p.m., Monday to Friday, on the east side of Church Street, between Wood Street and Alexander Street. 2. Toronto and East York Community Council prohibit standing at all times on the east side of Church Street, between Wood Street and Alexander Street.
TE25.50amended
Pedestrianizing Market Street and Leader Lane
Figuring out how to better use our physical infrastructure is increasingly important as we look to create healthier, safer and more active communities. The St. Lawrence Market Neighbourhood Business Improvement Area (BIA) has been reviewing streets within its catchment and have identified two streets within, Market Street and Leader Lane, as having the potential to be transformed into pedestrian-only streets that support these goals. Market Street, between Front Street East and The Esplanade, was designed as a flexible, curbless street in 2013. Adjacent to the historic St. Lawrence Market, Market Street currently accommodates one-way southbound traffic, with parking on both sides. During the summer and fall, parking on the west side of the road is turned into space for restaurant patios. Its design was chosen in part to allow Market Street to easily be closed to vehicular traffic, with the long-term intention to see the street closed to vehicles. Aside from being a draw for pedestrians, this closure could help assist Market Street restaurants and St. Lawrence Market Street vendors who have struggled during this pandemic. Leader Lane, between Colborne Street and Wellington Street East, is a city laneway that accommodates one-way southbound traffic. The BIA and community desires to see the laneway closed to create a safer, more attractive connection to Berczy Park, and have partnered with the Laneway Project with plans to "winterize it" this year. While it does accommodate limited servicing for buildings in the area, the BIA has been working closely with stakeholders to redirect loading/unloading off this laneway. Closure for the summer will benefit the Wellington Street reconstruction and remove the need to accommodate traffic during construction. The St. Lawrence Market Neighbourhood BIA would like to see these streets piloted for a temporary closure this summer to review and implement changes that would help benefit local residents and businesses. The BIA would also like to explore what a long-term closure beyond 2021 would look like.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services, to consult with the Manager, St Lawrence Market Complex, Corporate Services, St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, and other City divisions and stakeholders as identified about the temporary closure of Market Street, between Front Street East and The Esplanade this year, and if required, to report back to the June 24, 2021 meeting of Toronto and East York Community Council to implement this temporary closure. 2. Requested the General Manager, Transportation Services, to consult with the Manager, St Lawrence Market Complex, Corporate Services, St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, and other City divisions and stakeholders as identified about the permanent closure of Market Street, between Front Street East and The Esplanade, and to report back to the November 24, 2021 meeting of Toronto and East York Community Council with recommendations regarding closing this section of Market Street permanently. 3. Requested the General Manager, Transportation Services, to consult with the St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, representatives from 30 Wellington Street East and other City divisions and stakeholders as identified about the temporary closure of Leader Lane, between Colborne Street and Wellington Street East this year, and to report back to the June 24, 2021 meeting to Toronto and East York Community Council if required to implement this temporary closure. 4. Requested the General Manager, Transportation Services, to consult with the St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, representatives from 30 Wellington Street East and other City divisions and stakeholders as identified about the permanent closure of Leader Lane, between Colborne Street and Wellington Street East this year, and to report back to the November 24, 2021 meeting of Toronto and East York Community Council with recommendations regarding closing this section of Leader Lane permanently.
Staff recommendation as filed
Councillor Wong-Tam recommends that: 1. Toronto and East York Community Council request the General Manager, Transportation Services, to consult with the Manager, St Lawrence Market Complex, Corporate Services, St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, and other City divisions and stakeholders as identified about the temporary closure of Market Street, between Front Street East and The Esplanade this year, and if required, to report back to the June 24, 2021 meeting of Toronto and East York Community Council to implement this temporary closure. 2. Toronto and East York Community Council request the General Manager, Transportation Services, to consult with the Manager, St Lawrence Market Complex, Corporate Services, St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, and other City divisions and stakeholders as identified about the permanent closure of Market Street, between Front Street East and The Esplanade, and to report back to the November 24, 2021 meeting ofToronto and East York Community Council with recommendations regarding closing this section of Market Street permanently. 3. Toronto and East York Community Council request the General Manager, Transportation Services, to consult with the St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, representatives from 30 Wellington Street East and other City divisions and stakeholders as identified about the temporary closure of Leader Lane, between Colborne Street and Wellington Street East this year, and to report back to the June 24, 2021 meeting to Toronto and East York Community Council if required to implement this temporary closure. 4. Toronto and East York Community Council request the General Manager, Transportation Services, to consult with the St. Lawrence Market Neighbourhood Business Improvement Area, the St. Lawrence Neighbourhood Association, representatives from 30 Wellington Street East and other City divisions and stakeholders as identified about the permanent closure of Leader Lane, between Colborne Street and Wellington Street East this year, and to report back to the November 24, 2021 meeting ofToronto and East York Community Council with recommendations regarding closing this section of Market Street permanently.